Monthly Operating Rept for Oct 1985
ML20136A712
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/31/1985
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
KNPD-85-4063, NUDOCS 8511200012
Download: ML20136A712 (13)


Text

~

Enclosure to Serial: RNPD/85-4063 Page 1 of 12 CP&L CO PLANT PERFORMANCE DATA SYSILh PAGE  ;

RUN DATE ii/00/85 OPERATING DATA R&dRT RPD36 RUN TIME- i4;42:51 RODINSON UNIT J DUCKET NO. 090-O'.'61 t;Ohi'l Li. l L D fn A. E. SCOTT OfERATING STATUS -

TEihiHUNF ( OO 3 ) 3H 3 4'; 21

i. UNIT NAME: RODINSON' UNIT 2 1 NulE. I
2. REPORTING PERIUD- OCTOBER G5 i There are presently 222 Fuel I
3. LICENSED IHERMAL POWER (t1WT; 2300 i Assemblies in the Spent Fuel 1
4. NAMEPLATE RATING (GROSG MUE) 739.0 l Pool. I
3. DESIGN ELECTRICAL RATING (NET MWE) 70G.0 1  ;
6. MAX DEPENDABLF CAPACITY (GROSL NWE) 700.0 1 1 7 MAX DEFENDABLE CAPACITY (NET MWE) 665.0 -- --- - -- - -----

'1

. IF CHANGES OCCUR IN CAPACI!Y hATINGS (ITEMS 3 THRU 7) SINCE L AST REPORf.

.GIVE REASONS:

7. POWEM LEVEL TO WHICH RESTRICTED 1F ANY (NET MWE) Variable
10. REAGONG FOR RES7RICIICH IF ANY: Core power level restricted by approximately 3% due to core peaking factor (FQT).

THIS YR la CUnUL MUNIH DATE ATIVe it. HOURS IN REPORTING PERIOD 743.00 ."."? 6 . 0 0 120S26. N

12. NUMDEh'OF HOUas REACTOR CRITICAL 745.00 6395./2 YOSY3.02
13. REACTOR RESLRVE SHUTDOWN liRS .00 G73.60 2010.67
14. HOU 4S GENERA 10R ON LINE 730.47 62 7.YS 80303.90
15. UNIT RESERVE GHUTDOWN HOUR'i .00 .00 23.20
16. GRODU THERMAL. ENERGY GEN. (MWH) iS34?35.36 13404519.60 176279753.76
17. GROM ELEC. ENERGY GEN. (MWH) 513042.00 4434097.00 567?h?',00
10. NEi' ELEC. ENERGY GENERATED (hWH) 400,'03.00 '4200995.00 53610656.00
19. UNIT CERVICE FACTOR 90.05 85.S0 60.71
20. UNIT /VAILAbItiTY FACTUR 90.05 05.50 60.7?
21. UNIT CAP. FACTOR (USING MDC NET) 70.66 06.75 62.73
22. UNIT CAP. FACiOR (USING DER N!:T) 73.73 02.41 59.60
23. UhIT FORCED OUTAGE RATE .00 11.02 14.94
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS trYPE, DATE, AND DURATION GF EACH)

Refueling Outage beginning February 01, 1986 for 49 days.

25. IF UHUTDOWN Al END OF REPORT PERIOD, EGTIriATED DATE OF GIART UP
26. UNITS IN TEGI STATUS (PRIOR TO COMMERCIAL OPLRAflCN> FORCASI ACHEIVED I-~ RIAL CRITICALITY - -- - --

INITIAL ELEC1HICI1Y - - - - - - - - - - - - .

COMMERCIAL OPERAT1:UN - - - -- - - - -

[ 3,36 _ v'

\

  • Page 2 of 12 CP&L CO PLANI P ER F ORtt At4 C E L' ' ~ A S (Olt M PALE i RUN DATE 11/08/85 Af" *L N DI X F4 - AVERAGE DAIL, i'dWLR LEVEL Ri W RUN TIME 12:46:42 R0131NSON UN11 '

DUCAL; NO. 050 v':a ; .

COMf LE 11-:D 1:1 6. . OCC.I 1 !: L Ei'HU N E < i) 30.!- W 4 OCTOBER 1905 DA' .%'G. DAILY POWER LLVEL D A'i AVL DAILY I'U W t . R LEYEL

( ME --NET ) (MUL NEf) i c63 '

. 6 B '.-

2 57b :G /G7 3 563 :V u86 4 645 20 6 8 ~,'

S 633 21 60'?

6 663 22 606 7  :> ib < 3 6CU G 6 13 ':' 4 69s 9 072 25 697 10 666 26 6?Y ti 674 'T/ 620

's i

  • s .*

b k f '

i4 646 30 'i04 1:2 673 di ?OS s

to 67:

~

i,16 - 3 '

I w

P ge 3 of 12 DOCKET NO.

