Monthly Operating Rept for Feb 1986
ML20137Y263
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/28/1986
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RNPD-86-958, NUDOCS 8603120229
Download: ML20137Y263 (5)


Text

. _ _.

Encicw ra to S;ricl: RNPD/86-958 diagt etgf 3 PLANT PERFORMANCE DAIA SYSIEM PAGE 1

l RUN DATE 03/05/86 OPERATING DATA REPORT RPD36 RUN TIME 09:27: 18 RODINSON UNIT 2 DOCKET NO. 050-0?61 COMPl.ETED 10 A.

E.

SCOTl OPERATING STATUS TEl.EPHONE (003)303-4524

_ _. _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _. ~. _.. _ _

i. UNIT NAME: ROBINSON UNIT 2 i N0iLS
  • There are presently 298 1 2.

REPORTING PERIOD: FEBRUARY 86 I Fuel Assemblics in the Spent Fuel l 3.

LICENSED THERMAL POtJER (MWT) 2300 l Pool.

l 4.' NAMEPLATE RATING (GROSS tiWE) 739.0 l

l S.

DESIGN ELECTRICAL RATING (tJE T MWE) 700.0 I

l 6.

MAX DEPENDADLE CAPACITY (GROSS tiWE) 700.0 l I

7.

MAX DEPENDADLE CAPACITY (NET MUE) 665.0 8.

IF CHANGES OCCUR IN CAPACI1Y RATINGS (lTEMS 3 iHRU 7) S it1C E LAST REPOR1.

GIVE REASONS:

9 POWER LEVEL TO WHICH RLSTRICIED IF ANY (NEi ttW E )

None

10. REASONS FOR RESTRICTION IF AN)

None TilIn YR in ClltiUt (10N ill DAIE ATIVE ii. HOURS IN REPORTING PERIOD 6/2.00 1416.00 131406.00

12. NUMBER OF HOURS REACTOR CR I11C Al

.00 567.40 92624.4?

13. REACTOR RESERVE SituTDOWN IIRS

.00 154.')2 2965.19

14. HOURS GENERATOR ON LINE

.00 563.16 90331.06

15. UNIT RESERVE SHUTDOWN HOURS

.00

.00 23.20

16. GROSS THERMAL ENERGY GErl. ( tiW H )

.00 9  ? "> Y 7. 4 4 100441'i66 i6

17. GROSS ELEC. ENERGY GEN. (MWH)

.00 3104?.00

  • iGi//0Y3.00
10. NET ELEC. ENERGY GEt1ERATED (MWH)

-156".00

? Y 6 ? O'.i. 0 0 5494566Y 00 i '7. UNIT 9ERVICE FACIOR

.00 59.//

60./4

20. UNIT AVAILADILITY FACTUR

.00 3Y.71 60.76

21. UfJIT CAP. FACTOR (USING MDC IJE T)

. 55 31.46 6?.00

22. UNIT CAP. FACTOR ( U S ItJG DER t1LI)

.33 29.00

'> Y. '/ 3

23. UNIT FORCED OUTAGE RATE

.00 24.31 14.00

24. SHUTDOWNS SCHED. OVE R NEXT 6 tion 1HS (1YPE. DA10, AND DURollON OF l' ACH )

None

25. IF SilOTDOWN Al FND or REPORT PERIOU, E blIMATF D DATE Of S Tif? 1 UP- 03 17 86 l
26. UNITS IN TEST STATUS (PPIOR TO COMMLRCIAL OPERATION)

I URL,nU T ACHEIVED IN11 I AI CRITICALITY

~~

~~

INITIAL EILCTRICIIY C O M riE R C I A l.

OPERATIGN

  • Core re-load in progress 1.16 - 9 9403120229 960229

'{ E_ i

DR ADOCM 05000261 PDR

\\

i

P p3@ (f 3 9

0 ptng; pgggggnnggg 94 ; n g y t, i t. h eat L n

RUN DATE 03/05/06 APPENDIX tt - AVER AGE DAll.Y P0uC I< l 1; vel.

