MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept 1999-05-10
[Table view] |
Text
, ._
! o l .
\. l l
1 l
I l
l l
Northeast Utilities Millstone -Unit 3 l l
l Independent Corrective Action Verification Program (ICAVP) l I
l Walkdown Checklist !
CK-MP3-05-04 Rev.1 l
Modification Walkdown Checklist
/)
Prepared by: A A SE/2/ ,
6/9/97 Name ture ' Date Approved by: 1 X.be.kea b I
D.2- bA -
4*3-9[
Name Signature / I Date
)
l IMPLEMENTATION System Walkdown Team l
l
- Concurrence by:
PDR ADOCK 05000423 P PM ,
- Northeast Utilities CK-MP3-0504 i Millstone Unit 3 Spass Sheet of Modification Walkdown Checklist 2
Instructions This checkhst supplements project instruction PI-MP3-05 and shall be used for perfornung the maMication !
walkdowns described in the project instruction. Application and use of this checklim shall be as follows
- 1. The checkhas consists four parts; 1) Applicability Screening / Planning Form 2) Attribute Forms,3) i Comment Form and 4) Equipment Nameplate Data Form.
l 2. The Applicability Screening /PlanninF form shall be used by the Walkdown Team to identify which attribute categories are applicable to the moddication being avviewed and to ?- = =q that pre-walkdown activities have been completed.
3.
The Walkdown Team shall check each attnhte on the Attribute Forms for attribute %.e determined to be applicable. Each attribute shall be dispositioned as SAT (satisfactary), UNSAT j ,
(umatisfactory) or N/A (not applicable). When all attnbutes for a specific category have been i
! addressed, the Walkdown Team shall sign and date the Attribute Fonn. Note: The attribute form is divided into subcategories. Each subcategory requires a Prepared By and Checked By signature.
, 4. The C=== ant Form shall be used by the Walkdown Team to explain all "UNSAT" responses on the i Attnhte Form. Comments shall be numbered on the Comment Form and Attribute Form with the enhentagory suffix followed by sequential numbers (i.e., for subcategory " Equipment", comment I numbers shall be A1, A2, A3, etc.).
u: %:
i 5. The Equipment Nameplate Data Form shall be used by the Walkdown Team to record nameplate data 1
during the walkdown. All entries into this form require independent verification; the form shall be j signed by a Preparer and a Checker.
. 6. When the moddication walkdown and all checklists have been completed, the Walkdown Team shall 1
assemble a complete checklist, enter the system name and number the checklist pages in the checklist i title block, and sign and date the checklist coversheet, t
i Note: Pages shall normally be numbered sequentially, if subsequent changes are made, insert pages
- numbered as I A, 2A, 2B, etc. cara be added.
- 7. The CRG Lead shall indicate his concurrence the checklist has been properly applied by signing an
! dating the coversheet
!t i
4 (CK.MP34544. Rev.1. Page 2)
C:TK3 0503. DOC c
s ,
Northeast Utilities CK.MP34544 Millstone Unit 3 System Sheet of Modification Walkdown Checklist Applicability Scmalas/Walkdown Phanlag Fone Yn & Consmeests
! A. Modificatum package has been reviewed against redlined !
l system walkdown drawings; Modification package matches I with redhne drawings.
B. Key critical dunensions have been identified and noted in Section M of the Attribute Form included in the cWmt C. 'Ibe following attribute categories are applicable to the l
modifications.
! i
- 1. Equipment !
! 2. Valves !
- 3. Pumps, Fans, Compressors
- 4. Mounting and Supports
- 5. Irwumuent l
- 6. Electrical Equipment
- 7. Heat Tracing, Insulation, Pamting l 8. HVAC
- 9. Piping
- 10. Fire Barriers
- 11. Lubrication 1
- 12. SeismicII/I I
- 13. Critical Dimensions 1
s
! l l
I (CK-MP3-4!M4. Rev.1.Page 3)
C:CK34303. DOC i
e I_ -- ,
~
l
! ' No'r theast Utilities CK-MP3-0544 l Millstone Unit 3 System Sheet of j Modification Walkdows Checklist Attribute Form t Attribute SAT UNSAT N/A Comment l A. Equipment:
l 1. Iabeling and component identification installed and correct.