050-0261 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME II. B. Robinson DATE 10/05/85 COMPLETED BY Anien E. S en t-t REPORT MONT11 October 803-383-4524 l TELEPHONE 1 e.

-  ! E jg 3 4U jsE Licensee g.t, get 9-?

Cause & Currective Action to No. Date i 3y 4 Event 33 f: 5 jg g( Report :: mV

}L Prevent Recurrence b

1001 851002 F - H 4 -

IA INSTRU While performing Operation Surveillanc 3 Test 005, a runback occurred. No cause could be found.

1002 851004 S - B 1 -

ZZ TURBIN Unit load reduced to nerform Turbine Valve Test. Upon completion, Unit returned to full load.

1003 851012 S -

B 1 -

CH HTEXCH Unit ramping down to hot Shutdown for repair of leaking S/G hand hold cover.

1004 851013 S 14.53 B 1 - Cil HTEXCH Unit shut down to hot Shutdown to repair leaking steam generator hand-hole cover seal. Seal was repaired, and unit startup commenced, a 2 3 4 F: Forced Reason: Method: Exlubit G . Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scrain. Entry Sheets for Licensee C Refueling 3-Automatic Scram. Event Repor ILER) FileINURLG-D-Regulatory Restricinni 4-Other iExplam) 01bl)

EOperator Training & lxense Examination F-Administrative 5 G-Operational Errur iExplain) Eshibit I Same Source 19/77) 110 her (Explain)

.o. o Page 4 of 12 CP&L CO PLANT PERFORtiANCE DATA SYSTEM PAGE 1 RUN DATE 1/07/85 OPERATING DA1A ?tPORT RF D A RUN TIME 09:40:05 ROBINGON U N I l 2 1

DOCLEI NU, 050 3261 COMPLETED DY A. E. SCOTT OPERATING STATUS TELEPHONE (SO3)dOF4524

i. UNIT NAME: ROBINSON UNIT 2 I NOTES I
f. REPORTING PERIOD. JANUARY 05 l There are presently 222  !
3. LICENSED THERMAL POWER (tiUT) 2300 i I Fuel Assemblies in the Spent Fuel
4. NAt1EPLATE RA IING (GROSS MWE) 737.0 g 1.
5. DESIGN ELECTRICAL RATING (NET tiUE ) 700.0 i .
6. MAX DEPENDABLE CAPACITY (GROB0 MUE) 700.0 l i
7. MAX DEPENDABLE CAPACI!Y (NET Mt4 E ) 665.0 - - - - - - - - - - - - - - - - - - - - -
9. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SlNCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH REsiRIC1ED IF ANY fNE1 MWE) NONE
10. REASONS FOR RESTRICTION IF ANY NONE THIS YR TO CUtiU!

MONTH DATE AIIVE

11. HOURS IN REPORTING PERIOD 744.00 744.00 121974.00
12. NuriBER OF HOURS REAClGR CRITICAL 23'.20 232.20 84429.50
13. REACTOR DESERVE SHUTDOWN HRS 40).12 405.12 2422.iY
14. HOURS GENERATOR ON LINE 130.60 130.60 02204.55
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 23.20
16. GROSS THERMAL ENERGY GEN. (MWH) 139451.76 137451.76
17. GROSS ELEC. ENERGY GEN. (MWH) 43240.00- 43240.00 163014605.72l 52380124.00 4
10. NET ELEC. ENERGY GENERATED ( tiU H i 32003.00 32003.00 49441744.00
19. UNIT SERVICE FACIOR 18.63 10.63 67.40
20. UNIT AVAILADILITY FACTOR 10.63 10.63 6 ~/ . 41
21. UNIT CAP. ' F AC10R (USING MDC NET) 6.48 6.40 60.93
22. UNIT CAP. FACTOR (USING DER NET) 6.16 6.16 57.71
23. UNIT FORCED OUTAGE RATE 74.16 '? 4 .16 15.49 24 S ;UTDOWNS SCHED. OVER NEXT 6 M0t1TUS (TYPE, DATE, AND DURATION OF EACH)

-NONE

25. IF CHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF START UP
26. UNITS IN TEST STATUS (PRIOR TO COMt1ERCIAL OPERATION) FORCAST ACHEIVED INITIAL CRITICALITY - - - - - - - - - - -

INITIAL ELECTRICITY - - --- - - - - - - -

l l COMMERCIAL OPERATIOt1 I~~---- -- I~ ~ ~ -

l i.i6 - 9

o Page 5 of 12 CP&L CD t'L NT I'iRF ORM ANCE DafA S Y F I E ri PAGE  ;

