ML20042A063

From kanterella
Revision as of 07:26, 13 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Extension Until 820420 to File Comments on Des. Delay Necessitated by ASLB 820406 Deadline for Filing Contentions for OL Hearings
ML20042A063
Person / Time
Site: Midland
Issue date: 03/17/1982
From: Sinclair M
AFFILIATION NOT ASSIGNED
To: Tedesco R
Office of Nuclear Reactor Regulation
References
NUDOCS 8203230042
Download: ML20042A063 (1)


Text

.

e A

  1. S

@j,$@q 0

RECSVED g

MAR 2 21982w L E- w.m mD mm

, 5711 Summerset Dr.

'6 /f Afidland, ifI 48G40 w g ng\ Starch 17, 1982 Itobert Tedesco Licensing Division U.S. Nuclear llegulatory Commission Washington, D.C. 20555

Dear Robert Tedesco:

As a citizen participant in the operating license hearings of the Tildland nuclear plants, I have received a Draft Environmental Impact Statement. (DEIS)

Comments are due on April 5 ,

Ilowever, at the Tfarch 11 telephone conference call of all parties, '"

Licensing Board Chairman, Charles Bechhoefer, asked me to have any contentions that should be added to the operating hearings ready to discuss on April G when the Licensing Board convenes for further hearings on the soll settlement issues at Tiidland. I find that meeting both of these important obligations within the same time frame very difficult.

In terms of scheduling, it is probably more important to get all the new contentions for the operating license filed by April G. Since I must proceed without outside assistance, I would like to request to be allowed an extension of time for filing a response by April 20 instead of April 5.for the DEiS.

Atany thanks to your attention to this request.

Yours sincerely, p 't DN Atary Sinc air TIS /jt cc- Charles Pechhoefer 8203230042 820317 DR ADOCK 05000329 PDR

$lID

_ _ __. _ _ .