ML20097C795

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1984
ML20097C795
Person / Time
Site: Robinson 
Issue date: 08/31/1984
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8409170267
Download: ML20097C795 (4)


Text

%;', ' g

~

~

~~

o

[(

3Enclosurito S disltt(RSEP/84-556 c

LP;gn 1:off3:

LOPERATING DATA REPORT DOCKET NO.

LDATE

.050-0261-09/04/84-COMPLETED BY A.-E.

SCOTT TELEPHONE- (803)383-4524 OPERATING: STATUS (1.-UNITHNAMEi ROBINSON UNIT 2

l. NOTES-

-l:

.2a REPORTING _ PERIOD: AUGUST

~8 4

-1 1

fl.There are presently 379 Fuel 131 LICENSED'THERMALLPOWER'(MWT) 2300 4i NAMEPLATE RATINGL(GROSS MWE):.739.0

-l Assemblies in the Spent Fuel Pool.qg Si: DESIGN ELECTRICAL RATING-(NET MWE) 70010 l

l-64 ~ MAX. DEPENDABLE CAPACITY (GROSS.MWE): 1700.0:l l-

7. MAX DEPENDABLE CAPACITY-(NET.MWE). ~665.0

.8.

IF--CHANGES OCCUR IN CAPACITY RATINGS-(ITEMS 3 THRU 7) SINCE LAST REPORT,

~

LGIVE-REASONS:

?

9.-POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE).-

None 10.-. REASONS FOR RESTRICTION IF~ANY: N/A-THIS YR TO-CUMUL MONTH-DATE ATIVE-t 1i." HOURS IN REPORTING PERIOD 744.00

'5855.00 118301.00-12 =, NUMBER OF HOURS REACTOR CRITICAL

.00 616.07 84197.30

13. RtiACTOR RESERVE SHUTDOWN HRS

.00

~38.93 1830.32 14.. HOURS GENERATOR'ON LINE

.00 615.70 82065.95 4

15.' UNIT RESERVE SHUTDOWN HOURS

.00

.00 23.20

16. GROSS THERMAL' ENERGY GEN.-(HWH)

.00 783895.20 162875234;1'6 17., GROSS -ELEC. ENERGY GEN. (MWH)*

.00 246010.00 52344876iOO

18. NET ELEC. ENERGY GENERATED (MWH)-

-1648.00 210313.00 49429937.00-

19. UNIT SERVICE FACTOR

.00 10.52,

69.37 20.' UNIT-AVAILABILITY FACTOR

.00 10.52 69.39

21. UNIT CAP. FACTOR (USING MDC NET)

.33 5.40 62.83

22. UNIT CAP. FACTOR (USING DER NET)

.32 5.13 59.69 23.' UNIT FORCED OUTAGE RATE

.00 57.24

'15.17 24.- SHU"CWNS SCHED. ' 0VER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) i

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 10-25-84
26. UNITS.IN TEST STATUS (PRIOR TO. COMMERCIAL OPERATION)

FORCAST ACHEIVED

' INITIAL CRITICALITY INITIAL ELECTRICI1Y

~

COMMERCIAL OPERATION

--2--

1 Q g LY 8409170267 840831 1^16 - 9 PDR ADOCK 05000261 l

R PDR e

a

,z s

'Pcg; 2 of 3 APPENDIX B AVERAGE DAILY POWEFd LEVEL DOCKET NO. 050-0261 UNIT ROBINSON UNIT 2 DATE 09/04/94 COMPLETED BY~A.

E.

SCOTT TELEPHONE (803)303-4524 kUGUST 1984 1

SAY-:

AVG. DAILY POWER LEVEL DAY

' AVG. DAILY POWER LEVEL

-(MWE-NET)

(MWE-NET) 1

-2 17

-2 2

-2 18

-2~

'3

-2 i9

-2 4

-2 20'

-2 S

-2 2i

-2 6

-2

.22

-2 7

-2 23 2

8

-2 24

-2 9

-2 25

-2 10

-2 26

-2 11

-2 2'7

-2

.12

-2 20

-3

.13

-3 29

-3 14

-3 30

-4 15

-3 31

-4 16

-2 e

9 1.16 - 8

g -

.y

_v s

+

,j Pega 3 of 3

=

4 UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0261 UNIT NAME H.B. Robinson DATE 840904 REPORT MONTil AUGUST COMPLETED BY A_ E.

Scott TELErtlONE 803-383-4524 4

e,

.$'E

}

,E Licensee P,

t Cause & Cbtrective j

No.

Daic g

3g jg5 Event g?

o. 3 Action to

[U

$E 5

j 15 y Report #

mO H

Prevent Recurrence b

q 0801 840801 S

744 C

1 CJ HTEXCH Continuation of Refueling and Steam Generator Replacement Outage.

2 1

GD i

i.

CT l 1

2 3

4

. F: Forced Reason:

Method:

Exhibit G Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of. Test 2 Manual Scrarn.

Entry Sheets for Licensee C Refueling 3-Automatic Scram.

Event ReporI (LL R) File INUREG.

D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Exaniination 2

i F-Administrative 5

G-Operational ErrJr (Explain)

Exhibit I Same Source 19/77) 11-01her (Explain) r

..~0

.3 CD&L Carolina Power & Light Company H. B PLANT POST OFFICE BOX 790

.HARTSVILLE, SOUTH CAROLINA 29550 SEP 7 1984 Robinson File No.:

15505 Serial: RSEP/84-556 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement' U. S. Nuclear Regulatory Commission Washington, D. C.

20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. DeYoung:

In acccrdance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of August, 1984.

Very truly yours, N

g.

[GeneralManager R. E.

organ H. B. Robinson SEG Plant AES/wp Enclosure cc:

R. A. Hartfield (2)

J. P. O'Reilly (1)

, r, i

...,