RUN DATE ii/07/85 #c_ RATING DATA RLiORT ': D :,0 RL!N f IIiE ii:36 J. 4 JOBINSON UN1i -

D U C .< E NO. OSv 02ni COMPLLiLD DY A. E. SCOTT OPERATING STAfUE I L L L P H O'4 E (U< 4 A 0 3 - 4 5 .' 4

1. UNIT NAhE: ROBINCON UNIT 2 i NOTES i
2. REPORTING TtR10D: FEDRUARY OS i i There are presently 222 Fuel
3. LIC' NSED THERMAL POWER (hWI) .2300 I ,

Assemblies in the Spent Fuel

4. NAriEPLATE RATING (GROSS MWL' J35.0 i I Pool.
5. DESIGN ELEC TRICAL R A11NG (NET (1WC ) 700.0 I i
6. (1AX DEPENDABLE CAPACITY (GRobS MWE) 700.0 I i
7. MAX DEFENDABLE CAPACITY (NET nWE) 665.0 --- - - - ~ - - - -- --

D. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEh3 3 IHRU 7) .h.h LAsi ret 01'l GIVE REAS0fiS:

9. POWER LEVEL TO WHICH RESTR.TCTED IF ANY (NET MWE) NONE
10. REASCNS FOR RESIRICTION IF ANY: NONE THIS YR TO CUMUL liONT H DA:E Als &

ti. liOURS IN REPOR11t1G PERIOD 672.00 1416.00 172646.00

12. NUMPLE OF HOURb REAC10R CRITICAL 421.65 M3.0L 0485i.i5
13. REACTOR RESERVE SiluTDOWN llRS 250.35 ?35.47 2672.54
14. H00im :,ENER A T OR ON LINC 413.37 5Si.Y7 02617.92
15. UNIT REbc.PVE SHUTDCUN ll0URS .00 .00 23.20
16. GROGa li;ERMAL ENERGY GEtJ. (MUH) 777578.56 919030.32 163794204.40
17. GROSS ELEC. ENERGY GEN. (HWH) 261158.00 304406.00 52649202.00
10. NET ELEC. ENERGY GENERATED (htH) 245V04.00 2?7987.00 496u /648.00 t9. UtJIT CERVICE FACTOP 61.51 38.'i'8 67.36
20. UNIT AVAILABILITY FACTOR 61.51 3 3.M : 67.30 21 UNIT CAP. FACTOR (UGING iiDC NET) 55.03 29.52 60.92
22. UNIT CAP. FACsDR (USING DER NET) 52.20 20.05 57.88
23. Urd i FORCED OUTAGE RATE 30.49 54.32 15.65
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, lia l E , AND DURAIION OF CACH)

NONE

25. IF SHUTLOWN AT END OF REPLRT PERIOD, ECTlinATED DATE Of- jfART UP
26. UNITG IN TEST STATUS (PRIOR TO COMMLRCIAL OPERATION): FORCAST ACHEIVED