- 2. Equipment covers and safety guards installed.
- 3. As appropnate, equipment operation access platforms areinstalled.
- 4. Manufacturer's equipment tags and name plates installed andlegible.
l 5. Properbolting hardwareinstalled.
- 6. General componentinstallation per design drawings.
- 7. Compenents have been installedin a manner that provides accessibr opernic.' and maintenance, and does not preserst a personnel safety hazard.
- 8. Exirdng components, systems, or structures 'iada==%
- 9. Construction debris removed and proper cleaalims tewi established.
- 10. Equipment nameplate data agrees with vendor drawings or equipment lists. ,
Prepared by Date Checked by Date Attribute SAT UNSAT N/A Comment B. Valves:
- 1. Valve glands andpackinginstalled.
- 2. Pressure relief / safety ulve/ rupture disks settings per design (as indicated on attached valve tags).
- 3. Pressure relief / safety whe/ rupture disks discharge piping properly i secured and discharge flow is directed
- in a safe manner.
- 4. Valve orientation correct (including check vahes and non-return ulves).
- 5. Valve hand wheelsinstallca.
i 6. Manualulves have sufficient
! clearance to be operated. ., .
(CK-MP3-oS44. Rev.1. Page 4)
C:CK3 0$03. DOC
l Northeast Utilities CK-MP3-0544 l Millstone Unit 3 System Sheet of Modificatloa Walkdown Checklist
. )
1 Attribute SAT UNSAT N/A Comment
- 7. Locking devia:provided for those valves / breakers / switches required to be locked in a certain position.
, 8. Valves have manufacturer'slabels and/or tagsinstalled.
- 9. Solenoid valves installed with correct I Porting.
- 10. Solenoid valw.s have proper voltage rating.
l l
Prepared by Date e
Checked by Date 4
Attribute SAT UNSAT N/A Comment 1
C. Pumps, Fans, Compressors.
- 1. Pumps, fans, compressors aligned and 4
coupled, and coupling guards installed.
- 2. Pumps and fans oriented correctly.
- 3. Pump seals and packinginstalled.
- 4. Pump scal / bearing cooling lines
- l installed. !
- 5. Pump sealleakofflines or baseplate drain linesinstalled.
1 Prepared by Date Checked by Date Attribute SAT UNSAT N/A Comment D. Mountings and Supports:
- 1. Equipment mounting bolts installed.
- 2. As required, equipment base plate
. grouted.
- 3. Installed pipe hangers conduit supports, cable tray supports, and instrument line supports agree with hanger detail drawings.
- 4. Snubbers installed per design
- requirements and setpoints verified.
j (CK-MP3-oS44. Rw.1. Page 5)
C:CK34503. DOC
Northeast Utilities CK-MP3-05-64 Mm=*a=* Unit 3 System Sheet of Modification Walkdown Checklist Attribute SAT UNSAT N/A Comment
- 5. Hanger spring cans lastalled and a4usted per design requirements. '
- 6. A4ustable struts installed and a4usted per design requirements
- 7. hiamic anchors and restraints
! installed per design requirements.
, 8. Temporary supports renmed.
- 9. Supportlocations agree with design drawings Prepared by Date Checked by Date Attribute SAT UNSAT N/A Comment E. Ir.humerd:
- 1. Instrument sensing lines connected per "-
design mquirements.
- 2. Equipment mountedinstrumentation installed per design requirements. I
- 3. Physical protection for instrumentation installed per design requirements.
- 4. . Instrument tubing and fittings installed per design requirements.
- 5. Surge suppressers for instrumentation installed per design requtrements.
Prepared by l Date i
1 i
Checked by Date Attribute SAT UNSAT N/A Comment F. Electrical Equipment:
- 1. Cable "to" and "from" agrees with physical drawings and cable schedule.
, 2. Conduit sizes agree with physical l drawings.
l 3. Cable size agrees with cable schedule.
