7)gl1ml d r10 GOVERNMENT ACCOUNTABILilY PROJECT inst [tute for Policy Studies 1901 Que Street. N.W., Washington. D.C. 20009 (202)23d 9382 l
~!.
April 15, 1983 Mr. Michael W11 cove, Esquire Office of Executive Legal Director Nuclear Regulatory Commission Washington, D.C.
10555 Re:
Consumers Power Company Midland Plant, Unita 1 and 2 l
Docket # $0-329/330-ON.
50-329/330-OL
Dear Mr. Wilcove:
i This is to confirm the questions that I read to you over the telephone this morning regarding Ms. Stamiris' document requests on the Construction Completion Program ("CCP") and ongoing inspection and enforcene.nt action.
l First, Ms. Stamiria requests the following:
4 i
1)
Documents related to ongoing inspections which involve any issue of willful or deliberate violation of any NRC regulation, any law, or any Atomic Safety and Licensing Board ("ASLB") order 4
2)
Documents related to ongoing investigations which involve any issue of willful or deliberate wrongdoing or willful or deliberate vio?atinn of any NP.C regulation, any 1sw, or any A'LB order.
]
3)
Documents related to the CCP:
j (a) For the period Septembe'r 17, 1982 to *he present NRC l
3 reeting notes and correspondence between Consumers Power Company ("CPC")
i and the NRC relating to implementation of the CCP and other than that which appears on the public record, I
(b) All documents relating to the retraining of QA sad QC personnel; and (c) All documents related to CPC's ability, character, or l
competence to oversee and manage the CCP.
As I mentioned to you yesterday, I believe these, requests are included within the scope of Ms. stamiris' document request Nos. 1 and.S.
gineerely yours, 8406040394 840517
(^
l-E 6
PDR LYNNg BERNAREI.
staff Counsel m
j, w
. g y ;. e g
-~
= -. - - -
. ~ ~.
(
,g
~
g ()
ff.koY$tk
/ERNMENT ACCOUNTABILITY PROJECT in5titute for PohCy $tudse$
1901 Que $treet. N.W., Washington, D.C. 20009 (202)234 9382 4
j j
i March 25, 1983 j
}
~.
l Mr. Darl Hood II$h[d'c.
U.S. Nuclear Regulatory Commisalon Washington, D.C.
20555 l
l
Dear Mr. Hood:
t i
l I am in receipt of your March 21, 1983 letter
SUBJECT:
l l
TERA CORPORATION'S PROJECT QUALITY ASSURANCE AND ENGINEERING 1
PROGRAM PLANS FOR THE MIDLAND INDEPENDENT DESIGN AND CONSTRUCTION L
e VERIFICATION PROGRAM.
The attached March 18,' 1983 TERA letter I
includez a request for a public meeting between TERA and j
the NRC staff.
I also understand, through Mr. Darrell Eisenhut's March 23, 1983 l
letter that TERA has been requested to expan'd the two initially j
required systems to include an independent design verification (IDF) *.c 1 l
of that part of the Heating, Ventilating, and Air Conditioning,,,. g ;u,p (HVAC) equipment that directly affects the control room.
This.,6 j
decision is extremely significant,:and I an anxious to review ? $.(.;.. ! f 0
- y a 4
any detailed methodology plans by either the TERA Corporatiem I' W W.{o or the NRC which will determine the adequacy of the EVAC system.' ::Q,.
Finally, I note that the TERA letter of March 18, 1983 indicates t
that "....the Midland IDVC program has progressed to the point where I
confirmed items have been identified."
It appears that the confirmed items have not been reported to the NRC at this time, astd j'
that TERA is asking for guidance about when to report these l
confirmed items.
He are deeply distressed that th4 confirmed items have not been identified as of yet to the NRC.
It was our i
i understanding that all communication would be given simultaneously to the NRC and Consumers Power Company, yet obviously that has not occurred.
In our March 7, 1983 letter to Mr. Darrell Eisenhut I
i we pointed out' that there had been an admission that TERA had provided Consumers with a report that the NRC had not yet received, i
(Public Meeting, Midland, Michigan, February 8, 1983).
