l GOVERNMENT ACCOUNTABILITY PROJECT institute for Policy Studies 1901 Que Streer. N.W., Washington, D.C. 20009 (202)234 9382 August 8, 1983 Mr. Darrell C.
Eisenhut Director, Division of Licensing U.S.
Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Eisenhut:
It is my understanding that the Division of Nuclear Reactor Regulations (NRR) Division of Engineering has developed a review group composed of four technical members, a group leader, two team members from the structural review staff and a structural consultant to review the concerns of Dr. Ross Landsman over the structural adequacy of the Diesel Generator Building at the Midland Nuclear Power Plant.
Please provide the following information to us as soon as possible:
1.
The names, resumes, and nomination process for the members of the review team; 1/
2.
The methodology by which the review ef f ort will be completed, and 3.
The plans for public participation or oversight, including the input of expert consultants, into the technical report.
We look forward to your immediate response.
Sincerely, bL bC o
Billie Pirner Garde pdc T/
In particular we are interested,in the selection'of'the k
independant consultanc.