Monthly Operating Rept for Jan 1984
ML20086N006
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/31/1984
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RSEP-84-124, NUDOCS 8402170178
Download: ML20086N006 (3)


Text

'

,Enclosura to RSEP/84-124 .

Pcg2 1 cf 2 4

OPERATING DATA REPORT DOCKET NO. 050-0261 DATC 02/10/84 COMPLETED BY H. RAY.NORRIS TELEPHONE (803)383-4524 OPERATING STATUS

1. UNIT NAME: . ROBINSON UNIT 2 i NOTES There are presently 157 l
2. REPORTING PERIOD: JANUARY 84 l SP ent Fuel Assemblies in the j
3. LICENSED THERMAL POWER (MWT). 2300. I S P ent Fuel Pool. l
4. NAMEPLATE RATING (GROSS MWE)- 739.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 700.0 'l i
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 '1 1

~ 7. MAX DEPENDABLE CAPACITY'(NET MWE) 665.0. - - - - - - - - - - - - - - - - - - - - - - - - -

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCF LAST REPORT, GIVE REASONS: '

No Change 9.' POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 1955 MWt reactor power

10. REASONS FOR RESTRICTION IF ANY: Although the Unit is not restricted by any outside agency, the power level is presently reduced due . to Steam Generator considerations.

THIS -

YR TO 'CUMUL MONTH DATE' ATIVE .

1i. HOURS IN REPORTING PERIOD 744.00 744.00 i13190.00

12. NUMBER OF HOURS REACTOR CRITICAL 616.07 616.07. 84197.30
13. REACTOR RESERVE SHUTDOWN. HRS 38.93 38.93 1830.32
14. HOURS GENERATOR ON LINE 615.78' 615.78 82065.95

.15. UNIT RESERVE SHUTDOWN HOURS .00 .00 23.20

16. GROSS THERMAL ENERGY GEN. (MWH) 783895.20- 783895.20 162875234.i6
17. GROSS ELEC. ENERGY GEN. (i:WH) 246010.00 246010.00 52344876.00
18. NET ELEC. ENERGY GENERATED (MWH) '224279.00 224279.00 49443903200
19. UNIT SERVICE FACTOR- 82.77 .82.77 72.50
20. UNIT AVAILADILITY FACTOR .

82.77 82.77 72.52-

21. UNIT CAP. FACTOR'(USING MDC' NET) 45.33- 45.33 65.69
22. UNIT C*AP. FACTOR.(USING DER NET) 43.06 43.06- 62.40-
23. UNIT FORCED OUTAGE RATE .17.23 17.23- 14.55 l24. SHUTDOWNS SCHED.: DVER NEXT 6~ MONTHS (TYPE, DATE,-AND_' DURATION OF EACH): ,

.2 ';, . IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE-OF' START UP: 10-25 262 UNITS IN TEST STATUS-(PRIORDTO COMf1ERCIAL OPERATION)- FORCAST ACHEIVED INITIAL CRITICALITY -------- ------~~

. INITIAL ELECTRICITY ----- " -------

f COMMERCIAL OPERATION - - - - -


1 I .

217o17. 4o131 PDR ADOCK 05000261

-R ' PM ,,

. a_ -__ .. - -- _ i .16 -'- 19._ - _ -

=___ - -_

P ga 2 ef 2 ,

DOCKET NO.

050-0261 UNIT 5!!UTDOWNS AND POWER REDUCrlONS H. B. Robinson UNIT NAM E DATE _840202 COMPLETED BY A. E. Scott I REPORT MONTli r e .s.. e '

TELEPilONE 803-383-4524 "t

-, .! ? 3 Y Licensee ,E t, o Cause & Corrective No- Date o- ~g s .g 5 5 Event g'g gO'8 At tion.t o H

fE $ ~w;p, e e.

Report a mO v

o Prevent Recurreace R

6 01-01 840101 S' .0 A 4 IIB HTEXCH Power reduction to approximately 80%

due to Steam Generator considerations.

01-02 840126 F 128.22 B 1 83-28 CJ HTEXCH Unit removed from service due'to primary-secondary leakage in "A" Steam Generator. This outage will also include the Refueling and Steam Generato'r Replaceaent. At start of current outage, 1-26-84, the nuclear operating plan projected S/G replacement outage for 39 weeks.

i 2 3 4 F: Forced Reason: Method: Exhibit G-Instructipns S: Scheduled A Equipment Failure (Explain) l-Manual for Preparation of Data '

H Maintenance or Test 2-Man ual Scrain. Entry Sheets f or 1.icensee C-Refueling 3 Automatic Scram. Event Report (1.1:R) File iNilRI.G.

D. Regulatory Resti?ction 4-Other ( Explain) 0161i E-Operator Trainin; & License lixamination F.Adminisi: iive 5 G-Operational Error (Explain) Exhibit I Same Source (9/77) II-Ot,her (Explain) ,

l 6

CD&L Carolina Pcwer & Light Company H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE B0X 790 HARTSVILLE, SOUTH CAROLINA 29550 FEB141984 Robinson File No: 15505 Serial: RSEP/84-124 Mr. Richard C. DeYoung, Director Office of Inspeetion & Enforeement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATICNS REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of January, 1984.

Very truly yours,

&j W R. E. Morgan General Manager H. B. Robinson SEG Plant AES/ac Enclosure  !