~~ ~~

INIfIAL CRITICALITY - I-- -- I--

INITIAL El.E CT R I C I T 'T -- -- - --

~~~

COMMERCIAL OPERATION -.- - -- ~~E -

i '. i 6 Y

Page 6 of 12.

1 CP&L CD PLANT PERFORMANCE DATA SYSTEM PAGE i l RUN DATE 11/07/85 OPERATING DATA REPORi~ .4 D36 RUN TIME 11:37:40 ROBINSON UNIT 2 f,0 G K E 1 NU. 050-0261 C0hl'LEIED DY A. E. SCOII OPERATING STATUS T E! EPH0hE (003)303-4524

i. UNIT NAME: ROBINSUN UNIT 2 I NOIES i
2. REPORTING ?ERIOD: MARCH 05 i i There are presently 222 Fuel
3. LICENSED THERNAL F0WER (MUT) 2300 l Assemblies in the Spent Fuel l
4. nan [wlATE RATING (GROSS MWL1 ./ 39 . 0 l i Pool S. DESIGN ELECTRICAL RATING (NET MUE) 700.0 1 i
6. MAX DEPENDADLE CAPACITY (GROSS MUE) 700.0 1 1
7. MAX DEPENDADLE CAPACITY (NET tiWE) 665.0 -- - - - - - - - -- - - -
8. IF CHANGES OCCUR IN CAPACITi RATINGS (ITEriS 3 1HRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WilICH RESTRICTED IF ANY (NEf MWE ) . NONE
10. REASONS FOR RESTRICTION IF ANY: NONE THIS YR TO LUNUL MONTH DAFE ALIVE i1. HOURS IN REPORTING PERIOD 744.00 2160.00 1233YO.00
12. NUMBER OF iiOUR5 REACTOR CRITICAL 714.05 1367.90 0556S.20
13. REACTOR RESERVE SHUTDOWN HRS 29.75 765.42 2702.49
14. HOURS GENERATOR ON LINE 6Y7.60 1249.65 03315.60
15. UN1I RESERVE SHUTDOWN HOURS .00 .00 2 3. .:0
16. GROSS THERiiAL ENERGY GEN. (MWH) 153~/204.00 7456234.40 16S331460.56
17. GROSS ELEC. ENERGY GEN. (hWH) 513078.00 817484.00 531624c0.00
18. NET ELEC. ENERGY GENERATED (MWH) 490290.00 766205.00 501 &/ 4 .00
19. UNIT SERVICE FACTOR 93.77 57.05 67.52
20. UNIT AVAILABILITY FACTOR Y3.77 57.05 67.54
21. UNIT CAP. FACT 09 (USING MDC NET) YO.69 53.35 61.15 2 2 ., l'N I T CAP. FACTOR (USING DER NET) 93.76 50.60 50.09
23. UNIT FORCED OUTAGE RATE 6.23 36.00 15.50
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACit)

NONE

25. IF SHUTDOWN AT END OF REP 0kT PERIGI,, ESTitiATED Dole OF START UP
26. UNIIS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAIION)- FORCAST ACliEIVED INITIAL CRITICALITY - - -- - ----

INITIAL ELECTRICITY - -- - - --

COMf1ERCIAL OPERATION --- ---

1.16 - 9

Page 7 of 12

.CP&L CO t'l AN1 itRFORMANCE DAi, brSlEM P A L. E RUN DATE *1/03/95 UPLRATING D A l A id 'i'U R I kf'D3a RUN 1IME ii:39:30 KOBINSON UNIT I DOCKcl 50. 050-0261 C O M Pt E fi!.D M A SCO)i OPER ATING ST A TL'S l EL E!'HUNE '003- id-4524

1. UNIT NAhE: RODitCON UNI! 2 I NU I Et, i
2. REPOR1ING PERIOD- APRIL 85 1
3. LICENLED THERMAL POWEh (tiWT) 2300  ; There are presently 222 Fuel  ;

4- NAMEPLATE RATINu (GROSU MUE) 7w.O I Assemblies in the Spent Fuel  ;

5. DESIGN ELECTRICAL RATING (NET MWE) i'00.0 '

Pool.  ;

6. MAX DEPENDnDLE Lv'~4CIl* ' GROSS nWE)

, 7 ,/ ? . 0 1 1

7. MAX DEPENDABLE CAPACITY ( NE , nWE/ M5. 0 - - - ------ - - - - ~ -
8. IF CHANGEG OCCUR IN i,APACITt RAIINGS ( I1 Eit '

THRU 7) 3 LNCI LAUT REIORI, GIVE REASOtJS:

9. POWER LEVEL TO WHICH RES!RIClED IF AN( (NET MUE)

NONE

10. REAHUNS FOR RESiRICTION IF ANY NONE T! IIB YR TO CUN, MONTli DATE AT1VE
11. 110URS IN REP 09~i1NG PERIOD 7t9.00 2079.00 1241OY.OC
12. tJ!:h DER OF HOURS REAC T OR CRIl lCiu. 676.47 2064.1/ 86261.47
