ML20087A540

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1984
ML20087A540
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/31/1984
From: Morgan R, Norris H, Scott A
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RSEP-84-177, NUDOCS 8403080135
Download: ML20087A540 (4)


Text

f Enc 12:ura to S; rials RSEP/84-177 -

' Pc g2 1 cf 3 g

APPENDIX U AVERAGE DAILY POWER LEVr, DOCKET NO. 050-0261 s'

UNIT RODINSON 11 NIT 2 s

DATE C2/24/H4 -

COMPLETEls BY H. RAY NORRIS TELEPl.ONE (803)383-4524 -

/ANUARY 1984 ' ~ -

LAY AVG. DAlt,Y POWER LEVEL' DAY MG. DAILY POWER LEVEL (fiWE-NET; (tiWE-NET) i 302 17 369 2 363 , iP 369 3 364 19 367 4 364 -

20 369 5 364 of 370 4

6 365 ..

22 360 7 265. 23 369 8 366 24 369 9 366 25 369 I

10 367 26 221 l

i1 366 27 -25 l 1

02 366 20 -- i 7

,13 360 29 -G 04 366 30 -8

)

1 15 368 ^

31 s ~5 1 l

b9

'm I

l

\

i s

O . ' .

t 84'03080135 840131 PDR R

ADOCK 05000219 pg

'.x -

-__-- _--_ _---__-- - _ - - - - - - - - - ~ _ - - - - - - - - _ - -

y <}

Pcg2 2 cf 3 '

7 .o .* ,-

(-

OPERATING DAT(t REPORT t

DOCKET NO. 050-0261 DAIE 02/24/04 COMPLETED BY H. HAY NORRIS TELEPHONE (803)303--4524 OPERATING STATUS

1. UMIT NAME: RODIUSud UNIT 2 l NOTLS There are presently 157 I
2. REP.ORTING PERIOD: JANUARY 04 l Spent Fuel Assemblies in the I
3. LICEt1 SED THERMAL POWER (MWT) 2300 i Spent Fuel Pool. I
4. NAMEPLATE RATING (GROSS MWE) 73'/ . O  ! l
5. DESIGN ELECTRICAL RATING (NET MWE) 700.0 I I
6. MAX DEPENDADLE CAPACITY (GROSS MUE) 700.0 I i
7. MAX DEPEilDAULE CAPACITY (NET MUE) 665.0 ~ ~ - - - - - - - - - - - - - - - - - - --
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

No Change 9 POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MUE) 1955 MWt reactor power

10. REASONS FOR RESTRICTION IF ANY: Although the Unit is not restricted by any outside agency, the power level is presently reduced due to Steam Generator considerations.

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 744.00 iidi90.00
12. NUMBER OF HOURS REAC10R CRITICAL 616.07 616.07 04197.30
13. REACTOR. RESERVE SHUTDOWN HRS 38.93 38.93 1830.32 14.' HOURf GENERATOR ON LltlE 615.70 615.78 82065.95
15. UNIT RESERVE' SHUTDOWN ll0URS .00 .00 23.20 16.' GROSS THERHAL ENERGY GEN. (MWH) 7030(PL 20 703895.20 162875234.i6
17. GROSS ELEC. ENERGY GEN. (MWH) 246010.00 246010.00 3 234 4 B'76. 00
10. NET ELEC. ENERGY GENERATED (MUH) 224279.00 224279.00 49443903.00
19. UNIT SERVICE FACTOR ,

'6N . 77 - 82.77 72.50

20. UNIT AVAILADILITY FACTOR 82.I7 02.77 7? 52
21. UNIT CAP. FACTOR (USING MDC NET) 45.33 45.33 65.69
22. UNIT CAP. FACTOR (USING DEM-dET) 43.06 43.06 62.40
23. UNIT FORCED UUTAGE RATE i7 23 17.23 14.55 24.-SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF S TART UP 1-17-85
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) FORCAST ACHEIVED INITIAL CRITICALITY ,
1NITIAL ELECTRICITY - - - - - - - - - - - - -

i COMMERCIAL OPERATION j - -- - - - - -- -

N

\

\N ,

n e. . rs - 4

P;g2 3 of 3 .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0261 '

  • UNIT NAME H. B. Rob inson DATE 840707 REPORT MONTil January COMPLETED BY .4. E. Scott

- TELEPilONE 831-181-4574

-, .5 E ' 3. $ ' Licensee ,E t, h Cause & Currective No. - Date H

g 3m ( _g g 5 Event s? 8."], Action to c$ $ c2 3 dj y e-Report * <N 0 $U o

Prevent Recurrence 3

O G

6 01-01 840101 S 0 A 4 HB HTEXCH Power reduction to approximately 80% due to Steam Generator consid-erations.

01-02 '840126 F 128.22 E 1 83-28 CJ - HTEXCH Unit removed from service due to

  • primary-secondary leakage in "A" ^

Steam Generator. Thia outage will

~

also include the Refueling and Steam Generator Replacement.

.N I 2 3 4

  • F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Etiuipmen! Failure (Explain) 1 Maaual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling , 3-Automatic Scram. Event ReporI (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination ,

_. jp F-Administ rative 5 sJ

. G-Operational Error (Explain) Exhibit I - Same Source 07/77) ll-Other (Explain) -

g.y xe

^*

Cp&L Carolina Power & Light Company H. B. ROBINSON STEAM ELECTP.IC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA ' 29550 MAR 2 1994 Robinson File No: 15505 Serial: RSEP/84-177 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement.

1U. S. Nuclear Regulatory Commission Washington, D. C. 20555 H. - B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2' DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear.Mr. DeYoung:

.Due to our inadvertently omitting Appendix B, Average Daily Power Level, from the

' January Monthly Operations Report, Carolina Power and Light Company herewith

.re-submits our. Monthly Operations Report in its entirety for the month of January,

_l' ~ 1984, in accordance with Technical Specification 6.9.1.c for' the H. B. Robinson 4 Steam Electric Plant, Unit No. 2.- We have also revised the scheduled startup date from the current Steam Generator Replacement Outage to January 17, 1985. This report ~

Laupersedes the previous Monthly Operations Report dated February 14, 1984.

If you have any questions regarding this matter, please advise.

Ve ry truly. yours ,

(gy U

,j R. E. Mergan General Manager H. B. Robinson SEG Plant FMG/ac z

Enclosure f

G i\