Text
,
-. -. ~. _.
Attachmint to Serial: 'RNPD/85-1207 j
-Paga 1 of 3 i
1 1,
a f
OPERA 7INE DA I A 9PG :T.
s DUCMET NO. 050-02aj DATE 06/04/05 i
COMf n ETC1) BY A.
E.
JCul r
].
?ELEPHDta s003)303-Tf24
' DPERnTING.SToHL1 i
)
t-RODINSON UNI.T 2. 05
! 222 fuel assemblies in the spent }
j J.?Udli NAME;
! NOTES There are pre.sently
!-2< EfiPORTING rERIOD: MAY
- 1. 3.iLICEMSED 1HERFAL POWER (hW D 2300' l fuel' pool, i
a i
4.
NAMEPLATE RATING (GROSS MWE) 739.0-i
{:?S. DESIGt! ELECTRICAL RATING (NET,MWE). 700=0 l
6.-haX DEPENDABLE CAPACITY..(GROSS MWE) 900iG l 7.
MAX-DEPENDADLE CAPACITY-(NET MWE) 665.0 4
p 'O. IF CHANGES 10CCOR IN CAPACITY RATINGS (ITEMS 3.THRU.7)-SINCE LAST-REPORT, j
GIVE REASONS:
1 i
f i 9 POWER LEVEL TO. 'WHICH RES TRICTED ' IF ANY (NET MUE)
N'one jdu. REASOMS,FOR RESTRICTION lf ANY' None a
P 1
THIS YR TO JCUt!UL MOiH H DATE
-ATIVE 3
. 1 1' c H O U r k IN REPORTING PERIOD
-749100 3623.00
't21053.00 I12..NUMTER OF HOURS REACTOR CRITICAL;
?,30.58 2794i95 06992.23
'13.
REACTOR RESERVE MHUTDOWN HRS-13.42' 801.37 2738.44
-729.47
^673.49 84739;44
- j b. HOURS GENERATUR ON LINE1 r
> i 5.
UMIT RESERVE'ShUFDOUN HOURS
.00
.00 23.20 1t 16. CROSS lHERMAL-ENERGY GEN;-(MWH) 1616620.32
.5604043.36 16855927/.52 fj7; GROS: ELEl'. -ENERGY GEN. (MUH) 531610.00-
.1965611.00 54210487.00 j.10. NET ELEC. ENERGY CCNERAMD (MuH)
S09340.00 1.764672.00-51174333.00 j 19. -UNIT SERVIC!E FACTUR 90.0) 73,79 67.07
- 20; UNIT AVAILADlLITY I" ACTOR.
'90.0i.
73.79 67.07
{21.-UNIT CDP,- FACTOR (USINC MDC NET) 102;V5 73.24 41.04 j22. UNIT CAP. FACTOR (USING DER NET)
??.00 6? de 50.55
^23. UN1T FORCED QUTAGE RATE i.?v-
' 21. 72. -
49.39 l 24. ' SHUTDGWNS SCHED. UVER NE'iT -6 MONTHS ( T YPE E DATE, AND.DURATI_0N.OF EACH). None-3 s
4 25, IF SUUTDONN.AT:END 0F REPGRf PERIOD, ESTItfATED. LATE-0F START,OP:
t (26. UNITF IN TEST. STATUS (PRIOR ~TO. COMMERCIAL OPERAFIGN)i FORCAST' ACHEIVED 1NLIIAL CRITTCALITY:
T" r-" -
l INIIIAL ELECTRICITY
-- C -
C-2 COMMERCIAL' OPERATION,
~ M- - -
- ~~ "
t-(.
F
$$2'8288E" Psoold61 J [.
R PDR
,.-.a y - y-
,, ~.,,. -, - _, -,,.
, ~ -, ~.., +,,,..., - -., - - - -,., - -.., -,..
I-t..
l-Pcgr 2 of 3
.D N
- L' y
APPENDIX D
((
AVERAGE DAILY POULR LEVEL
,1 DOCKET NO. 050-0261 UNIT fiODINSON UNIT 2 DATE 06/04/05 cot 1PLETED DY A.
E.
SCOTT TELEPHONE (803)303-4524 l ii A Y 1985 l DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(NWE-NET) l 1
720 17 723 2
728 18 722 (3
728 19 722 i ri 606 20 724
'i
- 5 614 21 302
<l x 1
i6 720
-22 257 I
l
! 7 727 23 689 i
I lja 472 24 721 i!9 717 25 725 lJo 730 26 723 1
,li 730 27 722 l12 729 20 722
'13 720 29 720 y
l14 724 30 719
'iS 722 31 719 16 720 e
1.16 - 8 7,-
>q j
P:ga 3 of 3 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0261 UNIT NAME H.
B. Robinson V
DATE 06-05-85 COMPLETED SY Anita E. Scott REPORT MONTit May TELEPHONE, 803-383-4524 E
E
.{ g 3
jY~
Licensee
,E g
$"?
Cause & Corrective No.
Date
.g 3g i
jss Event g?
Action to gO H
yE e
j;gg Report a mo Prevent Recurrence g
b i
0501 850504 S
B' 1
ZZ TURBIN Reactor power reduced to 65% for monthly turbine valve test.
0502 850508 F
B 1
CB PUMP "A" Circ Water Pump.had a potential insulation problem.
Pump was removed from service and tested. Overall inspection performed with satisfactory results and "A" Cire Water Pump was returned to service. Unit was returned to 100% power.
0503 850521
.F 14.83 G
3 85-013 HH INSTRU The wrong steam generator level transmitter was inadvertently isolated with a low level steam generator signal present on a redundant trans-mitter causing the Unit to trip.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions l
S: Scheduled
- A Equipment Failure (Explain) 1-Manual for Preparation of Data i
B-Maintenance or Test 2-Manual Scrarn.
Entry Sheets for Licensee l
C. Refueling 3-Automatic Scram.
Event Repor (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
. EOperator Training & License Examination F-Administrative 5
Goperational Error (Explain)
Exhibit I Same Source l
(9/77) flother (Explain) i
.t Cp&L Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JUN 7 1985 i
Robinson File:
15505 Serial:
RNPD/85-1207 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 h0BINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET NO. 50-261 LIGNSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. Taylor:
In accordance with Technical Specifications 6.9 1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of May,1985.
Very truly yours, ll 5
R/E. Morgan General Manager H. B. Robinson SEG Plant AES:sr/C-1579 Enclosure cc:
R. A. Hartfield (2)
J. N. Grace (1)
{
.