13. .(EACTOR RESERVE SHU1DOWN HRS .2,5J 737.95 2725.02
14. HOURS GENERAiOR ON iINE 694.67 IV44.32 84010.2/
15. UNIT DESEEJE SHUIDOWN HOURE .00 .00 23.20
16. GROSS THERtiAL ENERGY G E N ., tnWH/ tS16455.60' 4002690.00 1 6 6 8 7 ," 2 4 . t 6 l
17. GROSS ELEC. ENERGY GEN. (hWH) 513517.00 1331001.00 336/SJ77.00
18. NET ELEC. ENERLY GENERATED (hWH) 40YO39.00 12 51, m .00 50664905.00
19. UNIT CERVICE FACTOR 96.62 67.S3 6 / . /n
20. UNIT AVAILABILITY FAUiOR Y6.62 6/.53 67.7i
21. UNIT CAP. FACIGR (UDIr4G MDC t!ET) iC2.20 6 5 . ', / 61. Ui 2?. UNIT CAP. FACTOR (USING DER NET) 97.t7 62.2Y 58.32
23. UNIT FORLED OUTAGE RATE 3.30 27.22 15.49
24. SHUTDCUN"> SCHED. OVER NEXi 6 n 0N T W3 (TYPE,-DAFE, AND D U R A 1 1 0l+ OF EAEM)

NONE

25. IF CHUIDOWN AT END OF REPORT PERIOD. ESTJM61ED DATE OF GTART UP
26. UNIIS IN TEST STATUS (PRION TO COMMERCIAL OPERATION) FORCAST ACllEIVED

~~

INITIAL CRITICALITY TE - - -.~~_..-

INITIAL ELECTRICITY - - --- --

l COMMERC1AL OPERAIION - 55~- - --~~I-1 1

$.h ~

e - Page 8 of 12 i

i CP&L CD PLANT PERFORMANCE DATA SYSTEM PAk i RUN DATE 11/08/85 OPERATING DATA REPORf RPD36 RUN fIhE 1i;42:20 ROBINSON UNIT &

DUCKER NO. 05U 0261 C0liFLL1ED 1Y ,. E. SCUTI OPERATING STATUS T ELEl liONE (003)303 .b24

i. UNIT NAME: ROBINSON UN1'i' 2 1 NUIES l
2. REPORTING PERIOD: MAY BS l i There are presently 222 Fuel 4 3. LICENSED !!IERMAL POWER (MWI) .:300 i  ;

Assemblies in the Spent Fuel

4. NAriEPLATE R A TINb (GROSS MUE) 73V.0 i  ;
5. DESIGN ELECTRICAL RATIr4G (NLI MWE) 700.0 i Pool.  ;
6. MAX DEPENDABLE CAPAClTY (GROSS nWE) 700.0 i i
7. liAX DEPENDABLE CAPACITY (NET MWE) 665.0
8. IF CHANGES OCCUR LN CAPACITf RATINGS ([ fens 3 THRU 7) GINCE LAST REPORT, GIVE REASONS:
9. POWER LEiEL f0 WHICll I: L OT R IC T ED IF ANY (NEI hWE) NONE
10. REASONS FOR RESTRICT 10t4 IF ANY' NONE THIS Yn TO CUnUL MUNIH 1/AIE ATIVE ii. HOURS IN REF']RTING PLU IOD 744.00 3623.00 1248S3.00
12. NUtiBER OF HOURS REACTOR CRITICAL 730.50 27Y4.95 06772.25
13. REACTOR RESERVE SHUIDOUN HRS 13.42 801.37 2738.44 i4. HOURS GENLRATOR ON LINE 729.17 2673.49 047J7.44
15. UNIT RESERVE SHUTDOWN HOURS .00 .00  ;?d . 20
16. GROSS THERitAL EliERG i GEN. (MWH1 1614544.80 S617234.00 iob492460.yo i7. GROSS ELEC. ENERGY GEN. (MWH) S34610.00 106561i.00 5421040/.00
18. NET ELEC. ENERGY GEt4ER AT ED (tiWH) 509348.00 1764672.00 51174333.00
19. UNIT SEP.VICE FAC10H 90.01 73.77 67.07
20. UNif AVAlt.ADILITY FACf0R 90.01 73.77 6/.07
21. UNIT CAP. FACTOR-(USING tiDC NE T ) 102.YS 13.24 61.64
22. UNIT CA: . FACTOR (USING DER NET) 77.00 69,50 50.55
23. UNIT FORCED OUIAGE RATE 1.Y9 21.'72 15.37
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS ( T &L , DATE, AND DURATION OF EACH)-

NONE

25. IF BHUlDUWN A1 END OF REPORT PERIOD, ESTlMATED DAfE OF STAR! UP 2c. UNITS IN IEST UTAFU5 (PRIOR TO COMMERCIAL UPERA110N) FORCAST ACHEIVED INITIAL CRITICALITY I---- - -I-INITIAL ELECIRICIfY N- - - T-- - -

. COMriERCIAL UPERATION - ~7---~ - - - -

1.16 -9

