Monthly Operating Rept for May 1985
ML20126L714
Person / Time
Site: Robinson 
Issue date: 05/31/1985
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RNPD-85-1207, NUDOCS 8506200122
Download: ML20126L714 (4)


Text

,

-. -. ~. _.

Attachmint to Serial: 'RNPD/85-1207 j

-Paga 1 of 3 i

1 1,

a f

OPERA 7INE DA I A 9PG :T.

s DUCMET NO. 050-02aj DATE 06/04/05 i

COMf n ETC1) BY A.

E.

JCul r

].

?ELEPHDta s003)303-Tf24

' DPERnTING.SToHL1 i

)

t-RODINSON UNI.T 2. 05

! 222 fuel assemblies in the spent }

j J.?Udli NAME;

! NOTES There are pre.sently

!-2< EfiPORTING rERIOD: MAY

1. 3.iLICEMSED 1HERFAL POWER (hW D 2300' l fuel' pool, i

a i

4.

NAMEPLATE RATING (GROSS MWE) 739.0-i

{:?S. DESIGt! ELECTRICAL RATING (NET,MWE). 700=0 l

6.-haX DEPENDABLE CAPACITY..(GROSS MWE) 900iG l 7.

MAX-DEPENDADLE CAPACITY-(NET MWE) 665.0 4

p 'O. IF CHANGES 10CCOR IN CAPACITY RATINGS (ITEMS 3.THRU.7)-SINCE LAST-REPORT, j

GIVE REASONS:

1 i

f i 9 POWER LEVEL TO. 'WHICH RES TRICTED ' IF ANY (NET MUE)

N'one jdu. REASOMS,FOR RESTRICTION lf ANY' None a

P 1

THIS YR TO JCUt!UL MOiH H DATE

-ATIVE 3

. 1 1' c H O U r k IN REPORTING PERIOD

-749100 3623.00

't21053.00 I12..NUMTER OF HOURS REACTOR CRITICAL;

?,30.58 2794i95 06992.23

'13.

REACTOR RESERVE MHUTDOWN HRS-13.42' 801.37 2738.44

-729.47

^673.49 84739;44

j b. HOURS GENERATUR ON LINE1 r

> i 5.

UMIT RESERVE'ShUFDOUN HOURS

.00

.00 23.20 1t 16. CROSS lHERMAL-ENERGY GEN;-(MWH) 1616620.32

.5604043.36 16855927/.52 fj7; GROS: ELEl'. -ENERGY GEN. (MUH) 531610.00-

.1965611.00 54210487.00 j.10. NET ELEC. ENERGY CCNERAMD (MuH)

S09340.00 1.764672.00-51174333.00 j 19. -UNIT SERVIC!E FACTUR 90.0) 73,79 67.07

20; UNIT AVAILADlLITY I" ACTOR.

'90.0i.

73.79 67.07

{21.-UNIT CDP,- FACTOR (USINC MDC NET) 102;V5 73.24 41.04 j22. UNIT CAP. FACTOR (USING DER NET)

??.00 6? de 50.55

^23. UN1T FORCED QUTAGE RATE i.?v-

' 21. 72. -

49.39 l 24. ' SHUTDGWNS SCHED. UVER NE'iT -6 MONTHS ( T YPE E DATE, AND.DURATI_0N.OF EACH). None-3 s

4 25, IF SUUTDONN.AT:END 0F REPGRf PERIOD, ESTItfATED. LATE-0F START,OP:

t (26. UNITF IN TEST. STATUS (PRIOR ~TO. COMMERCIAL OPERAFIGN)i FORCAST' ACHEIVED 1NLIIAL CRITTCALITY:

T" r-" -

l INIIIAL ELECTRICITY

-- C -

C-2 COMMERCIAL' OPERATION,

~ M- - -

  1. ~~ "

t-(.

F

$$2'8288E" Psoold61 J [.

R PDR

,.-.a y - y-

,, ~.,,. -, - _, -,,.

, ~ -, ~.., +,,,..., - -., - - - -,., - -.., -,..

I-t..

l-Pcgr 2 of 3

.D N

  • L' y

APPENDIX D

((

AVERAGE DAILY POULR LEVEL

,1 DOCKET NO. 050-0261 UNIT fiODINSON UNIT 2 DATE 06/04/05 cot 1PLETED DY A.

E.

SCOTT TELEPHONE (803)303-4524 l ii A Y 1985 l DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(NWE-NET) l 1

720 17 723 2

728 18 722 (3

728 19 722 i ri 606 20 724

'i

5 614 21 302

<l x 1

i6 720

-22 257 I

l

! 7 727 23 689 i

I lja 472 24 721 i!9 717 25 725 lJo 730 26 723 1

,li 730 27 722 l12 729 20 722

'13 720 29 720 y

l14 724 30 719

'iS 722 31 719 16 720 e

1.16 - 8 7,-

>q j

P:ga 3 of 3 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0261 UNIT NAME H.

B. Robinson V

DATE 06-05-85 COMPLETED SY Anita E. Scott REPORT MONTit May TELEPHONE, 803-383-4524 E

E

.{ g 3

jY~

Licensee

,E g

$"?

Cause & Corrective No.

Date

.g 3g i

jss Event g?

Action to gO H

yE e

j;gg Report a mo Prevent Recurrence g

b i

0501 850504 S

B' 1

ZZ TURBIN Reactor power reduced to 65% for monthly turbine valve test.

0502 850508 F

B 1

CB PUMP "A" Circ Water Pump.had a potential insulation problem.

Pump was removed from service and tested. Overall inspection performed with satisfactory results and "A" Cire Water Pump was returned to service. Unit was returned to 100% power.

0503 850521

.F 14.83 G

3 85-013 HH INSTRU The wrong steam generator level transmitter was inadvertently isolated with a low level steam generator signal present on a redundant trans-mitter causing the Unit to trip.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions l

S: Scheduled

- A Equipment Failure (Explain) 1-Manual for Preparation of Data i

B-Maintenance or Test 2-Manual Scrarn.

Entry Sheets for Licensee l

C. Refueling 3-Automatic Scram.

Event Repor (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

. EOperator Training & License Examination F-Administrative 5

Goperational Error (Explain)

Exhibit I Same Source l

(9/77) flother (Explain) i

.t Cp&L Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JUN 7 1985 i

Robinson File:

15505 Serial:

RNPD/85-1207 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 h0BINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET NO. 50-261 LIGNSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. Taylor:

In accordance with Technical Specifications 6.9 1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of May,1985.

Very truly yours, ll 5

R/E. Morgan General Manager H. B. Robinson SEG Plant AES:sr/C-1579 Enclosure cc:

R. A. Hartfield (2)

J. N. Grace (1)

{

.