Now
{
TERA has " confirmed items" which it has not reported to 'the NRC.
Please clarify for TERA, as well as for us, the details of the 4
requirement-that information be provided to the NRC and to Consumers i
at the same time.
l l
q Your response will be appreciated in the near future.
l Sincerely, i
~
N11 E w
C.s s-1 a>"2 BILLIE PIRNER GARDE I,
ha oi DN C '
Citizens Clinic Director i
W a -.-
._,__,.c--
-m.
m..
?
4,-
m r-g u.. w
\\
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION i
nsosom m g
7ss RoossVsLT Noaa SLsN skLYN,ILLINols est37 eseee APR 0 51983 I
t f
Government Accountability Project Institute for Policy Studies j
ATIN:
Ms. Billie P. Garde i
Director j
Citizens Clinic for Accountable Government j
01 Que Street, N. W.
Washington, D. C.
20009 Dear Ms. Garde Your letter of March 7,1983, commenting on issues presented at the
]
February 8, 1983, public meeting and regarding Consumers Power Company's (CPCo) Construction Completion Program (CCF) for Midland Units 1 and 2 i
described in a January 10, 1983 letter from CF %, is being answered in part by Mr. Eisenhut. He has requested Regio III to respond to those portions of your letter addressing matters wh.s{ch are the responsibility of Region III.
I You expressed concern that the responsibility for the on-site inspectors and the Midland Section has been transferred to the Regional Administration I
and Washington-based NRC officials. Let me assure you that the respons-Ability for the Midlaad resident inspectors and the Midland Section in-1 spectors has not changed. They still report to me through first and second j
line supervision. Likewise, the Regional NRC inspection responsibility for the Midland plant has not changed since it was assigned to the Office of j
Special Cases in July 1982.
j In your ccaments you expressed concern that there have been a number of incidents within the last several months where Regional personnel have i
indicated one answer pertaining to construction work, and then other action l
was taken after approval from NRR. We disagree with your characterisation of the facts. Our position on each 'of your three enamples is as follows:
i 1.
While it is true that Ross Landsman was not included in the conference l
call of February 4,1983 regarding pier load test sequencing, his input
{
was subsequently provided to both CPCo and NRR. At that time he agreed i
with the conclusions and decisions reached during the previous j
February 8 phone call.
I l
2.
Region III (RIII) personnel gave approval for doing the Feedwater Isolation Valve Pit (FIVP) jacking and they were aware of the-l licensee's schedule when they gave their approval..The RI!! personnel l
who were at the ASLB hearing (the same ones who gave the approval)
{
i do not resseber asking the statement you attributed to theng hiswever, i
i l
l I
\\
~ ' ' F ' 1 1+ 7 %
nu
..i
- - ~.
i
,t
]
4 APR05tch Ms. Billie P. Garde 2
=
M they have stated that any references made by them concerning FIVP work j
activities commencing in March or April pertained to the actual drift-
-l ing under the FIVP to pier 9 and not to the FIVP jacking work. The drifting actually commenced on February 28, 1983.
i 3.
The NRC staff believes that "no major discrepancies" have been found in the actual underpinning work. In reference to the cracks identified daring FIVP jacking operations, the licensee submitted a report to I
the NRC which concludes that the cracks were not indicative of any-structural damage having occurred to the FIVP. The NRC is currently reviewing this report and no discrepancies have been identified thus l
far. In reference to the February 15, 1983 memorandum from Ross I.andsman to R. F. Warnick, the three issues identified in the 1
meno were not considered to be major discrepancies. The three issues i
have been satisfactorily addressed by the licensee.
i With respect to another of your concerns, RIII personnel who were involved l
in the initial contacts with the Stone and Webster (S&W) organization do not i
believe that anything they said or did prior to February 24, 1983, the date
)
S&W was approved, could have given the impression that S&W's onsite activities had been approved by the NRC.
You also expressed concern about the "as-built" condition of the plant and l
who will identify the, problems at the plant. In this regard, RIII expects j
the licensee's drawings and documents to reflect the plant as-built condition.
