Forwards SER Authorizing Util 980728 Submitted Relief Requests Associated with Changes Made to Repair Plan for Core Spray Nozzle Weld N5B
ML20206C843
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/22/1999
From: Clifford J
NRC (Affiliation Not Assigned)
To: Keiser H
Public Service Enterprise Group
Shared Package
ML20206C846 List:
References
TAC-MA2431, NUDOCS 9905030218
Download: ML20206C843 (5)


Text

,

Su og

[ k UNITED STATES g g NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 20555 0001

.,,g* April 22,1999 Mr. Harold W. Keiser Chief Nuclear Officer & President Nuclear Business Unit Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

SAFETY EVALUATION OF RELIEF REQUESTS ASSOCIATED WITH CORE SPRAY NOZZLE WELD REPAIR, HOPE CREEK GENERATING STATION, (TAC NO. MA2431)

Dear Mr. Keiser:

By letter dated July 28,1998, Public Service Electric and Gas Company (PSE&G) submitted relief requests associated with changes made to the repair plan for core spray nozzle weld N58. The repair was performed during the seventh refueling outage at Hope Creek Generating Station.

The original repair plan, submitted by PSE&G in letters dated October 9,1997, and i

October 15,1997, proposed an attemative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, repair requirements under Title 10 of the Code of Federal Reculations (10 CFR), Section 50.55a(a)(3). The proposed allemative was approved by the Nuclear Regulatory Commission (NRC) in a safety evaluation dated October 17,1997, in a letter to L. Eliason, PSE&G, from J. Stolz, NRC (reference TAC No.

M99755). Subsequently, two changes to the repair plan were submitted by PSE&G in letters dated November 12,1997, and November 21,1997. However, these changes were submitted as commitment changes rather than relief requests. The PSE&G submittal dated July 28, 1998, re-characterized these changes as relief requests rather than commitment changes and provided additionalinformation. The changes made to the repair plan were: (1) the increase of the maximum interpass temperature during the holding period followingpost-weld heat I treatment from ambient temperature +50'F to ambient temperature +100*F and (2) the elimination of the need for the repair of the overlay to meet the criteria of ASME Section 111 by f using Code Cases N-504-1 and N-416-1 as attematives. .

fDl The NRC staff evaluated the information provided in your submittal, and has concluded that the proposed and implemented attematives to the Code requirements provided an acceptable level of quality and safety. Therefore, PSE&G's proposed relief requests associated with changes made to the repair plan for core spray nozzle weld NSB are authorized pursuant to 10 CFR 50.55a(a)(3)(i). The staff's safety evaluation is enclosed.

C C d (- []

9905030218 990422 PDR

?

P ADOCK 05000354 L pg

April 22,1999 H. Keiser If you have any questions regarding this matter, please contact the Hope Creek Project

' Manager, Richard B. Ennis, at (301) 415-1420.

Sincerely, l Original signed by:

James W. Clifford, Chief, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosure:

Safety Evaluation l cc w/ encl: See next page l

DISTRIBUTION -

Docket File - - - JClifford OGC RHermann PUBLIC .. REnnis ACRS .WKoo PDI-2 Reading MO'Brien GShear GMeyer, RGN-l fg JZwolinski/SBlack GHill(2) WBateman RNorsworthy (E-mail SE),'e OFFICE PDI-2/PM PQVg(kk EMCB/SQ q OGC N PDI-2/C NAME REnnis brfk WBahrhi 8db:'Ae9 JClif DATE- 9 / 9 /99 / b/99 d- / 9 /99 #/8 /99 [/Lkf99 OFFICIAL RECORD COPY. /

DOCUMENT NAME: SEA 2431 WPD

i.

April 22,1999 i I

- H. Keiser if you have any questions regarding this matter, please contact the Hope Creek Project Manager, Richard B. Ennis, at (301) 415-1420.

Sincerely, Original signed by:

James W. Clifford, Chief, Section 2 Project Directorate 1 l

Division of Licensing Project Management  !

Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosure:

Safety Evaluation cc w/ encl: See next page I

I l

4 I

DISTRIBUTION i Docket File JClifford OGC RHermann  !

, PUBLIC REnnis ACRS WKoo PDI-2 Reading MO'Brien GShear GMeyer, RGN-l

, JZwolinski/SBlack GHill(2) WBateman RNorsworthy (E-mail SE), -

OFFICE PDI 2/PM PDl4/L EMCB/SQ q OGC U PDI-2/C NAME REnnis h, b ridn WBahrh N-om ~! JCliff DATE 9 / 9 /99 7-/ '/99 [/ k /99 "/- /99 [/22499 OFFICIAL RECORD COPY DOCUMENT NAME: SEA 2431.WPD j I

H. Keiser If you have any questions regarding this matter, please contact the Hope Creek Project Manager, Richard B. Ennis, at (301) 415-1420.

Sincerely, wU4 J es W. Clifford, Chief, Section 2  !

Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-354

Enclosure:

Safety Evaluation cc w/ encl: See next page i

k l

Mr. Harold W. Keiser Hope Creek Generating Station Public Service Electric & Gas Company cc:

Jeffrie J. Keenan, Esquire Manager - Joint Generation Nuclear Business Unit - N21 Atlantic Energy P.O. Box 236 - 6801 Black Horse Pike

, Hancocks Bridge, NJ 08038 Egg Harbor Twp., NJ 08234-4130 Hope Creek Residunt inspector Richard Hartung U.S. Nuclear Regulatory Commission Electric Service Evaluation Drawer 0509 Board of Regulatory Commissioners Hancocks Bridge, NJ 08038 2 Gateway Center, Tenth Floor Newark, NJ 07102 Mr. Louis Storz Sr. Vice President - Nuclear Operations , Lower Alloways Creek Township Nuclear Department c/o Mary O. Henderson, Clerk i P.O. Box 236 Municipal Building, P.O. Box 157 l Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 General Manager - Hope Creek Operations Mr. Elbert Simpson  !

Hope Creek Generating Station Senior Vice President-P.O. Box 236 Nuclear Engineering Hancocks Bridge, NJ 08038 Nuclear Department P.O. Box 236 Director- Licensing Regulation & Fuels Hancocks Bridge, NJ 08038 l Nuciear Business Unit - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Regional Administrator, Region l l U.S. Nuclear Regulatory Commission .