r-Page 8 of 8 CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 09/05/05 OPERATING DATA REPORT RPD36 RUN TIME 09.41 43 ROBINSON UNIT 2 DOCKET NO. 050-0261 CUMPLETED DY A.
E.
SCulT OPERATING S' LATUS TELEPHONE (003)303-4524
- i. UNIT NAME: ROBINSON UNIT 2 l NOTES There are presently 222 1 2.
REPORTING PERIOD: JUNE 05 l fuel assemblies in the Spent Fuel 1 3.
LICENSED THERMAL POWER (MWT) 2300 i Pool.
I 4.
NAMEPLATE RATING (GROSS MWE)
'/39.0 l
l S.
DESIGN ELECTRICfL RATING (NET MWE) 700.0 1
1 6.
MAX DEPENDABLE CAPACITY (GROSS MWE) 700.0 l 1
7.
MAX DEPENDABLE CAPACIlY (NET MWE) 665.0
-- - - -~~- - --
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEliS 3 IHRU 7) SINCE LASI REPORT, GIVE REASONS 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)- NONE
- 10. REASONS FOR RESTRICTION IF ANY:
NONE THIS YR TO cut 1UL MONiH DATE ATIVE ii. HOURS IN REPORfING PERIOD 720.00 4343.00 125573.00
- 12. NUMDER OF HOURS REACTOR CRITICAL 720.00 3514.95 87712.25
- 13. REACTOR RESERVE SHUTDOWN HRS
.00 001.37 2730.44
- 14. HOURS GENERATOR ON LINE 720.00 3393.49 05459.44
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1635763.60 7319007.04 17019504i.20
- 17. GROSS ELEC. ENERGY GEN. (MWH) 530230.00 2403041.00 S4740717.00 l
- 10. NET ELEC. ENERGY GENERATED (MWil) 513390.00 2270062.00 51687723.00
- 19. UNIT SERVICE FACTOR 100.00 78.14 60.06
- 20. UNIT AVAILADILITY FACTOR 100.00 70.14 60.07
- 21. UNIT CAP. FACTOR (USING hDC NET) 107.22 70.00 61.90
- 22. UNIT CAP. FACTOR (USING DER NET) 101.06 74.93 50.00
- 23. UNIT FORCED OUTAGE RATE
.00 17.94 15.20
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATIUN OF EACH)
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORCAST ACllEIVED INITIAL CRITICALITY INITIAL ELECTRICITY 11 - -
-C--
COMMERCIAL OPERATION
--C--
R 1.16 -9