ML20027B392

From kanterella
Revision as of 21:13, 20 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1982
ML20027B392
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/02/1982
From: Norris H
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20027B383 List:
References
NUDOCS 8209200392
Download: ML20027B392 (4)


Text

-

Enclorure to Szrial: RSEP/82-1546 Page 1 of 4 , ,

OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 820902 COMPLETED BY: H. Ray Norris TELEP110NE: (803) 383-4524 OPERATING STATUS Notes:

1. Unit Name:- H. B. Robinson Unit No. 2 There are presently 157 spent 2.. Reporting Period: 820801,0000/820831.2400 fuel assemblies in the spent fuel pool.
3. Licensed Thermal Power (MWt): 2300
4. Nameplate Rating (Gross MUc): 739
5. Design Electrical Rating (Net MWe): 700
6. thximum Dependable Capacity (Gross MWe):700
7. Maximum Ucpendable capacity (Net MWe): 665 Give
8. If Changes Occur in capacity Ratings (Item Number 3 through 7) Since Last Report, Reasons: No change.

1955 MWT Reactor Power

9. Power Level to Which Restricted, If Any (Net MWe):

Although the Unit is not restricted by any outside

10. Reasons For Restrictions, If Any:

agency, the power level is presently reduced due to steam generator considerations.

This Month Yr.-to-Date Cumulative 744 5,831 100,757

11. M~w= in Poporting Period 1,671.83 74,017.25 304.73
12. Number of Hours Reactor Was Critical 0 0 1.085.30
13. Reactor Reserve Shutdown Hours, 215.10 1,582.20 72.137.51

. 14. Hours Generator On-Line 0 0 23.20

15. Unit Reserve Shutdown 11ours 288,420 2,789.730 145.885.104
16. Gross Thermal Energy. Generated (MWH)
17. Gross Electrical Energy Generated (MWll) 72,952 871,282 46.949.252
18. Not Electrical Energy Generated (MWil) 54,841 788.700 44.408.951 28.91 27.13 71 59
19. Unit Service Factor 28.91 27.13 71. 61 1
20. Unit Availability Factor 66.27 11.08 20.33
21. Unit Capacity Factor (Using MDC Net) 19.32 62.96
22. Unit Capacity Factor (Using DER Net) 10.53 45.29 10.11 14.49
23. Unit Forced Outage Rate
24. Shut' downs Scheduled Over Next 6 lbnths (Type, Date, and Duration of Each):

Type-2, 2/26/83. Four week steam nenerator insnection outace.

On line

25. If Shut Down At End of Report Period, Estimated Date of Startup:

Forecast Achieved

26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY --- ---

INITIAL ELECTRICITY --- ---

COMMERCIAL OPERATION (W77) 820920039e ,

C8

_ . . . . , -,......3

O EncloIure to Strinl: RSEP/82-jp[4 - GAGE DAII.Y UNITl'0WER LEVEL-Pags 2 of 4 - .

DOCKET NO. 50-261 0

UNIT DATE 820902 C0\!PLElED 11Y u v oy %,.,.f, TELEPil0NE (803) 383-4524 MONTil '~ August' DAY AVER AG5 DAILY POWER LEVEL DAT- A\ ER AGE DAILY POWER LEVEL (3py, y,g3 (SIWE Net) 1 0 0 17 0 0 2 gg 0 0 3

0 0 4 y, 0 13 5 21 4 0 77

- 22 7 0 0 23 8 -_0 . - 28 109 9 0 25 130 10 0 26 274 33 0 378 27 I O -

28 373 0 367 33 29 0 478 34 30 IS 0 3g 530

    • 0 16 INSTRUCTIONS On this format.hst the averagc~ daily unit power leselin alwe. Net for exh d'II"'I"' terotting mo.1th. Compute to the nearest whole negawatt.

