ML20087A540
| ML20087A540 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/31/1984 |
| From: | Morgan R, Norris H, Scott A CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RSEP-84-177, NUDOCS 8403080135 | |
| Download: ML20087A540 (4) | |
Text
f Enc 12:ura to S; rials RSEP/84-177
' Pc g2 1 cf 3 g
APPENDIX U AVERAGE DAILY POWER LEVr, DOCKET NO. 050-0261 UNIT RODINSON 11 NIT 2 s' DATE C2/24/H4 s
COMPLETEls BY H.
RAY NORRIS TELEPl.ONE (803)383-4524
/ANUARY 1984 ' ~
LAY AVG. DAlt,Y POWER LEVEL' DAY MG. DAILY POWER LEVEL (fiWE-NET; (tiWE-NET) i 302 17 369 2
363 iP 369 3
364 19 367 4
364 20 369 5
364 of 370 4
6 365 22 360 7
265.
23 369 8
366 24 369 9
366 25 369 I
10 367 26 221 l
i1 366 27
-25 l
1 02 366 20
-- i 7
,13 360 29
-G 04 366 30
-8
)
1 15 368
^
31
~5 1
s l
b9
'm I
l
\\
i s
O 84'03080135 840131 t
PDR ADOCK 05000219 R
pg
- '.x
-__-- _--_ _---__-- - _ - - - - - - - - - ~ _ - -
y
<}
Pcg2 2 cf 3 7
.o
(-
OPERATING DAT(t REPORT t
DOCKET NO. 050-0261 DAIE 02/24/04 COMPLETED BY H.
HAY NORRIS TELEPHONE (803)303--4524 OPERATING STATUS
- 1. UMIT NAME: RODIUSud UNIT 2 l NOTLS There are presently 157 I
- 2. REP.ORTING PERIOD: JANUARY 04 l Spent Fuel Assemblies in the I
- 3. LICEt1 SED THERMAL POWER (MWT) 2300 i Spent Fuel Pool.
I 4.
NAMEPLATE RATING (GROSS MWE) 73'/. O l
- 5. DESIGN ELECTRICAL RATING (NET MWE) 700.0 I
I 6.
MAX DEPENDADLE CAPACITY (GROSS MUE) 700.0 I i
- 7. MAX DEPEilDAULE CAPACITY (NET MUE) 665.0
~ ~ - - - - - - - - - - - - - - - - - - --
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
No Change 9
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MUE) 1955 MWt reactor power
- 10. REASONS FOR RESTRICTION IF ANY:
Although the Unit is not restricted by any outside agency, the power level is presently reduced due to Steam Generator considerations.
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 744.00 iidi90.00
- 12. NUMBER OF HOURS REAC10R CRITICAL 616.07 616.07 04197.30
- 13. REACTOR. RESERVE SHUTDOWN HRS 38.93 38.93 1830.32 14.' HOURf GENERATOR ON LltlE 615.70 615.78 82065.95
- 15. UNIT RESERVE' SHUTDOWN ll0URS
.00
.00 23.20 16.' GROSS THERHAL ENERGY GEN. (MWH) 7030(PL 20 703895.20 162875234.i6
- 17. GROSS ELEC. ENERGY GEN. (MWH) 246010.00 246010.00 3 234 4 B'76. 00
- 10. NET ELEC. ENERGY GENERATED (MUH) 224279.00 224279.00 49443903.00
- 19. UNIT SERVICE FACTOR
'6N. 77 -
82.77 72.50
- 20. UNIT AVAILADILITY FACTOR 82.I7 02.77 7? 52
- 22. UNIT CAP. FACTOR (USING DEM-dET) 43.06 43.06 62.40
- 23. UNIT FORCED UUTAGE RATE i7 23 17.23 14.55 24.-SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S TART UP 1-17-85
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORCAST ACHEIVED INITIAL CRITICALITY
- 1NITIAL ELECTRICITY i
COMMERCIAL OPERATION j
N
\\
\\
N
- e.. rs - 4 n
P;g2 3 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0261 UNIT NAME H.
B.
Rob inson DATE 840707 COMPLETED BY.4.
E. Scott REPORT MONTil January TELEPilONE 831-181-4574 h
.5 E '
3.
' Licensee
,E t, 8."],
Cause & Currective No. -
Date g
3m
(
_g g 5 Event s?
Action to c$ $
c2 3 dj y Report *
<N 0
$U Prevent Recurrence H
e-o 3O G
6 01-01 840101 S
0 A
4 HB HTEXCH Power reduction to approximately 80% due to Steam Generator consid-erations.
01-02
'840126 F
128.22 E
1 83-28 CJ -
HTEXCH Unit removed from service due to primary-secondary leakage in "A"
^
Steam Generator. Thia outage will
~
also include the Refueling and Steam Generator Replacement.
.N I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Etiuipmen! Failure (Explain) 1 Maaual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event ReporI (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination
_. jp F-Administ rative 5
sJ G-Operational Error (Explain)
Exhibit I - Same Source 07/77) ll-Other (Explain)
g.y xe
^*
Cp&L Carolina Power & Light Company H. B. ROBINSON STEAM ELECTP.IC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA ' 29550 MAR 2 1994 Robinson File No:
15505 Serial:
RSEP/84-177 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement.
1U. S. Nuclear Regulatory Commission Washington, D. C.
20555 H. - B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2' DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear.Mr. DeYoung:
- .Due to our inadvertently omitting Appendix B, Average Daily Power Level, from the
' January Monthly Operations Report, Carolina Power and Light Company herewith
.re-submits our. Monthly Operations Report in its entirety for the month of January,
_l'
~ 1984, in accordance with Technical Specification 6.9.1.c for' the H. B. Robinson 4 Steam Electric Plant, Unit No. 2.-
We have also revised the scheduled startup date from the current Steam Generator Replacement Outage to January 17, 1985.
This report ~
Laupersedes the previous Monthly Operations Report dated February 14, 1984.
If you have any questions regarding this matter, please advise.
Ve ry truly. yours,
(gy U
,j R. E. Mergan General Manager H. B. Robinson SEG Plant FMG/ac z
Enclosure f
G i\\