14PD39 RUN T ItiE 09:27:14 R0filtJG0tl UNI T 2 DOCKEI tJ 0. OSO 0?61 COMPLETED I<Y A.

F.

SCOT 1 lll f Pilutif ( 8 0 3 ) 3 0 3 - 4 *.> ? 4 FEBRUARY t906 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL-(MWE-NET)

(MUE -NE T )

1

-2 17

-?

2

-5 10

-3 3

-. 4 g9

.- 2 4

-4 20

-2 5

-3 21

-- J 6

-2 22

-2 7

-2

?3

-J 0

-3 24

-2 9

-3 25

-1 10 3

2o 1

it

-3 27

?

12

-3

'!O 2

j 13 1

l 14 f>

i 15

-?

16

-3 F

1 i

i I

l l

l l

1.14 - H

e DOCKET NO. 050-0261 gy $ggggg gg pg gm UIWT NASSE H -

B-R nh i n st a n e

DATE Q1-04-8 6 CotetITED SY An i e n F_

Mrntt REPORT MONTit Fe b ru a ry TELEP900NE (803) 383-4524 t

!?

3 E(*

LAensee

[1 h%

Cause & Currettise Ihte h

3=

j jg5 Ewn,

37 s.?

A6: son to 5

4 3 5, =s Repuss z

r. L Eb Present Recurrence 2

v 6

ZZ ZZZZZZ A reactor trip occurred on 0201 860201 2

672 C

4 01-28-86, due to a blown under voltage fuse on Emergency Bus No.

2.

The fuse'was re-placed.

The unit remained in the shutdown mode and began the planned Retueling Outage on 02-01-86.

I 2

3 4

f F =.eJ Reum.

Method:

Exhiba G-Instructams 5 S,hed Jed A Eqapment Fu:ureiEsplain) 1 mnual for Prepararson of Data B-Winterunee og Test 2-Wnual Scrain Entry Sheets for txensee C-Refochng 3-Automata: Strun.

Esent Repost (LE R) Fde INUREG-n D Regu!4 ton Ress:At w 40ther (E splaar) 0101) 1 Operato: Tram 4ng A LAenw I mansnation T.

F-ununastraroc 5

~

GOperarumat t a w Eipiam)

E dubin I - Sanie S wrce rt 77)

II Other a E y44m) r.

it C

e

r __ _ _ _ _ _ _ _ -_

Page 1 of 1 RESPONSE INPUT VERIFICATION FORM Document Identification:

Document

Subject:

Monthly Operationn Report Outgoing Letter Number /Date The accuracy of the information provided in the subject correspondence was verified by the following method (s):

(Initial the appropriate method (s))

P;eMrer Reviewer 1.

Personal knowledge of subject / project kh LlQL\\

2.

Input obtained from others List sources:

Tim Clenry - Perfnmance (Noted Name/ Subunit Max Marquick - Planning & Scheduling (#24 & #25)

QQ Name/ Subunit Wase/ Subunit 3.

Review of plant technical documents List documents N/A 4.

Verified by field observations Discuss extent:

5.

Other M

Describe Dave Codner - Outnce Report I attest that the information contained in the subject correspondence is accurate to the best of my stility-and knowledge:

Data b 3 do h Preparer IN[

I Group Pe r f o rman c e 3

Anita E. Scott N

Reviewer 4 MM Mbr 1X Group Perfnrmnnee Date 3 If V/p

11. kayGJor an

(/ _f/

Approved:

/

c. %-

Date 1

Subunit Supervisor R.11. Chambern

Cp&L Carohna Power & Light Company a-ememmannemannes:ogstsman l

ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 MAR 0 71996 I

l Robinson File:

15505 Serials RNPD/86-958 1

i I

l l

Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission i

Washington, D. C.

20555 ROBINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 COCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT Dear Mr. Taylor In accordance with Technical Specifications 6.9.1.c for the !!. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February, 1986.

Very truly yours, R. E. Morgan General Manager

11. B. Robinson S. E. Plant AESt/ac Enclosure cci R. A. Hartfleid (2)