ML20154F112
| ML20154F112 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 10/02/1998 |
| From: | Ruland W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H Public Service Enterprise Group |
| Shared Package | |
| ML20154F117 | List: |
| References | |
| 50-354-98-09, 50-354-98-9, NUDOCS 9810090083 | |
| Download: ML20154F112 (3) | |
See also: IR 05000354/1998009
Text
3
,,
j
.
October 2, 1998
Mr. Harold W. Keiser
- Executive Vice President
Nuclear Business Unit
Public Service Electric & Gas Company
Post Office Box 236
Hancocks Bridge, New Jersey 08038
SUBJECT:
NRC INSPECTION REPORT 50-354/98-09
Dear Mr. Keiser:
,
This refers to the engineering inspection conducted on August 17 to 26,1998, and
September 8,1998, at the Hopo Creek Generating Station. The inspection included an
assessment of the current fuel reload core design and effectiveness of the engineering
functions in this area; a review of the current level of engineering backlogs and ongoing
efforts to reduce it; and an evaluation of the adequacy of the actions to address previously
identified issues._ The enclosed report presents the results of that inspection. The results
were discussed onsite with Mr. B. Simpson, and other members of your staff, on
September 8,1998.
4
'
The inspectors determined that the reactor engineering staff maintained acceptable control
over fuel reload core design. The inspectors also found the actions to address nine
previously identified violatlons and unresolved items acceptable and the issues were
'
l
closed.' The current level of backlogged engineering activities continued to be high, but
improvements were noted in this area.
We appreciate your cooperation with us in this matter, in accordance with 10 CFR 2.790
of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in
the NRC Public Document Room (PDR). If you have any questions or comments, please
{
call me at (610) 337-5376.
Sincerely,
,
l
\\
ORIGINAL SIGNED BY:
William H. Ruland, Chief
Electrical Engineering Branch
V, g \\.
]
Division of Reactor Safety
Docket No:
50-354
License No: NPF-57
i
9810090083 981002
ADOCK 05000354
G
-
. .
. ;_--__.
.
-
..
-
-
_-
. . .
.
_
. - - _ . _ . . . _ . . ._
. _ . . -
. . _ ~ . _ _
_ _ . . _ _ _ _ _
. _ - .
_ _ . _ . . . _ _ . . .
. . . _ . . _ _ _
_
.-
't
.
Mr. Harold W. Keiser
2
Enclosure:
Inspection Report 50-354/98-09
cc w/ encl:
L. Storz, Senior Vice President - Nuclear Operations
E. Simpson, Senior Vice President - Nuclear Engineering
E. Salowitz, Director - Nuclear Business Support
A. F. Kirby, Ill,, External Operations - Nuclear, Delmarva Power & Light Co.
J. A. Isabella, Manager, Joint Generation
Atlantic Electric-
M. Bezilla, General Manager - hope Creek Operations
J. McMahon, Director - QA/ Nuclear Training / Emergency Preparedness
D. Powell, Director - Licensing / Regulation & Fuels
R. Kankus, Joint Owner Affairs
A. C. Tapert, Program Administrator
Jeffrey J. Keenan, Esquire
Consumer Advocate, Office of Consumer Advocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
State of New Jersey
State of Delaware
i
!
(
,.
. _ ,
.
-
-
-
-
_.._
__
_
__
_
.
.
~
_
__ _
_ _
'
l'
i
l
Mr. Harold W. Keiser
3
!
Distribution w/ encl:
'
Region i Docket Room (with concurrences)
l
Nuclear Safety Information Center (NSIC)
'
NRC Resident inspector
PUBLIC
H. Miller, RA/W. Axelson, DRA
J. Linville, DRP
S. Barber, DRP
l
L. Harrison, DRP
!
C. O'Daniell, DRP
i
J. Wiggins, DRS
' L. Nicholson, DRS
l
N.' DellaGreca, DRS
!
C. Miskey, DRS
!
D. Vito, ORA
l
Distribution w/enci: (Via E-Mail)
l
B. McCabe, OEDO
l
R. Capra, PDl-2, NRR
R. Ennis, Project Manager, NRR
R. Correia, NRR
!
F. Talbot, NRR
inspection Program Branch, NRR (IPAS)
DOCDESK
i
l
i
DOCUMENT NAME: G:\\EEB\\DELLAGRE\\HC9809. INS
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
"E" =
,
l
Copy with attachment / enclosure
"N" = No copy
j
OFFICE
Rl/DRS @l
Rl/DRP
j l
Rl/DRSg ,
G
l
NAME
ADeliaGreca '
JLinville Yi
WRulandQ)/if)L
.
,
DATE
09/28/98
S9///980
09ff/98
09/ /98
09/ /98
'
,
l
l0
OFFICIAL RECORD COPY
- ) & Y b " f N frl h y
f
'
f
.
ffa
<
1
- .
.
.