Page 9 of 12 CPat CO PLANT PERFORMANCE NIA SYSil;h I' AGL i RUN DATE ii/00/8S UKRkiING DAia REPORT WD36 RUN TIME i1 45:31 RGBINSON UNIT 2 DOCi4 L i NO. 050 026i CGt1PLL I ED BY A- E. f.C 01 I l OPERA 11NG SFATUS TELL HUNL ( Ln J ) , u d - 4 Y2 4

i. UNii NAME; ROBINSON UNIT 2 i NUTL3 i
2. ItEPORTING PERIOD: Jute 85  ;

There are presently 222 Fuel I

3. LICENGED TMERtiAL POWER ( MW T ') 2300 ,

Assemblies in the Spent Fuel 9

4. t/AhEPLATE RATING ( GROSS h' T. ) /b0 }

Pool.

S. DESIGri ELECTRICAL RATING (NET hWE) 700.t l

6. t1AX DEFENDMd E C APACII f ( t, R U m MUL) 700.0 t i 4
7. MAX DEPENDABLE CAPAClTY ( NE I ti!JE i 665.0 - - - -- --- -- -- --

G. IF CHANGES DCCUR I ti CAPACllY RATIt:GS (1TEt13 3 THRU 7) GlNLC ASI REPORT, GIVE REASONS:

, 9. POWER LLstL ID UHICli RESTRICTLD IF ANY (NE1 MWE) NONE

10. REASONS F0h RESTRICT 1UN IF ANY- NONE THIS YH TO CUMUL M 0 h Til DATE ATIVE ii. HOUR 5 IN REPuhilf?G PERIOb 720.00 4j43.00 125573.00
12. NUhi:ER OF HOURS REACTUR GRiriCAL '/20.00 M14.95 07 /i; , ?5
13. TsEACTOR RtGERVE SHUTDOU" ta3 .00 G')t.37 2738.44
14. HOURE' GENE.RATOR UN LINE 720.00 3393.49 US4M .44
15. UNIT RESEF t SHU f bOWN 110URS .00 .00 23.20 i6. GROSS THERiiAL ENEW,Y GEN. (MWH) 163i 'M 6. 24 71'4 Y 15 i . 0 4 17012430S.'20
17. GROSS ELEC. ENikGY GEN. (ti W H ) S38230.00 240304i.00 _,4 7 > 1/1 ? . 0 0 i'.

o RET ELEC. ENERGf GENERAi'ED 'iWH ) 513390.?O '"'78002.00 Si63?/J3.00

19. Utill CERVICE FACTOR 100.00 '/U ,14 63.0L
20. UNIT AVAILABILITY FACTOR 100.00 7J,14 60.07 21..UN11 CAP. FACTOR (USING MDC NLf) 107.22 7U.88 61.90
22. UNIT CAP. FAC'iCR (llOltsG DLR NET) 101.U6 /4.Va 5 0 . t19
23. UNIT FURCFD Gui AGE RATE .00 i '/ . 'i 4 15 . .:S
24. SHUTDOWVG SCHED. OVER NLXT 6 MONTH' (TYPE, DATE, Arid DURAT10N Of EACH)

NONE

+

25. IF GHUTDOWN AT END OF REPOns PERIOC, ES T ItinTE D DATK OF START UP
26. UNITS IN TEST G1ATUS (PR10R TO CbMMERCIAL OPEfiATION) FORCASI ACHELVED.

~~

INITIAL CRITICALITY - -- -- ~1 -

INIIIAL ELECTRICITY -- - ff- - 27~ - -

~~ ~~

C0tir1ERCI AL OPERAlION -- -- --

4 3.k ~~'

Page 10 of 12 1

'CP&L CO PLANT PERE ORitANGL DAiA 6 alEM P A L. c RUN DATE :i/08/05 DPERA1Irb DA1A REPUHf k P D N, RUN T Irit ti s?:35 Rob 1NSoti LINI T 2 DOCKEI N 0: -0261 C0hPLEIED s n. E. CColl DPERATING STATUS TEl EHl0NE (603)363-D24

. --- .. - ~ . - - - _ . -

1. Utill NAtiE RUBIN 00N UNIT 2 i N0lFS  !
2. REPOR!ING PERIOD: bJt r 35 i  !
3. LlCENSdD THERNAL POWER'(tiWT) 2300 i There are presently 222 Fuel 1
4. NAMEPLATE RATING (GROF.6 MWE) 739.0 l Assemblies in the Spent Fuel i
5. D E S I '.. ! . El ECTRICAL RATlNG (NET MUE) 70( .0 1 Pool, i
6. MAX DEPEribAPLE CAPACIlY (GROSS tiWE) 700.0 i i
7. t1 AX DEPEND ADLC C APACIT 'r (NET ijuE ) 465.0 -- - - - - - - - - - - - - - - -
8. IF CHANGES DCCUR IN CAPACITY RATINGb ( 1 TCt1S 3 1HRU 7) SINCE LA9T Kf: PORT, GIVE REASONS:
9. POWER LEVEL CD WHICH REGTRICTED IF /MY (NLi MWE) NONE
10. REA00hs FOR RECTRICTIUN IF ANY NONE THIS YR TO CUNU; t10 NTH DATE AIi%u
11. HOURS It REPORTIlE PERIOD 744.00 S 0 0 'l . 0 0 126317.00
12. NUtiUER OF h00RS REACTUR CRITICAL 720.93 1243.00 0U411.10
13. REACTOR RESERVE SHUfDOWN HRS 15.07 016.44 2/53.51
14. HOURS GEtiEkATOR ON LIrlL 727.77 4121.26 06107.21
