ML20196E647

From kanterella
Jump to navigation Jump to search
Forwards Revised marked-up TS Page for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively. Revised Pages Do Not Alter Conclusions Reached in 10CFR50.92 No Significant Hazards Analysis Previously Submitted
ML20196E647
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/21/1999
From: Eric Simpson
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196E652 List:
References
LR-N99279, NUDOCS 9906280362
Download: ML20196E647 (3)


Text

. .

Puuc Servce Electro and Gas Company E. C. simpson Public Service Electric and Gas Company PO Box 236, Hancocks Bridge. NJ 08038 609-339-1700 Senror Vme Prescent - Nuclear Engirmenng JUN 211999 LR-N99279 LCR H99-02 LCR H99-05 l

United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 REVISED MARKED-UP TECHNICAL SPECIFICATION PAGES HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 Gentlemen:

This letter provides revised mamed-up Technical Specification pages for Hope Creek License Change Request (LCR) H99-02, which was submitted to the NRC via letter LR-N99096, dated March 29,1999. On May 7,1999, the NRR Hope Creek Project Manager notified PSE&G of changes that were required to the marked-up Technical Specification pages contained in the LCR H99-02 submittal. PSE&G has reviewed these changes and, as indicated in Attachment 1 of this letter, is providing revised Technical Specification page mark-ups for LCR H99-02. PSE&G has determitied that the information contained in the Attachment to this letter does not alter the conclusions reached in the 10CFR50.92 No Significant Hazards analysis previously submitted with LCR H99-02.

> )

Attachment 2 of this submittal contains a revised marked-up Technical Specification page associated with LCR H99-05, submitted to the NRC via letter LR-N99236, dated May 24,1999. The revised page provides an additional editorial change for that ,

submittal and does not alter the conclusions reached in the 10CFR50.92 No Significant  !

Hazards analysis previously submitted with LCR H99-05.

Should you have any questions regarding this request, please contact Mr. James Priest al 009-339-5434.

vlo Sincerely,

/ .

9906280362 990621 v f y

ly##'

[^ D

]

Oc6 ]

Dodumen't Control Desk '2-LR-N99279 JUN 211999 i

Affidavit Attachments (2)

JPP C Mr. H. Miller, Administrator - Region i U. S. Nuclear Regulatory Commission l 475 Allendale Raad 1 King of Prussia, PA 19406 )

l Mr. R. Ennis, Licensing Project Manager - Hope Creek U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 8B1 l 11555 Rockville Pike i Rockville, TAD 20852 USNRC Resident inspector Office (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering j P. O. Box 415  !

Trenton, NJ 08625 )

I l

l 1

s I

i 95-4933 t_

l REF: LR-N99279 LCR H99-02 LCR H99-05 STATE OF NEW JERSEY )

) SS.

COUNTY OF SALEM )

E. C. Simpson, being duly sworn according to law deposes and says:

I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning Hope Creek Generating Station, Unit 1, are true to the best of my knowledge, information and belief.

/ ,

/hA/)d?fk1 Subscribed and Sworn to before me '

this c2 i-day of Op .1999 f>La0h Notary Publidf14ew JMcey '

NOTARY PUBUC OF NEW JERSEY My Commission expires on M mmW Epn Apd 25, M