Forwards Safety Insp Rept 50-354/89-02 on 890124-0313 & Notice of Violation.Concludes That Uncontrolled Installation of Electrical Jumpers in Controls of Drywell Equipment Drain Pumps Represented Violation of NRC Requirements
ML20248J176
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/31/1989
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML20248J180 List:
References
NUDOCS 8904140344
Download: ML20248J176 (2)


See also: IR 05000354/1989002

Text

_

.- _ - _ _ - _ - - - __ _ _ _

-..

,

_%? *

1

t

.,.

.. 31 MAR 1989

Docket No. 50-354

Public' Service Electric and Gas Company

ATTN: . Mr.. S. E. Miltenberger

Vice President and Chief Nuclear Officer

P.O. Box 236'

Hancocks Bridge, NJ. 08038

Gentlemen:

Subject: Inspection No. 50-354/89-02

This letter transmits the' findings of the routine, resident safety inspection

-

conducted by Mr. G. Meyer and Mr. D. Allsopp from January 24, 1989 to March 13,

1989, at the Hope' Creek Nuclear Generating Station. The findings were discussed

with Mr. J. Hagan of. your staff.

WeLhave concluded that the uncontrolled installation of electrical jumpers in

.the controls of the drywell ' equipment drain pumps represented a violation.of

NRC requirements. We have chosen to cite this violation despite the -fact that

your personnel-found.the problem, because it appears that corrective actions

for similar. problems' cited in NRC Inspection Report 50-354/87-23 were not

sufficient to prevent recurrence. The Notice of Violation is enclosed as ,

Appendix-A. You are -required to respond to this letter and in preparing your

.

'

response, you should follow the instructions in Appendix A.

'

This letter also acknowledges receipt .of your January 13, 1989 response to the

violation cited in the NRC Inspection Report 50-354/88-24. Your corrective

i. action will be excmined during a future inspection of your licensed activities.

We appreciate your cooperation.

Sincerely.

ORG!Nfi fEO "

[gyjAi!D C. W.i.73

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Inspection Report No. 50-354/89-02

0FFICIAL RECORD COPY IR HC 89-02 - 0001.0.0

03/31/89

8904140344 890331 #

k,

\k

PDR

Q

ADOCK 05000354

PDC

/

Of

_ _ - - _ - - - _ - _ _ _

. _ _ _ _ _ _ _ _ _ _ - - - _ - - _ - -

--

'

. .

(

'

Public Service Electric and ~

. Gas' Company 2

31 W 1989'

_

cc w/ encl:

S. LaBruna, Vice President - Nuclear Operations

J. Hagan, General: Manager, Hope Creek Operations

B. A. Preston, General Manager,' Licensing and Regulation

.

R. Fryling, Jr. , Esquire-

.

S. Ungerer, ' Manager, Joint Generation-Projects Department, Atlantic

Electric-

Public Document' Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

.NRC Resident Inspector-

State of New' Jersey.

bec w/ enc 1:

' Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

Senior Resident Inspector, Salem

L. Rossbach, Senior Resident. Inspector, Indian Point 2

Robert J. Bores, DRSS

TI Coordinator, DRP

C. Shiraki, NRR Project Manager

R. J. Kiessel, NRR

B. Clayton, EDO