15. UNIT RESERVE SHUfDOWN HOURS .00 .00 23.20
16. GROUG 'i;iERMAL ENERGY GCti. (hWH) 1613965.20 0863116.24 17173BJSO.40
17. GROS 9 ELEC. ENERGY GEN. (MUH) 529264.00 2?33105.00 5527798i.00
13. NET ELEC. ENERGY GENLRATED (MWH) 504030.00 2732092.00 52191753.00
19. UNIT SERVICE FACTOR 77.82 81.02 6 0 ."23
20. UNIT AVAILADILITY FACTOR 97.82 G1.02 60.25

(

21. UNIT CAP. FACf0R (USING MDC NEi) 101.87 .02.24 62.t3
22. UNIT CAP.. FACTOR (USING DER NET) 96.70 70.13 5Y,03
23. UNIT FORCED OUTAGE RATE 2.10- 15.54 15.19
24. SHUTDOWNS SCHED. OVER NEXT 6 ?10NTHS (TYPE, Onli , AND DURATION OF EACH)

NONE

25. IF SHUTDOWri AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP
26. UNITG IN lEST GTAlUG (PRIOR TO Cut 1MERCIAL OPERATION). FORCAST ACHEIVED INITI AL GRIlICAL,!TY - - - - -- - -

Ir41TI AL EL ECTRICITY -- - - - - - - --

COMMERCIAL OPERATLON -~ -- T----- -

~

PT -

l l

).15 9

Page 11 of 12 ,

l CPLL CO PLANT f C 'tF ORtiANGL DATA J Y 'a I L n fu RUN DATE ii/06/1. UPERATING DAT4 < t l'UR i li'D X 6 RUN TIhE 14:57:22 It OD I NC Ul- UN1f 2 30CKEi NO. O W O?61

c, 'LE ! Lit LY , L. 201 GPEhAlLt!G STAIUb ILL Lt it ( UO3 )k ' 'l ' > 0-
1. UNIT NAnL: RODIN3UN UN1F 2 I hli ! E-
2. REPORTING PERIul: AULUSf 35 i There are presently 222 Fuel i J. LICENDED 'tHERriAL POWER (MWT) 2300 t Assemblies in the Spent Fuel .

-1 . NAnElLAIL. RA.iNL t (LRUSB nLk, 73y.0 t Pool. i c2 . DES 1GN ELECiBICAL RATING td i ri A ; s /00.0 i j

6. MAX DEPLl4DADi E CAPAC11Y (GRUS tiUE ) 7: 1.0 1 +
7. tiAX DEFENI; A ..E CAPAClif (NET dWL) 663.0 - - - - - - - - - - - - -- ---
8. l i- CHANGES DCCUR IN CAPACITY RA'iNGS (IlEMS 3 ii;KU i) JC LAST REi' ORT .

GlVE rep,GONS:

9. Jt:WL.R LEVEL 10 WHli.H .fufRICTLD If ANY (NL1 t1WE ) NONE
10. HEAbuNS FOR REGIR1CIION IF ANY N/A TH1S YP 10 UUM Jt llOtt iH DATL A i l '. t ii. HOURL in M.F OR i i t?G l'LRIOD 744.00 SU31.00 12/065.00
2. WJhuhH OF HOURL REACT 0i< CRI11CAi 718.8 / 4 9 6 2 . / *, 89160.05 to. REACIOR REUERVE ONUTDOWtt HR5 2 '.i . t a 041.57 .? /78. 64

,4. HOURG GEhLdn~lCR C il ... ! N L 716.4? 4831 .6u U6703 t.'

15. UNIT RESERVE SHUIDOWN HOURS .00 .00 23.20
16. GROZ I!!ERMAL ENERGY GEN. (HWH) iS036.32 1041511 56 i T f .' Oaua /9 i<. GROGS I M C. ENLsGY GEtz. . h ,; H ) 500132.00 'q41237.00 55/06113.00 j a . (JE ~i ELEC. ENERGY GEraAnrLD (MuH) 4H2142.00 3' 652Ja.00

. S.?67;UYS.00

17. UNIT SERVICE FACTOR 76.29 82.yo 60.40
20. UNIT AVAIL 6blL1 ( Y iACTUP Y6.27 b2.W  % . 41
21. UNii CAP. FACTOR (USING MDC NEi 7'l.65 C4.21 62.34
22. JNIT CAP. FACiDR (UCING DER NLT) 72.IV C0.00 S v . 'J
23. UNIT fGRCED OUTAGE RATE 3. ? 1 13.9, 15.10
24. SHUTDOWNS SCiiED. OVER NEXT 6 tiUNTHC (TYPE, DATE, AND DU;AIION Of E ACi t )

Refueling outage beginning February 01, 1986, for 49 days.

25. IF SHUTLOWN AT E.ND OF REPORT PERIOD, Es t ItiATED Dai'E OF G TAlt i UP
26. UNITS IN TEST SIAfUr (PRIOR fu COMMEDCIAL OPERAIIGN) IURCACT ACHL'/fD INIFIAL ;R11ICALTf' - - - - -- -

INiflAL ELECTRICITY - - ~ ~ - - - - - - - -

C0titiERCI AL. OPER A11UN -- -- --

1.i6 - ')

a