{
The special inspection of the diesel generator building performed by the Midland Section identified differences between drawings and actual construc-tion. -We expect the licensee to identify existing differences and other problems at the plant. In the CCP the licensee has committed to do this.
The NRC is requiring CPCo to expand the CCP overview to include the 11-l consee's identification of problems. After the licensee has completed their problem identification process, the Office of Special Cases plans to conduct additional Jaspections to determine whether the licensee's inspection effort j
has been acceptable. The NRC has also required that a third party conduct an i
independent construction verification program after the CCP has identified l
the problems. This should provide a second means of determining the accept-
{
ability of the licensee's inspection effort.
Regarding matters which you identified as generic problems, such as QA/QC j
documentation, training and recertification of HVAC welders, unidentifiable electrical cables,' untrained QC inspectors, and asterial traceability in-accuracies, the RIII inspectors have or will address each one. Our practice, t
I i
s l
i' I
I
~
i;
.A l
~
j 5
' APP.05FAU Ms. Billie P. Garde 3
i t
r when the NRC identifies a generic problem, is to require the licensee to determine whether or not that generic problem exists in other areas of their plant and if it does, what actions they have taken or will take to address the generic concerns. Our inspectors review the licensee's response and assess the acceptability of it.
The following specific actions have or will be taken to address each of the above listed concerns.
1.
The RIII staff is currently reviewing the HVAC welder qualification issue. We will begin our review of other HVAC (Zack) issues in the near future.
I 2.
The NRC required the licensee to reinspect electrical cables to j
make sure the correct cables are installed. As of March 24, 1983, seven cables were found by the licensee to be other than that specified by design requirements out of 8,148 cables inspecteo.
3.
QC inspector training has been reviewed and the licensee has been required to improve QC inspector training.
4.
We have required the licensee to address the material traceability problems identified to date.
We are not aware that what is and what is not "Q" soils remedial work is a subject of controversy. As of March 10, 1982, all remedial soils work was determined by all parties to be "Q".
This determination was further clari-fled by the May 7,1982 ASLB order which adopted use of drawing C-45.
This drawing clearly identifies "Q" remedial soils boundaries.
l The following information is presented in response to your questions regarding j
the approval and work of Stone and Webster in their soils overview.
j 1.
We judged the adequacy of the initial S&W work by whether or not our j
inspectors found problems with the licensee's work that we would have j
expected the overviewer to find. We also based our judgement on the adequacy of their reports.
2.
We have not reviewed S&W methodologies and do not plan to unless we find significant problems which they have missed.
3.
We have not reviewed the revised contract regarding the assessment of underpinning work on safety-related structuras.
Regarding the procedure to be used to approve the independent third party to overview the CCP, the Region will follow basically the same procedure as we used in approving Stone and Webster for the soils overview. A I
I l
i h
I s
Ms. Billie P. Garde 4
APR 0 5 re3 meeting was held in Midland on February 8, 1963 to discuss the CCP and to hear comments from members of the public. Selection of the overviewer i
will be proposed by the licensee and that selection will be submitted to the NRC for approval. We do not plan to hold a public meeting to hear comments on the independent third party proposed by the licensee to perform the CCP overview; however, we will consider all written comments i
received before our decision.
If you have any questions regarding this response, please contact i
Mr. Robert Warnick (312/932-2575).
S.'ncerely, original stoned by A. Bert Davis James G. Keppler Regional Administrator cc: DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII The Honorable Charles Bechhoefer, ASLB The Honorable Jerry Harbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB William Paton, ELD Michael Miller Ronald Callen, Michigan i
Public Service Commission Myron M. Cherry Barbara Stamiris l
Mary Sinclair i
Wendell Marshall Colonel Steve J. Gadler (P.E.)
I h
l 1
Cmwak 1
RIII RII RIII t/ **Me l RIkI RI RITI 8
j'NRRIE/gK,*M*
(Fif b
4
\\
Gardner/jp sean r Warnick i
De s Ka pler 3/31/83 he$ y/4/#7
[/
y p/
y A
ee
~-.--
I i
p GOVERNMENT ACCOUNTABILITY PROJECT Institute for Policy Studies
}
1901 Que Street. N.W., Washington, D.C. 20009 (202)234 9382
^
i, l
March 7, 1983 1
6 i
Mr. Darrell Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Ceaunission j
washington, D. C.
j Dear Mr. Eisenhut I
l on February 8,1983, the Goverrunent Accountability Project (GAP) attended two public meetings in Midland, Michigan on behalf of the LONE TREE COUNCIL,
}
concerned citizens, and several former and current employees working on the i
Midland Nuclear Power Plant, Units 1 and 2.
