Advises of Review & Plans Re Reload Core.Forwards Table 1 Providing Summary of Key Parameters.W/Approval of Amend 51 to DPR-30,util Concludes That Addl Tech Spec Changes Not Required.Reload Core Design Will Be Verified by Std Tests
ML19309E793
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/17/1980
From: Peoples D
COMMONWEALTH EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8004240412
Download: ML19309E793 (4)


Text

,____________.

Commonwealth Edison One First National Plaza. Chicago. Illinois Address Reply to. Post Office Box 767 Chicago. Illinois 60690 April 17, 1980 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Quad Cities Station Unit 2 Cycle 5 Operation Per Provisions of 10 CFR 50.59 NRC Docket No. 50/265 References (a): T. A. Ippolito letter to D. L. Peoples dated March 20, 1980

Dear Sir:

Quad Cities Unit 2, which has concluded its fourth cycle of operation, has rapidly completed refueling outage activities.

This letter is to advise you of Commonwealth Edison Company's review of and plans regarding the reload core. Table 1 provides a summary of key parameters for this reload.

The reload core was designed to perform under current nominal design parameters, Technical Specifications and related bases, and current setpoints (as modified by References (a)) such that:

1. Core characteristics will be less limiting than those previously reviewed and accepted, or
2. For those postulat*- incidents analyzed and reported in the Final Safety Analysis Report (FSAR) which could potentially be affected by fuel reload, reanalysis has demonstrated that the results of tt.e postulated events are within allowable limits. Commonwealth Edison .

Company has performed detailed reviews of the General Electric prepared Supplemental Reload Licensing documents and the associated bases and references.

Based on these reviews, safety evaluations were performed by Commonwealth Edison On-Site and Of f-Site Review pursuant to the requirements of 10 CFR 50.59(a) and 10 CFR 50.59(b).

8 0 0 4 24 0 4/SL

. s Commonwealth Edison J

Director of Nuclear Reactor Regulation April 17, 1980 Page 2 As in the past, the Supplemental Reload Licensing Docume4ts relied on previously reviewed and accepted analyses reported in the FSAR, the Generic Reload Fuel Application (NEDE-24011-P-A), and the most recent LOCA analyses for Commonwealth Edison's BWR-3's (NEDO-24146A). Commonwealth Edison verified that the reanalyses were performed in accordance with General Electric reload analysis methodology as described in NEDE-240ll-P-A and that the results of these reanalyses were within l previously reviewed and accepted limits. <

With the approval of Amendment No. 51 to DPR-30 transmitted in Reference (a), Commonwealth Edison has concluced that additional Technical Specification changes are not required for operation of Quad Cities 2 Cycle 5. Commonwealth Edison  ;

On-Site and Of f-Site Reviews have also concluded that no unreviewed '

safety questions as defined by 10 CFR 50.59 are involved with this reload. More specifically:

1. There is no increase in the probability of occcurence or the consequences of an incident or malfunction of equipment important to safety previously evaluated in the safety analysis report.  ;
2. No additional accident or malfunction of a different type than any evaluated previously in the safety analysis report has been created, and  ;
3. There has been no reduction in the margin of safety as defined in the basis for any technical specification.

Finally, verification of the reload core design will be performed per the standard startup physics tests normally performed at the start of each reload cycle. In addition to Core Loading Verification, these tests will include, but not be limited to, those required by Technical Specifications such as:

1. Shutdown Margin Demonstration,
2. Control Rod Drive Scram Timing,
3. Nuclear Instrument Calibrations,
4. Reactivity Anomaly Surveillance, and
5. Thermal Limits Evaluation.

. s Commonwealth Edison Director of Nuclear Reactor Regulation April 11, 1980 -

Page 3 The following tests will be performed primarily for '

o'a'ational information as discussed during the BWR Owners /CE p.t. tings with the Reactor Safety Branch in February and March of ,

1979:  ;

1. TIP Uncertainty Evaluation,
2. Crit.ical Eigenvalue Comparison, and
3. Con. trol Rod Function and Subcritical Checks.

Therefore, based on the NRC Staff's SER of Reference (a),

additional Quad Cities 2 operating license amendments are not required for resumption of operation with the reload core. Our estimated startup date is shown in Table 1 for your information.

One (1) signed original and thirty-nine (39) copies of this transmittal are provided for your use.

Very truly yours, Lef*J

0. L. Peoples ,

Director of Nuclear Licensing .

2932A. i

I-

. e i

TABLE 1 QUAD CITIES 2 Reload 4 Cycle (N) 5 Cycle N-1 Burnup 7959 MWD /ST Projected Cycle N Burnup* 5578 MWD /ST f Reload Batch Size 180 '

i Reload Bundle Avg. Enrichment 2.65

-(

Re;oad Bundle Design P80RB265L (176) [

8DRB265L(4)

Estimated Startup Date 4/17/80

  • to End of Full Power' Capability (EOFPC) based on actual cycle N-1 Burnup t

. i 2932A 9

i 4

i I