Enclorure to Szrial: RSEP/82-1546 Page 1 of 4 OPERATING DATA REPORT DOCKET NO: 50-261 DATE: 820902 COMPLETED BY: H. Ray Norris TELEP110NE: (803) 383-4524 OPERATING STATUS Notes:
- 1. Unit Name:-
H. B. Robinson Unit No. 2 There are presently 157 spent 2.. Reporting Period:
820801,0000/820831.2400 fuel assemblies in the spent
- 3. Licensed Thermal Power (MWt): 2300 fuel pool.
- 4. Nameplate Rating (Gross MUc): 739
- 5. Design Electrical Rating (Net MWe): 700
- 6. thximum Dependable Capacity (Gross MWe):700
- 7. Maximum Ucpendable capacity (Net MWe): 665 Give
- 8. If Changes Occur in capacity Ratings (Item Number 3 through 7) Since Last Report, Reasons:
No change.
1955 MWT Reactor Power
- 9. Power Level to Which Restricted, If Any (Net MWe):
Although the Unit is not restricted by any outside
- 10. Reasons For Restrictions, If Any:
agency, the power level is presently reduced due to steam generator considerations.
This Month Yr.-to-Date Cumulative 744 5,831 100,757
- 11. M~w= in Poporting Period 304.73 1,671.83 74,017.25
- 12. Number of Hours Reactor Was Critical 0
0 1.085.30
- 13. Reactor Reserve Shutdown Hours, 215.10 1,582.20 72.137.51
. 14. Hours Generator On-Line 0
0 23.20
- 15. Unit Reserve Shutdown 11ours
- 16. Gross Thermal Energy. Generated (MWH) 288,420 2,789.730 145.885.104
- 17. Gross Electrical Energy Generated (MWll) 72,952 871,282 46.949.252
- 18. Not Electrical Energy Generated (MWil) 54,841 788.700 44.408.951 28.91 27.13 71 59
- 19. Unit Service Factor 28.91 27.13
- 71. 61 1
- 20. Unit Availability Factor 11.08 20.33 66.27
- 21. Unit Capacity Factor (Using MDC Net) 10.53 19.32 62.96
- 22. Unit Capacity Factor (Using DER Net) 45.29 10.11 14.49
- 23. Unit Forced Outage Rate
- 24. Shut' downs Scheduled Over Next 6 lbnths (Type, Date, and Duration of Each):
Type-2, 2/26/83. Four week steam nenerator insnection outace.
On line
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
Forecast Achieved
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (W77) 820920039e C8
-,......3
O EncloIure to Strinl: RSEP/82-jp[4 GAGE DAII.Y UNITl'0WER LEVEL-Pags 2 of 4 50-261 DOCKET NO.
0 UNIT DATE 820902 C0\\!PLElED 11Y u
v oy %,.,.f, (803) 383-4524 TELEPil0NE MONTil '~
August' DAY AVER AG5 DAILY POWER LEVEL DAT-A\\ ER AGE DAILY POWER LEVEL (3py, y,g3 (SIWE Net) 1 0
0 17 0
0 2
gg 0
0 3
0 0
4 y,
0 13 5
21 0
77 4
- 22 7
0 0
23 8
-_0 28 109 9
0 25 130 10 0
274 26 0
378 33 27 I
O 28 373 0
367 33 29 0
478 34 30 IS 0
530 3g 0
16 INSTRUCTIONS On this format.hst the averagc~ daily unit power leselin alwe. Net for exh d'II"'I"' terotting mo.1th. Compute to the nearest whole negawatt.
(9/771 6
- m
.T
3 N
Enclosure to Serial:
RSEP/82-1546 Page 3 of 4 50-261 UNITS!!UIDOWNS AND POWER REDUCTIONS DCCKET NO.H.B.
UNIT NAME Robinson DATE820902 COMPLETED 1:YH. Rav Norris REPORT AIONTl! Auguse IDU31 383-4324 TEl.LPl!ONE
,$g 3
Y Liccnsee
,Ek Cause & Corrective No.
