Encl'osure to Serial: RNPD/85-3472 Page 1 of 4 CPAL CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 10/07/05 OPERATING DATA REPORT RPD36 RUN TIME 15;i8:06 ROBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY A.
E.
SCOTT OPERATING STATUS TELEPHONE (803)383-4524
- i. UNIT NAME: ROBINSON UNIT 2 i NOIES There are presently 222 l
2.
REPORTING PERIOD: SEPTEMBER 85 i
Fuel Asscsublies in the Spent i
3.
LICENSED THERMAL POWER (MWT) 2300 l
Fuel Pool.
I 4.
NAMEPLATE RATING (GROSS MWE) 739.0 l
l S.
- b. SIGN ELECTRICAL RATING (NET MWE) 700.0 i
i 6.
haX DEPENDABLE CAPACITY (GROSS MWE) 700.0 I i
7.
MAX DEPENDABLE CAPACITY (NET MWE) 665.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) 92%
- 10. REASONS FOR RESTRICTION IF ANY: Core Peaking Factor limitations.
(EUI')
THIS YR TO CUMUL MONTH DATE ATIVE 1i. HOURS IN REPORTING PERIOD 720.00 6551.00 12778t.00
- 12. NUtiDER OF HOURS REACTUR CRITICAL 687.97 5650.72 89048.02 il. REACTOR RESERVE SHUTDOWN HRS 32.03 873.60 2810.67
- 14. HOURS GENERATOR ON LINE 669.80 5507.48 87573.43
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1452278.88 11957539.92 174832774.08
- 17. GROSS ELEU. ENERI,Y
(, L N. (MWH) 4/9020.00 3920257.00 56265133.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 454978.00 37202i2.00 53129873.00
- 19. UNIT SERVICE FACTOR 93.03 84.07 68.53
- 20. UNIT AVAILADTLITY FACTOR 93.03 04.07 60.55
- 22. UNIT CAP. FACTUR (USING DER NET) 90.27 81.13 59.40
- 23. UNIT FORCED OUTAGE RATE 6.97 13.18 15.04
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
Refueling Outage beginning February 01, 1986 for 49 days.
l
- 25. IF SHUlDOWN AT END OF REPORT PERIOD, ESTIMAlED DATE OF SIART UP
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FCRCAST ACHEIVED IN11IAL CRITICALITY INITIAL ELECTRICITY CuritiERCI AL OPER A TION gOIB0242851009 R
ADOCK 05000gs3 PDR i.16 -9 l
Page 2 of 4 CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 10/07/85 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TIME 15:17:59 ROBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY A.
E.
SCOTT TELEPHONE (803)303-4524 GEPTEMBER 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MUE-NET)
(MUE-NET) 1 719 17 302 2
719 18 270 3
715 19 456 4
711 20 724 l
5 696 21 727 6
697 22 729 7
690 23 730 8
6Y5 24
/31 9
697 25 729 10
/0Y 26
/31 11 656 27 731 12
-21 28 732 13 129 29 665 14 692 30 662 15
/26 16 730 1.16 - 8
Page 3 of 4 050-0261 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H. B. Pobinson DATE 10-01-85 COMPLETED BY Anita E. Scott REPORT MONTil September TELEPHONE 803-383-4524
-c 5g 3
- $5 Licensee
[g l%
Cause & Corrective No.
Date g
3g i
,s s &
Event g7 e-?
Action to
}L Prevent Recurrence H
j=
jg Reporiu mV 6
0901 850911 F
37.63 11 3
AB TPANSF Water fran Deluge System inadvertent-ly actuated "C" Main Transfonner fault pressure signal causing the Pcactor to trip. Unit was brought back on line and returned to full power.
0902 850917 F
12.58 A
3 EB INSTRU Reactor tripped due to a high voltage spike on instrument Buss #2.
Peactor was returned to full power.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A Equiprnent Failure (Explain) 1 Manual for Preparation of Data B-Mainte.1ance of Test 2-Manual Scrarn.
Entr> Sheets for Licensee C-Refueling 3-Autonutic Scrain.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Adnunistrative 5
G-Operational Erior (Explain)
Exhibit I Same Source 01/77)
Il-Other (Explain)
..