Monthly Operating Rept for Feb 1985
ML20112D913
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/28/1985
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
15505, NPD-85-525, RNPD-85-525, NUDOCS 8503220470
Download: ML20112D913 (6)


Text

..

~

n 6'

,Enclorure to Serials -RNPD/85-525

.i, Page 1 of 5 OPERATING DATA REPORT DOCKET'NO. 050-0261 DATE 03/08/85 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524

' OPERATING' STATUS i UOTES~~~~~~~~~~~~~~~~~~~~~~~I

~

.1. UNIT NAME: ROBINSON UNIT;2 ThLREPORTING PERIOD: FEDRUARY 05 1

1

3. LICENSED THERMAL POWER (MWT)-~2300 l There are presently 222 Fuel l

4.JNAMEPLATE_ RATING (GROSS MWE) 739.0 l Assemblies in the Spent Fuel l

. L5. DESIGN-ELECTRICAL RATING (NET MWE)' 700.0

[ Pool.

i l

U16. CMAX-DEPENDADLE CAPACITY.(GROSS MWE) 700.0 1 l I7. MAX DEPENDABLE CAPACITY (NET MWE): 665.0 8.'IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

I

'?,

POWER LEVEL TO WHICH' RESTRICTED IF ANY (NET MWE)- None ci O. REASONS FOR RESTRICTION IF ANY:

None b

^

THIS YR TO CUMUL' MONTH DATE ATIVE

~

672.00 1416.00 122646.00 l ii. HOURS IN-REPORTING PERIOD.

421.65 653.85 84851.15 Li2. NUMBER-OF HOURS REACTOR CRITICAL

13. REACTOR RESERVE SHUTDOWN HRS 250.35

_735.47-

_ 2672.54 413.37' 551.97 82617.92 514'. HOURS GENERATOR ON LINE

_15.: UNIT RESERVEcSHUTDOWN-HOURS 1

.00

.00 23.20-4 F 16. GROSS THERMAL ENERGY GEN. (MWH) 797932.56 937533.36 163812767.52

! :17.L GROSS EL.EC. ENERGY GEN. (MWH) 261150.00

,304406.00 52649282.00 i18. NET--ELEC. ENERGY GENERATED (MWH) 245904.00L 277987.00

-49687648.00-61.51 38.98 67.36

19. UNIT' SERVICE FACTOR 20.' UNIT AVAILADILITY FACTOR 61.51 38.98 67.38
21. UNIT CAP. FACTOR (USING MDC NET) 55.03.

29.52

'60.92 (USING DER NET) 52.28 28.05 57.88

,122. UNIT CAP.; FACTOR 38.49 54.32-15.65 23.? UNIT FORCED OUTAGE RATE I'L24.: SHUTDOWNS SCHED. DVER NEXT 6 MONTHS (TYPE, DATE', AND DURATION OF EACH)'

None' E.

ESTIMATED DATE OF START UP 03/01/85 l252'IF'SHUTDOWNATENDOFREPORTPERIOD, 26.; UNITS IN_ TEST STATUS (PRIOR TO COMMERCIAL OPERATION) 'FORCAST ACHEIVED

~~~-~~-

~~~~~- ~

i.