  • Page 12 of 12 CP&L CO PLANT PERFORMANCE DATA CYSTEM f%E i RUN DAir ii/00/85 OPERATING DMA REPOR1 TD36 RUN 7Il1E i1:57:29 WINS 6tt UNI 1 2 00CKLr NO. 09 0261 COMPLEltD B '. A. E. SCul?

OPERA 1ING SlATUS IELEPHONE (C03)383-4524

1. UNIT NAME ROBINSON UNIT 2 i NO T E: 1
2. REPORIING F;R10D: SEi1ER R 95 l l There are presently 222 Fuel
3. LICENSED THERMAL PUWLG (MWT) ' 300  ;

Assemblies in the Spent Fuel

4. NAMEPLATE RATING (GROSS MWE) 739.0 i  ;
5. DESIGN ELECTRICAL RATING (NET NWE)- 700.0 i Pool.  ;
6. MAX DEPENDAl a CAPACITY (LJO% MUE) 700.0 1 1
7. max DEPENDABLE CAPACITY (NET hWE/ 065.0 - ---- ----- - ~------ -
3. IF CHANGES GECUR IN CAPACITY RATINGS (ITEMS 3 IllRU 7) S itiE LAST REIR T, GIVE REASONE
9. POWER LEVEL TO WHICH 'E5TRICTED If ANY (NET MUF.) 92%
10. REASONS FOR REUIRICTLON IF ANY Core Peaking Factor limitations. (FQT) illIS YP l0 UMUL MONTH DAIE Al I VE ii. Il0URS IN REPORIING FERICL 720.00 4551.00 127701.00
12. NUMJER OF HOURS REACTOR CRITICAL 607.97 5< 72 09040.02
13. REACTOR RESCR/E SHUID05 M HRS 32. 3 873.a0 2810.67
14. HOURS GENERATOR DN LINE 669.00 9307.40 0 7., / 3 . 41,
15. Ul;IT RESERVE 5HUTDOWN HOURS .00 .00 '13. 20
16. GROSS TH& MAL ENERGY ;EN. (MWH) 1454431.68 1106'/504.24 174744B18.40
17. GROSS ELEC. ENERGY GEN. (MUH) 479020.00 3920?S?.00 56265133.00

'O NET ELEC. ENERGY GENERATED (MW4) 454970.00- 37202i2.00 S312VU73.00 t '? . UNIT SERVICE FACTOR 93.03 U4.07 68.53

20. HNIl AVAIL ABTL1 TY FACI 9R 93.03 04.07 69.55
21. UNIT CAP.' FACTOR (USING MDC NET) 95.02 05.40 62.52
22. UNIT CAP. FACTUR (USING DER NET) 9 v . '2 7 Rt.13 S9.40
23. UNIT FORCED OUTAGE RATE 6.97 13.10 15.04
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURAlION OF EACH)

Refueling Outage beginning February 01, 1986 for 49 days.

25. IF GHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DAir OF START UP
26. UNITO IN TEST STATUS ( 'RIOR TO COMMERCI AL Ol'ERATIONI FORCAGI ACHLIVED INITIAL CRITICALITY -- - --- - - - - - -

INITIAL ELECTRICITY - - - ---

COMMERCIAL OPERATIGN -- --- - - - - -

i.16 --9

M.

CD&L Carolina Power & Light Company 10BINSCN NUCLEAR PIOJECT DEPARIMENT POST CFFICE BOX 790 HARPSVILLE, SOU'IH CAIOLINA 29550 NOV 8 1985 Robinson File: 15505 Serial: RNPD/85-4063 i

Mr. James M. Taylor, Director Office of Inspection & Enforcanent

, U. S.' Nuclear Regulatory Cmmission Washington, D. C. 20555 PCBINSCN NUCLEAR PICIECT DEPARINENT UNIT NO. 2 in.At.T NO. 50-261 LICENSE NO. DPR-23 MCNIELY OPERATICNS REPORP

Dear Mr. Taylor:

In accordance with 'Ibchnical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power and Light Cmpany herewith subnits the report of operation statistics and shutdown experience for the month of October, 1985.

In addition to the subject report, enclosed are revisions to all previous 1985 reports which reflect more accurate thermal generation values. 'Ibese changes are the result of more precise data collection and retention methods which have recently been inplemented and will be utilized in cmpleting all future reports.

Very truly yours, YM R. E. gan General Manager H. B. Robinson S. E. Plant AES:ac Enclosure cc: J. N. Grace (1)