- 4. Conductor identification tags installed. -
t l
l (CK MP3 0!L44 Rev.1.Page 6)
CfCK34503. DOC
4 Northeast Utilities Millstone Unit 3 CK-MPm l System Sheet. of Modification Walkdown Check!!st i
Attribute SAT UNSAT N/A i
C==*
- 5. Train separation per design requirements.
- 6. Wiring agrees with wiring diagram.
- 7. Raceway fill configuration is consistent with assumptions in ampacity tables. l (Assumptions will be identified by SRG.)
- 8. Tuoaoily liAed or abandoned leads / cables (spares) have been marked and documented.
l
- 9. Mechanicalprotective devias for electrical conductors installed per design requirements.
- 10. Ventilation installed /not blocked, (vents, fans, etc.)
Prepared by Date Clwked by Dr.te Attribute SAT UNSAT N/A Ca=-t G. Heat Tracing, Insulation, Painting:
- 1. Heat tracinginstalled per design requirements.
- 2. Painting and other protective surface coatings satisfactoryinstalled.
- 3. Insulation installed per design requirements.
Prepared by Date Checked by Date Attribute SAT UNSAT N/A Comment H. HVAC Equipment
- 1. Ventilation system filters and absorber units installed and properly oriented.
- 2. Fire dampers properly oriented and installed.
- 3. Fusible links installed and are of the proper temperature range.
( 4. Ductwork access doors installed.
l (CK MP3 05 04, Rev.1.Page 7)
C:EK3 0$03. DOC
. _ _ .. . _ . . _ _ . . _ - . . . . . . _ . _ .. . . . _ . _ ~ _ . . > _ . _ . . , __ . _ - _
Northeast Utilities CK-MP34544 i Millstame Unit 3 System Sheet of i Modificatios Walkdown Checklist I l
l Attnbute l SAT UNSAT N/A C-~ i
- 5. Equipment condensation drains installed. 4 l' 6. Ductwork routtag ?= d==!1y a pees with l
duct routing drawings.
Prepared by Dat:
CheckedFf Date Attribute SAT UNSAT N/A Comment I. Piping:
- 1. Restricting orifices and flow elements installed.
- 2. Flow elements oriented correctly
- 3. Fluid system permanent filters installed.
- 4. Functional configuration of piping and !
otherinline components agrees with Pii P ng drawings.
- 5. Piping line size agrees with piping drawings.
- 6. Hanger located in m;wid-r.cc with drawings.
Prepared by Date Checked by Date Attribute SAT UNSAT N/A Comment
^
J. Fire Barriers
- 1. Fire barriers, cable tray barriers and l
covers, and other fire protection features / equipment installed per Design requirements.
- 2. Penetration seals betmen rooms / fire areas installed.
- 3. Fire doorinstalled, identified and functional.
- 4. Fire stops in conduit are installed per
- design.
I i'
(CK.MP3-05 ad, Rev.1. Page 8)
CxK34503. DOC
.. . ~ _ . .. __. - . . . - _ . . . - - --- .. - . .
Noetheast Utilities CK-MP3-05-04 I Millstone Unit 3 System Sheet of
! Modification Walkdown Checklist l
l t
l I
l l
l l Prepared by Date l
l Checked by Date i
Attribute SAT UNSAT N/A Comment l K. Lubrication:
- 1. Lubrication reservoirs installed and at l i proper operating level.
- 2. Dike (Containment)provided.
l l Prepared by Date Checked by Date l
l I
l (CK.MP3-oS44, Rew 1. Page 9)
CIK3-0503. DOC
i Northeast Utilities CK-MP345 04 Millstone Unit 3 gm y
l- Sheet of l Modification Walkdown Checklist Comment Form Comment No. Comment I
i I
I 1
I l
t I
t i
(CK-MP3-oSod, Rev.1. Page 10)
C:CK3-0503. DOC
s Northeast Utilities CK-MP3-05-04 Millstone Unit 3 System Sheet of Modification Walkdown Checklist Equipment Nameplate Data Form Equipment No. Nanwplate Data i
A 4
1 3
4 Prepared by Date Checked by Date j
I I
(CK-MP34544 Rev.1.Page 11)
C:CK34503. DOC l I