INITIAL CRITICALITY


~~-

t

-INITIAL ELECTRICITY s___

~ ~ ~ ~ ~ ~ ~

~~~~~~~~

COMfiERCI AL OPERATION l

[

8503220470 850228 i

PDR ADOCK 05000261 R

PDR 1.i6 - 9 I:

.__m Page 2 of 5 i

I. - -

APPENDIX B l'

-AVERAGE DAILY POWER LEVEL I'

DOCKET NO. 050-0261 j;

UNIT ROBINSON UNIT 2 DATE 03/01/85 COMPLETED BY A.

E. SCOTT i

TELEPHONE (803)383-4524

/

IFEBRUARY 1985 fDAY'

. AVG.-DAILY-POWER LEVEL' DAY' AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1-

-4 17 648 I

t-I,

-4 18 692 2

-3

-4 19 650

( 4: 20 631

.5--

-4 21 709 i

1.

6

-4 22 728 F

.7

-4 23 721 8

-11 24 603 i

9

-21 25 739

~f0 82 26 738-11 1 357.-

27 539 t

12 362 28

-25 i

r

13

<500 R

' t '.'5

-531 i

[16 564

)

L b

I 1.16 - G i

w ',. -. _..-, _ _.

- m,, -

Pago 3 of 5

-]

DOCKET NO. 050-0261 UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME H. B. Robinson DATE 850301 COMPLETED BY A. E. Scott REPORT MONTif February TELEPHONE 803-383-4524 n.

E E

.! E 3

j.E 3 Licensee h

Cause & Corrective No-Date i

5g 2

2s&

Event g'!

93 Action to jU

$5 5

j pj g Report a mV Prevent Recurrence H

c5 m,)

e 0201 850116 F

228.53 H

1 85-06 SH SUPORT Unit removed from line due to seismic restraint repairs.

Re-analysis of restraint performed to ensure that appropriate safety factors are maintained. Unit re-turned on line 02-10-85.

0202 850219 F

H 4

CH PUMPXX Unit was at 100% power when heater drain pumps tripped due to low heater drain tank level while removing level control valve at discharge of heater drain pump from service. Low level was due to drain tank level control valve to the con-denser being stuck shut, thereby permitting drain tank level to rise.

The valve was freed causing a rapid drop in level, thus causing the pumps i

2 3

4 F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee i

C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative 5

G-Operational Error (Explain)

Exhibit ! - Same Source

(')/77) llother (Explain) 1

O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

050-0261 UNIT NAME H. B. Robinson DATE 850301 COMPLETED BY A. E. Scott-REPORT MONTH February TELEPHONE 803-383-4524 e.

E c

3E 3

jU Licensee

,Eg f.

Cause & Corrective Date g

3g g

jg5 Event g7 gO3 Action to

$E 5

H

~5e Report a mV Prevent Recurrence e

o g

u O

' S' 0202 850219 F

H 4

CH PUMPXX to trip. Unit load was decreased to 85% power to compensate. Level control valves were subsequently returned to normal' problem free operation. Return to full load was delayed due to the transient causing secondary chemistry problems.

Con-densate polisher demineralizers were regenerated allowing cleanup of the secondary water. Unit returned to full load.

0203 850227 F

30.10 A

3 85-09 EA TRANSF "C" main transformer lightning arrestor failure resulted in a loss of a phase / generator lockout, which caused a reactor trip.

"C" main transformer lightning arrestor was repaired.

I 2

3 4

)

F: Forced Reason:

Method:

Exhibit G. instructions i

S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scrarn-Entry Sheets for Licensee i

C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F Administrative 5

G-Operational Error (Explain)

Exhibit i. Same Source (9/77)

Il4)ther (Explain) 1 1

Peg 2 5 of 5 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

050-0261 UNIT NAME H.

B. Rnhinann DATE 850301

' COMPLETED BY A. E. Scott REPORT MONT11 Febrim rv TELEPHONE rob 1R ba576 "i

-;;m, r,...e a porreceive e.

3 -m e

.=2 _e g

7.c X Licenste g.t, e

M.

[hte g

3g g

jg5 Event u7 h

Action to

$E 5

jdig Report *

$0

}O Prevent Recurrence c5 m.

0204 850223 S

B 4

ZZ TURBIN Unit load reduced to 65% reactor power to perform bi-weekly turbine valve test.

Upon completion of test the unit returned to full load.

I I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions t

S: Scheduled A.Equiprnent Failure (Explain) l-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administ rative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77) llother (Explain)

~%

CD&L Carolina Power & Light Company ROBIN RTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 MAR 8 1985 Robinson File :

15505 Serial: RSEP/85-525 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 ROBINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. Taylor:

In accordance with Technical Specifications 6.9 1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1985 Very truly yours,

(&<

h. E.

rgan General Manager H. B. Robinson SEG Plant AES:sr/C-240 Enclosure oc: