Interim Deficiency Rept,Item M-72 Re Lack of QA Program for Fire Protection Sys Installation.Initially Reported on 821214.Proposed Fire Protection QA Program Developed. Followup Rept Will Be Submitted by 840220
ML20081M334
Person / Time
Site: Zimmer
Issue date: 11/10/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 72, LOZ-83-0201, LOZ-83-201, NUDOCS 8311170215
Download: ML20081M334 (2)


Text

- .

1h ' g .

Kg

. THE CINCINNATI GAS & ELECTRIC COMPANY CINCINNATI. OHIO 45201 November 10, 1983 LOZ-83-0201 J. WILLIAMS, JR SENIOR VICE PRESIDENT NUCLEAR OPERAT60NS

' Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 i Attention: Mr. J.G.'Keppler Regional Administrator Gentlemen: {

REs WM..H. ZIMMER NUCLEAR POWER STATION - ~ UNIT 1 10CFR50.55(e), ITEM M-72, LACK OF A ' QA PROGRAM l

FOR FIRE PROTECTION SYSTEM INSTALLATION W.O.'57300,' JOB E-5590, FILE'NO. 956C,'M-72 This letter constitutes an interim report concerning the subject condition.' initially reported to the Commission on December 14, 1982. CG&E has determined that this condition is a reportable deficiency under 50.55 (e) .

The condition identifies the lack of a quality assurance program for the design and construction of fire protection systems and components. In 1977, CG&E committed to provide a quality assurance program in .the Fire Protection Evaluation Report. This report was in response to Appendix A, Section C of

-the NRC Branch-Technical Position APCSB 9.5-1, but the quality l - assurance aspects of the program were not incorporated into the ZPS-1 quality assurance program. An evaluation of this condition j

has been completed and is as follows:

L This deficiency will require extensive evaluation to ensure l- that the installed fire protection systems and components meet the criteria and- bases of the safety analysis report as committed to in the Fire Protection Evaluation Report; and is therefore

! . considered to be significant and reportable.

To resolve this condition, a proposed fire protection quality assurance program based on the Branch Technical Position APCSB 9.5-1 and the NRC's Supplementary Guidance for Fire Protection I Quality Assurance, dated June 14, 1977, has been developed by L CGEE. This quality assurance program is part of the Project Quality Assurance Manual'(Appendix). This program will apply to all future fire protection work and will b used to develop the 8311170215 031110 PDR ADOCK 05000358 4gb S PDR

%g p:7} j po _

i.

14r. J.G. Keppler .

Regional Administrator November 10, 1983 LOZ-83-0201 Page 2 acceptance criteria to verify the quality of existing fire protection systems design and installation. A follow-up report detailing our actions in this matter will be submitted by February 20, 1984.

We trust the above will be found acceptable as an interim report under 10CFR50.55(e) .

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

. S? '

SENIOR VICE P IDENT BLT/sfr cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Resident Site Supervisor ATTN: W.M. Hill NRC Zimmer Project Inspector, Region III ATTN: E. R. Schweibinz

-