(9/771 6

  • m * * * * .T 3 N

Enclosure to Serial: RSEP/82-1546 Page 3 of 4 50-261 UNITS!!UIDOWNS AND POWER REDUCTIONS DCCKET NO.H.B. Robinson UNIT NAME DATE820902 ,

COMPLETED 1:YH. Rav Norris REPORT AIONTl! Auguse TEl.LPl!ONE IDU31 383-4324

., ,$g 3 Y Liccnsee ,Ek ', Cause & Corrective No. DJte y, 5g # js5 Event E? e.8 Action to t-fE & .f:

x gj gg Report:. Jiu -

u 8O Prevent Recurrence O

1 2-01 320801 S 350.80h/C 3 - - - -

ZZ IZZZZZ Shutdown for maintenance / refueling outage.

08-02 820815 . F 131.59 B 3 ---

HB llTEXCH While bringing the unit off line due to faulty MW indication, the unit tripped. Cause-low level S/G -

resulting in low level trip.

08-03 820821 F 6.00 ,A 3 -- HH VALVEX High level S/G. Cause-trip due to feed water reg. valve malfunction.

08-04 820821 F 8.01 A 3 HH VALVEX High level S/G. Cause trip due to feed water reg. valve malfunction.

08-05 820822 F 32.27 B 1 HA TURBIN Required turbine over speed trip test following refueling / maintenance outage .

08-06 820825 F 0.23 B 1 ---

HA TURBIN Required turbine test-adjusted over-speed trip.

I . 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions S: Sst:edu!cd A Equipment Fai!ure(Expkin) I-Manual for Preparation of Data lialaintenan::e of Test 2-Manual Scram. Enity Sleets for I.ieensee C Rcrueling 3 Automatic Scram. Event Repost (l.I:R) l'ile (NUREG.

D.I<egula:ory Restriction 4 Other (Explain) 0161)

E-Operator Tr:.ining1 License Examination F AtInunistra:ne 5 G Operational Enor (Explain) Exhibit 1. Same Source (9/77) 11 Othes (Explain)

- S2ric1: RSEP/82-1353 En,clorura to S rinl: RSEP/82-1546

' agm

" 4 of 4 GPERATING DATA REPORT DOCKET NO: 50-261

( DATE: 820802 COMPLETED BY: H. Ray Norris TELEP110NE: (803) 383-4524 OPERATING STATUS Notes: l

  • There are presently 157 spent
1. Unit Name; H. B. Robinson Unit No. 2 fuel assemblies in the spent fuel
2. Reporting Period: 820701.0000 / 820731,2400 pool,
3. Licensed Thermal Power (FMt): 2300
4. Nameplate Rating (Gross MUe): 739
5. Design Electrical Rating (Net MWe): 700
6. Maximum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe): 665
8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons: No Change
9. Power Level to Which Restricted, If An'y (Not MWe): Approximately 535 (80% Reactor Power)
10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside acency. the power level is presently reduced due to steam generator considerations.

~

This Month Yr.-to-Date Cumulative 5,087 100,013

'. Ho'ur2 in Reporting Period 744

( 0 1,367.1 73,712.52

42. Number of Hours Reactor Was Critical 1,085.30 0 0
13. Reactor Ecserve Shutdown Hours 1,367.1 71,922.41
14. Ilours Generator On-Line ,

0 0 23.20

15. Unit Reserve Shutdown llours 2.501,310 145,596,684
16. Gross Thermal Energy Generated (MWil) 0
17. Gross E1cetrical Energy Generated (MRil) 0 798,330 46,876,300

-8,733 733,859 44,354,110

18. Net Electrical Energy Generated (MWH) 0 26.87 71.91
19. Unit Service Factor 71.93 -
20. Unit Availability Factor 0 26.87
21. Unit Capacity Factor (Using MDC Net) -1.77 21.69 66.68
22. Unit Capacity Factor (Using DER Net) -1.67 20.61 63.35
23. Unit Forced Outage Rate 0 0 14.35
24. Shutdowns Scheduled Over Next 6 lbnths (Type, Datc, and Duration of Each):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup: August 7, 1982
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY -- --

COMMERCIAL OPERATION --

CRevision No.' 1 ,

i

(

(9/77) cs l

,, ,