ML20198H621

From kanterella
Jump to navigation Jump to search

Forwards Notice of Withdrawal of 970826,as Suppl 980424 & 0924 Amend Request for FOL NPF-57.Proposed Change Would Have Modified Facility TSs Pertaining to Filtration,Recirculation & Ventilation Sys Surveillance Testing Requirements
ML20198H621
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/24/1998
From: Richard Ennis
NRC (Affiliation Not Assigned)
To: Keiser H
Public Service Enterprise Group
Shared Package
ML20198H624 List:
References
TAC-M99477, NUDOCS 9812290381
Download: ML20198H621 (3)


Text

Mr. Harold W. Keiser December 24, 1998 i

Chief Nuclear Officer & President-Nuclear Business Unit Public Service Electic & Gas Company Post Office Box 236 Hancocks Bridge. NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION, WITHDRAWAL OF AN AMENDMENT REQUEST, FILTRATION, RECIRCUI.ATION, AND VENTILATION SYSTEM SURVEILLANCE TESTING REQUIREMENTS (TAC NO. M99477)

Dear Mr. Keiser:

(

By "LR-N970537, Forwards Revs 1 & 2 of HCGS Cycle 7/Reload 6 COLR, NFS-0145, IAW [[TS" contains a listed "[" character as part of the property label and has therefore been classified as invalid..9|letter dated August 26,1997]], as supplemented April 24,1998, and September 24,1998, Public Service Electric and Gas Company (PSE&G) applied for an amendment to the Hope Creek Generating Station Operating Ucense, No. NPF-57. The proposed change would have modified the facility technical specifications pertaining to the Filtration, Recirculation and Ventilation System (FRVS) surveillance testing requirements. Subsequently, by letter dated December 21,1998, PSE&G withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/s/

Richard B. Ennis, Project Manager Project Directorate 1-2 Division of Reactor Projects - t/11 Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosure:

Notice of Withdrawal cc w/ encl: See next page DISTRIBUTION Docket File RCapra OGC PUBLIC REnnis ACRS PDI-2 Reading TClark JZwolinski JLinville RGN-l

)

OFFICE PDI-2/PM PDl-3/LA PDI-2/D NAME REnnisN TClark. N' RCapr lA 23 /%

14 / F /

12/W/

DATE

/

OFFICIAL RECORD COPY DOCUMENT NAME: HCMA99477.Wil

-crG'N]}b 9812290381 981224 fDR ADUCK 0500 4

"Ji y

l

Mau g

S UNITED STATES s

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066tKlo01 k[w 4

December 24, 1998 Mr. Harold W. Keiser Chief Nuclear Officer & President-Nisclear Business Unit Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION, WITHDRAWAL OF AN AMENDMENT REQUEST, FILTRATION, RECIRCULATION, AND VENTILATION SYSTEM SURVEILLANCE TESTING REQUIREMENTS (TAC NO. M99477)

Dear Mr. Keiser By "LR-N970537, Forwards Revs 1 & 2 of HCGS Cycle 7/Reload 6 COLR, NFS-0145, IAW [[TS" contains a listed "[" character as part of the property label and has therefore been classified as invalid..9|letter dated August 26,1997]], as supplemented April 24,1998, and September 24,1998, Public Service Electric and Gas Company (PSE&G) applied for an amendment to the Hope Creek Generating Station Operating Ucense, No. NPF-57. The proposed change would have modified the facility technical specifications pertaining to the Filtration, Recirculation and Ventilation System (FRVS) surveillance testing requirements. Subsequently, by letter dated December 21,1998, PSE&G withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, Richard B. Ennis, Project Manager Project Directorate 1-2 Division of Reactor Projects -l/II Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosure:

Notice of Wittdrawal e

cc w/ encl: See next page l

M

Mr. Harold W. Keiser Hope Creek Generating Station Public Service Electric & Gas Company cc:

Jeffrie J. Keenan, Esquire Manager-Joint Generation Nuclear Business Unit-N21 Atlantic Energy P.O. Box 236 6801 Black Horse Pike Hancocks Bridge, NJ 08038 Egg Harbor Twp., NJ 08234-4130 Hope Creek Resident inspector Richard Hartung U.S. Nuclear Regulatory Commission Electric Service Evaluation Drawer 0509 Board of Regulatory Commissioners Hancocks Bridge, NJ 08038 2 Gateway Center, Tenth Floor Newark, NJ 07102 Mr. Louis Storz Sr. Vice President - Nuclear Operations Lower Alloways Creek Township Nuclear Department c/o Mary O. Henderson, Clerk P.O. Box 236 Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 General Manager - Hope Creek Operations Mr. Elbert Simpson Hope Crcek Generating Station Senior Vice President-P.O. Box 236 Nuclear Engineering Hancocks Bridge, NJ 08038 Nuclear Department P.O. Box 236 Director-Licensing Regulation & Fuels Hancocks Bridge, NJ 08038 Nuclear Business Unit-N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Regional Adm:nistrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs NJ Department of Environmental Protection and Energy CN 415 Trenton, NJ 08625-0415

- - - - - - - -