DEC 131985
1
Docket No. 50-354
_
Public Service Electric & Gas Company
ATTN: Mr. T. J. Martin
Vice President
Engineering and Construction
80 Park Plaza - 17C
Newark, New Jersey 07101
Gentlemen:
Subject:
Inspection Report No. 50-354/85-51
.
This refers to the routine safety inspection conducted by L. S. Cheung of this
'
office on October 21-25, 1985, at Hope Creek Generating Station, Hancocks Bridge,
New Jersey, of activities authorized by NRC License No. CPPR-120 and to the
discussions of our findings held by Mr. L. S. Cheung with Mr. A. Giardino of
your staff at the conclusion of the inspection, and to subsequent telephone
discussions between Mr. A. Giardino and Mr. L. S. Cheung on November 26, 1985,
and between Mr. A. Giardino and Mr. C. Anderson on December 12,-1985.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that two of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
These violations have been
categorized by severity level in accordance with the revised NRC Enforcement
Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8583)
dated March 8, 1984. You are required to respond to this letter and in preparing
'
your response, you should follow the instructions in Appendix A.
With regard to
the violation relating to the incorrect wiring discussed in section 4.0 of this
report, you should establish the reason for the incorrect terminations and poten-
tial application to other wiring and report your conclusions to this office on
an expedited basis.
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
8512180306 851213
Original Signed By:
ADOCK 05000354
0
Stewart D. Ebne
r, Director
Division of Reactor Safety
OFFICIAL RECORD COPY
IR HC 85-51 - 0001.0.0
/ho[)
l
12/13/85
j
>,i
-.
e
.
Public Service Electric & Gas Co.
-2-
,
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Number 50-354/85-51
cc w/ enc 1:
A. 'E. Giardino, Manager, Quality Assurance Engineering and Construction
R. L. Mitt 1, General Manager, Nuclear Assurance and Regulation
. A. J. Pietrofitta, General Manager, Power Production Engineering,
Atlantic Electric
Rebecca A. Green, Bureau of Radiation Protection
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
'J. Grant, DRP
J. Strosnider, DRP
l
RI:DRS
RI:DRS
[F
Cheung/k1
Anderson
Durr
12/ /85
12/ /* /85
12/ rl-/85
c f p g c.
C[9
0FFICIAL RECORD COPY
IR HC 85-51 - 0002.0.0
11/14/85
u