As you know, the large public turn-out for both the daytime meeting between Constaners Power and various Regional j
and Washington-based offices of the Nuclear Regulatory Comunission (NRC) and the evening session between the NRC and the general public included spirited debate i
and lengthy presentations. These meetings, although highly beneficial to the I
education of the Michigan public about the nuclear facility being constructed in
}
Midland, did not allow for the type of technical questions and detail about the Construction Completion Plan (CCP) in which GAP is particularly interested.
i l
Therefore, I appreciate this opportunity to address a number of concerns j
that we have regarding issues presented at the public meeting and contained in the detailed CCP submissions. In order to complete our own continuing analysis i
of the Midland project, I would hope that you can provide answers to and/or comunents on the enclosed questions.
{
Pending further public meetings and detailed review of basic elements of j
the Construction Completion Plan, I asstane that your verbal requests to Consumers Power (Consumers) management to " hold off" on making any comunitments will be translated into a firm NRC directive. As you know, Consumers has had a history
{
of misinterpretations and miscomununications in relation to many of the aspects surrounding the Midland plant. The public understood quite clearly what your j
instructions were: if those have changed I suggest that you continue to express those changes to the public through the appropriate local media representatives.
I t.
I.
REQUESTS FOR FURFMER INr03 STATION l
A.
The relationship between the Washinston NIC offices (NRR, DCL, etc.)
and the Regional management.and on-site Midland Special Team and Inspector.
I It is unclear where the authority lines for approval of various elements of the Midland construction project are drawn. GAP investigators, staff i
and attorneys are continually getting unclear signals from the various
[
regulation divisions as to who is making what decisions and when. Since it has been noted by the NRC staff itself that "[ Consumers] seems to possess the unique ability to search all factions of the unc until they 1
[
.l M 2
y -,
-..n.
3 Mr. Darrell Eisenhut 2-March 7, 1983 i
have found one that is sympathetic to their point of view - irregardless of the impact on plant integrity,"F it seems critical to establish once i
and for all the authority lines within the NRC that Consumers must re,.
spend to.
We are particularly concerned about the apparent transferring of responsibi-I lity for the on-site inspectors and the Midland special Section Team to the Regional Administration and Washington-based NRC officials. Although I am sure that you have i
read the testimony of Mr. Keppler, submitted to the Atomic Safety and Licensing Board (ASLB) on October 29, 1983, and attached memorandum from the staff members that are; more directly responsible for the Midland project, I have included them with this letter for your renewed attention following the results of the Diesel j
Generator Building inspection.
(Attachment #1.)
There have been a number of incidents within the last several months where j
8 Regional personnel (RIII team or on-site) have indicated one answer pertaining to i
construction work, and then other action was taken after approval from NRR.
Several examples of this that are fairly recent are:
I l.
A February 8,1983 conference call between Consumers, Bechtel and the NRC regarding the discussion of loading sequence for pier load test i
{
and background settlement readings did not include ang, Region III per-
{
j sonnel, most particularly Ross Landsman.- Although I do not know the details of his exclusion, I am concerned that he was not a participant in the call, or in the decisionmaking process.
4 4
2.
At the recent ASLB hearings NRR and RIII personnel were asked about j
the projected timeline for Consumers to approach the Feedwater Isolation Valve Pit jacking work. RIII personnel seemed confident that work would j
I not begin on this until at least late March or early April, yet work ac-tually was begun on the same day as the conversation, February 17, 1983.
3.
