ML20071P895

From kanterella
Jump to navigation Jump to search
Requests Info Re Total Number of Wells & Amount of Electricity Required to Operate Wells for Dewatering
ML20071P895
Person / Time
Site: Midland
Issue date: 06/01/1983
From: Marshall W
MAPLETON INTERVENORS
To:
NRC COMMISSION (OCM)
References
NUDOCS 8306080206
Download: ML20071P895 (1)


Text

-

Wendell H. Marshall MAPLETON INTERVENERS D0pKE_T,EC Route 10 f

Midland, Michigan 48640

~83 JUN -6 P1 :41

' June 1, 1983 1

s T.. Ta -

., y 5E?'!\\Ci t wiCH Nuclear Regulatory Commission Washington, DC 20555 y

Reference:

Midland Plants Units 1 & 2 i

Dockets #50-329.& #_50-330 Dea'r Sirs:

?'

s

\\

ys S '3 The Mapleton'Interv5ners sometime ago, requested that our Technical 4

' Director,. Steve J.

Gadler of St. Paul, obtain information concerning

<t the dewatering systems at the Midland Plant.

In this respect, in-

} ' '~

formation.was?specifically requested concerning the total number of wells and the amount of electricity that will be required to be

gutilized in the o'peration of those wells for the dewatering purposes.

J This letter,-dated the lith of March, 1983, has not been answered, b and it seems that the NuclearyRegulatory Commission are dragging their feet in this r,6spect.

s s

y.

r

'Yrom. Revision 114:Vol'me 1, Consumers Power Company to NRC's request u

4'regarding_ plant: fill, we find a total of 96 wells that have been drilled, but the sizes in some instances are indeterminate.

The Mapleton Interveners would appreciate this information so that

,.it can continue with its analysis of the capability of the wells to

' dewater the plant area.

Sincerel j.,

n N l. Mars al.

(;

President, Mapleton Interveners WHM/lk

+ -

s

/

\\

k C306080206 830601 PDR ADOCK 05000329 -

A <p 9

PDR

_ LL,)

- - -