ML20248J176
| ML20248J176 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 03/31/1989 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML20248J180 | List: |
| References | |
| NUDOCS 8904140344 | |
| Download: ML20248J176 (2) | |
See also: IR 05000354/1989002
Text
_
.-
_
- _ _ - _ -
-
-
__
_ _ _
_%?
,
-..
1
t
. , .
31 MAR 1989
..
Docket No. 50-354
Public' Service Electric and Gas Company
ATTN: . Mr.. S. E. Miltenberger
Vice President and Chief Nuclear Officer
P.O. Box 236'
Hancocks Bridge, NJ. 08038
Gentlemen:
Subject:
Inspection No. 50-354/89-02
This letter transmits the' findings of the routine, resident safety inspection
-
conducted by Mr. G. Meyer and Mr. D. Allsopp from January 24, 1989 to March 13,
1989, at the Hope' Creek Nuclear Generating Station. The findings were discussed
with Mr. J. Hagan of. your staff.
WeLhave concluded that the uncontrolled installation of electrical jumpers in
.the controls of the drywell ' equipment drain pumps represented a violation.of
NRC requirements. We have chosen to cite this violation despite the -fact that
your personnel-found.the problem, because it appears that corrective actions
for similar. problems' cited in NRC Inspection Report 50-354/87-23 were not
sufficient to prevent recurrence. The Notice of Violation is enclosed as
Appendix-A. You are -required to respond to this letter and in preparing your
.
,
'
response, you should follow the instructions in Appendix A.
'
This letter also acknowledges receipt .of your January 13, 1989 response to the
violation cited in the NRC Inspection Report 50-354/88-24.
Your corrective
i.
action will be excmined during a future inspection of your licensed activities.
We appreciate your cooperation.
Sincerely.
ORG!Nfi fEO "
[gyjAi!D C. W.i.73
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Inspection Report No. 50-354/89-02
0FFICIAL RECORD COPY
IR HC 89-02 - 0001.0.0
03/31/89
8904140344 890331
\\k
k,
Of
ADOCK 05000354
Q
/
_
_ - - _ -
- - _ - _ _ _
. _ _
_ _ _ _ _ _ _ _ -
- - _ - - _ - -
--
'
(
.
.
'
Public Service Electric and ~
. Gas' Company
2
_
31 W 1989'
cc w/ encl:
S. LaBruna, Vice President - Nuclear Operations
J. Hagan, General: Manager, Hope Creek Operations
B. A. Preston, General Manager,' Licensing and Regulation
.
R. Fryling, Jr. , Esquire-
.
S. Ungerer, ' Manager, Joint Generation-Projects Department, Atlantic
Electric-
Public Document' Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
.NRC Resident Inspector-
State of New' Jersey.
bec w/ enc 1:
' Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
Senior Resident Inspector, Salem
L. Rossbach, Senior Resident. Inspector, Indian Point 2
Robert J. Bores, DRSS
TI Coordinator, DRP
C. Shiraki, NRR Project Manager
R. J. Kiessel, NRR
B. Clayton, EDO
R. Nimitz, DRSS
a)
R
E
R
_ye3e,,,,,
S.et,ane
n,
e,
3/3(/89
3/y/89
3/ /89
'
0FFICIAL RECORD COPY
IR HC 89-02 - 0002.0.0
03/31/89