The NRC has taken a position that "no major discrepancies" have been I
found in the soils remedial work to date. Yet:
(a) two cracks, in-t cluding one 10 millimeters by 7 inches long, have been discovered in the valve pit.2/ (b) A February 15, 1983 memorandum from R. B. Landonan to i
l R. F. Warnick identifies three specific concerns since the beginning of I
the underpinning work that -- to GAP -- indicate serious flaws in the
~
perception of Consumers about the seriousness of the work they are en-i gaged in. These include craftworkers not receiving the required amount of training, arguments with Consumers about techniques that bhow a pri-ority to deadlines instead of quality, and a major flaw in the stone &
Webster independent assessment.
(Attachment #2.)
Given our experiences with the NRC inspection offorts, I am particularly anaious to have the on-site /special section team members have as much direct input i
into the review /licenbing process as possible. Although I do not aiways agree with their decisions or their actions, I am more comfortable with their version of the facts on the Midland site.
M emorandum from R. J. Cook to R. F. Warnick, July 23, 1982.
M M ccording to the Midland Daily News, February 24, 1903, Construction Technology A
had performed an " independent" analysis of the cracks before the Midland team even had the opportunity to oemplete its own investigation or review.
n f
w
-c
,..,4
,-e m-p
,--_v
,,,1 n,_.ew-..
e - - -, _ _. -,
..-,--y--
--,.-,m
.m
_ ~_.._ _.
s
]
4'
=
i e
l Mr. Darrell Eisenhut March 7, 1983 j
i
{
B.
The guidelines and timetable by which the independent third-l party auditor will be chosen.
j It is not at all clear what guidelines, if any, your office intends to employ in the review or monitoring of the selection process for the third.
5 i
i party auditor of the Midland facility. We are extremely distressed at the t
way that both Stone & Webster (S&W) and the TERA Corporation were approved by your office. We feel that the approval was more by default than by 4
aggressive review of the proposals, contracts and criteria as presented j
to the NRR office. Further, it is very clear to us that the Regional per-i sonnel involved in the initial contact with the Stone & Webster organization j
gave the ispression that S&W's on-site activities were authorised. Even if that impression was only technically incorrect, it is a serious breach of Public trust by the Regional staff.
1 i
We recommend that your office adopt the prudent position that Consumers
{'
follow the nominating process used for Diablo Canyon's independent assessment.
Al-i though Midland's problems have not yet reached the stage of major public controversy i
such as Diablo or Zimmer, it is clearly evident that the sensationalism of the prob-less with the soils settisment and the cost of the Midland facility will move it j
I more into the public eye as it reaches completion.
I I
If there was any doubt as to the active interest of the Midland community in I
regards to the Midland facility, the February 8,1983 public meeting should have i
dispelled that misconception. The comununity surrounding the plant is extremely I
attentive to the issues and concerns raised by the nuclear facility -- the debate i
will continue. To choose another, more congenial approach to identifying the firm i
that will be responsible for the completion of the plant would be a grave mistake in our opinion.
i l
l C.
The plans that the NRC staff has made to determine the actual "as l
l built" condition of the rest of the buildings and systems on the Midland j
site in the wake of the findings in the Diesel Generator Building l
inspection.
i The aggressive efforts of the DGB inspection were a solid step forward in l
determining the extent of the problems at the Midland facility. However, it is unfortunate that the inspection did not expand to other buildings. The public must have confidence that all the problems have been identified, as well as basic factors about how the problems were caused and how they are going to be fixed if there is ever any hope for restoring faith in the safety of the plant.
D.
The methodologies that_are to be employed in the technical review of l
generic problems on the site, such as determining the accuracy of quality l
control / quality assurance documentation made suspect by the flawed process, l
and the training and recertification of all the wolders who were trained F
by Photon Testing, Inc.
i The two items mentioned above, as well as problems that have resulted from -
the SACK corporation, unidentifiable electrical cables, untrained quality control inspectors, material traceability inaccuracies, et_c,., must be ad-e dressed in any workplan to identify the problems on the site. It is not clear whether the NRC staff, the NRR staff or the independent auditor is to j
l
)
w
3 6
Mr. Darrell Eisenhut March 7, 1983 be responsible for identification of all of the problems prior to the start up of construction activities on the site.
E.
The resolution of what is and what is not "Q" work in regards to the soils remedial work should be handled in a public forum.
