ML20087N845

From kanterella
Revision as of 06:22, 13 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept Re Pipe Support Design Calculations. Initially Reported on 831121.Bechtel Analysis Indicated Support Sys Design Adequate & Meets Design Margins.Item Determined Not Reportable Per 10CFR50.55(e) or Part 21
ML20087N845
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/26/1984
From: Foster D
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-332, NUDOCS 8404050079
Download: ML20087N845 (4)


Text