DJte y,
5g js5 Event E?
e.8 Action to fE
.f: gj g Report:.
Jiu 8O Prevent Recurrence t-g u
x O
1 2-01 320801 S
350.80h/C 3
ZZ IZZZZZ Shutdown for maintenance / refueling outage.
08-02 820815 F
131.59 B
3 HB llTEXCH While bringing the unit off line due to faulty MW indication, the unit tripped. Cause-low level S/G resulting in low level trip.
HH VALVEX High level S/G. Cause-trip due to 08-03 820821 F
6.00,A 3
feed water reg. valve malfunction.
08-04 820821 F
8.01 A
3 HH VALVEX High level S/G.
Cause trip due to feed water reg. valve malfunction.
08-05 820822 F
32.27 B
1 HA TURBIN Required turbine over speed trip test following refueling / maintenance outage 08-06 820825 F
0.23 B
1 HA TURBIN Required turbine test-adjusted over-speed trip.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Sst:edu!cd A Equipment Fai!ure(Expkin)
I-Manual for Preparation of Data lialaintenan::e of Test 2-Manual Scram.
Enity Sleets for I.ieensee C Rcrueling 3 Automatic Scram.
Event Repost (l.I:R) l'ile (NUREG.
D.I<egula:ory Restriction 4 Other (Explain) 0161)
E-Operator Tr:.ining1 License Examination F AtInunistra:ne 5
G Operational Enor (Explain)
Exhibit 1. Same Source (9/77) 11 Othes (Explain)
S2ric1: RSEP/82-1353 En,clorura to S rinl: RSEP/82-1546
' agm 4 of 4 GPERATING DATA REPORT DOCKET NO: 50-261
(
DATE: 820802 COMPLETED BY:
H. Ray Norris TELEP110NE: (803) 383-4524 OPERATING STATUS Notes:
l
- There are presently 157 spent
- 1. Unit Name; H. B. Robinson Unit No. 2 fuel assemblies in the spent fuel
- 2. Reporting Period: 820701.0000 / 820731,2400
- pool,
- 3. Licensed Thermal Power (FMt):
2300
- 4. Nameplate Rating (Gross MUe):
739
- 5. Design Electrical Rating (Net MWe): 700
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (Net MWe):
665 Give
- 8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Reasons:
No Change
- 9. Power Level to Which Restricted, If An'y (Not MWe): Approximately 535 (80% Reactor Power)
- 10. Reasons For Restrictions, If Any: Although the unit is not restricted by any outside the power level is presently reduced due to steam generator considerations.
acency.
~
This Month Yr.-to-Date Cumulative
(
'. Ho'ur2 in Reporting Period 744 5,087 100,013
- 42. Number of Hours Reactor Was Critical 0
1,367.1 73,712.52
- 13. Reactor Ecserve Shutdown Hours 0
0 1,085.30
- 14. Ilours Generator On-Line 0
1,367.1 71,922.41
- 15. Unit Reserve Shutdown llours 0
23.20
- 16. Gross Thermal Energy Generated (MWil) 0 2.501,310 145,596,684
- 17. Gross E1cetrical Energy Generated (MRil) 0 798,330 46,876,300
- 18. Net Electrical Energy Generated (MWH)
-8,733 733,859 44,354,110
- 19. Unit Service Factor 0
26.87 71.91
- 20. Unit Availability Factor 0
26.87 71.93
- 21. Unit Capacity Factor (Using MDC Net)
-1.77 21.69 66.68
- 22. Unit Capacity Factor (Using DER Net)
-1.67 20.61 63.35
- 23. Unit Forced Outage Rate 0
0 14.35
- 24. Shutdowns Scheduled Over Next 6 lbnths (Type, Datc, and Duration of Each):
None
- 25. If Shut Down At End of Report Period, Estimated Date of Startup: August 7, 1982
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION CRevision No.' 1
(