I The "Q" debate between NRC staff membars - including Regional management and the on-site inspectors - as well as between the NRR and NRC staff has been a topic of considerable concern to us. The resolution of these issues has critical implications for the rest of the
(
soils work project. Because it has been a major item of discussion I
in the hearings currently underway in Midland, as well as among the staff, we believe that it would be beneficial for you to receive the position that concerned citizens have taken. I have suggested that those residents who have been following this issue very closely prepare a position statement for your office on the "Q" soils issue.
II.
CosmENTS CONCERNING THE THIRD-PARTY REVIEWS 3
It is our understanding that there are currently three separate independent i
audits being conducted (or considered) at the Midland facility. These ares (1) The Stone and Webster Corporation's third party independant assessment of the soils remedial work activities. A February 24, 1983 letter from Mr. Keppler to Consumers outlines the scope of the S&W assessment. It significantly broadens the original scope of S&W's review. As a result of the expansion of S&W's responsibilities, and apparently a close monitoring of their work by the RIII i
team, Mr. Keppler approved the release of additional underpinning work for construction. We request the following documents in reference to the S&W approvals j
a.
The criteria that NRC officials used to judge the adequacy of the initial S&W work, b.
The methodologies which the S&W personnel are utilizing to provide their QA overview and assessment of the design packages, inspector requalification and certification program, and training program:.
c.
The details of the expanded work contract which will assess the actual underpinning work on safety-related structures.
(2) The Independent Design verification and vertical slice review being performed by the TERA Corporation.
We have recently received the detailed Engineering Program Plan from TERA on the Midland Project. Although extremely impressed with some of TERA's procedures, organisation and structure there are a number of areas which raise serious questions.
WhatspecificreportingproceduresdoesTERAhavetodellow s.
in regards to findings, corrective action reports, controversies among their own staff over issues of noncompliance or questionable accuracy, and internal reporting. Figure 1-1 clearly indicates that i
4
'l m
dd
(,
- /,.
4 t'
l Mr. Darrell Eisenhut March 7, 1983
+
TERA intends to notify the NRC at the same time as Consumers, but l
at the February 8 meeting there was a very clear example of,that j
not actually happening because of miscammunication between TERA and the l
NRC.
i i
j I
b.
What is the difference between a Corrective Action Report as referenced j
in the QA Audit Procedures and a Non-Conformance Report as required j
by 10 CFR Part 21.
( A similiar " informal" nonconformance reporting procedure at the William H. Eisumer plant caused innumerable problems i
for both the NRC and the licensee.) We would ask that the C.A.R.'s be forwarded to the NRC, or preferably be writtan up as NCR's immediately upon identification of an item of non-compliance. Any discretion between informal and formal procedures should be limited to the judgement of the NRC.
a j
c.
What is the intent and scope of the " EXCEPTIONS" referred to in Part 1.1 of the plan?
1 i
d.
Who controls the Administrative decision making process between Consumers and TERA over specific points of technical controversy?
e.
What documents will be forwarded to the NRC in support of the various findings - whether favorable or unfavorable - during the i
course of the two vertical slice reviews?
l j
(Further comments and questions about the TERA plan will be forthcoming j
under separate cover when we are able to finish our review.)
l l
(3) The overall independent third-party aussment.- Instead of providing i
your office with our detailed ( and lengthy) walvis of the flaws and shortcomings of the CCP as introduced by Pmsumers in the January 10, 1983 i
letter and the public meeting we have decided to wait for further detail to l
be provided by consumers on their plan. We are somewhat anxious about this, I
as we understand that there have been detailed discussions going on between the l
NRC and Consumers. As you know,
similar events at the Eisumer plant led to i
increased public skepticism and an even greater loss of confidence in the NRC process.
We strongly encourage your office and the Regional Administrator to consider the process of choosing a third-party auditor as important and delicate as was the process at Einsmer. If there is to be a " closed door" approach to Midland we request that you articulate that at this time. If you do not we will assume that the NRC intends to follow a fully public process of nomination and selection.
Thank you for your time, we look forward to answers to out questions in the near future.
Sincerely,
-l' 31LLIE PIIWEER GARDE Director, citisens Clinic
- 5-e