ML20137B371
| ML20137B371 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/31/1985 |
| From: | Morgan R, Scott A CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RNPD-86-31, NUDOCS 8601150298 | |
| Download: ML20137B371 (4) | |
Text
_ _ _ _ _ _ _ _ _ _ _ - _
,g a
Enclogura to Smrial: RNPD/86-31 Paga 1 of 3 CP<CO PLANT PERFORMANCE DATA SYSTEM PAGE 1
RUN DATE 101/02/86 UPERATING DATA REPURI RPD36 RUN 1IME ii:01:45 RUBINSON-UNIT 2 DOCKET.NO. 050-0261 COMPLETED BY A.
E.
SCOTT OPERATING STATUS TELEPHONE (803)383-4524
-1.. UNIT-NAME: ROBINSON UNIT 2 i NOTES I
=2.
REPORTING PERIUD: DECEMBER 85 l
There are presently 222 Fuel l
- 3. LICENSED THERMAL POWER (MWT): 2300 l
Assemblies in the Spent Fuel l
4.-NAMEPLATE RATING (GROSS MWE): 739.0 l
- pool, l
- 5. DESIGN ELEGIRICAL RATING (NET MWE): 700.0 l
l 1
6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 1 1
-7.
MAX DEPENDABLE CAPACITY (NET MWE) 665.0 8.
IF. CHANGES-0CCUR IN CAPACITY RATINGS (ITEMS 3 THRU ~/) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH REtiTRICT ED IF ANY (NET MWE). None
- 10. REASONS FOR RESTRICTION IF ANY:
N/A THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS'IN REPORTING PERIOD 744.00 8760.00 129990.00 '
- 12. NUMBER OF HOURS REACluR CRITICAL 744.00 7859.72 92057.02
- 13. REACIOR RESERVE SHUfDOWN HRS
.00 873.60 2810.67
- 14. HOURS GENERAlOR ON LINE 744.00 7701.95 89767.90-
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERNAL ENERGY GEN. (MWH) 1633042.32 16616734.56 179491968.72
- 17. GROSS ELEC. ENERGY GEN. (MWH)
-550979.00 5514595.00 578594'71.00
- 18. NET ELEC. ENERGY ~ GENERATED (MWH) 525788.00 5239003.00 54649464.00
'19. UNIT SERVICE FACTOR 100.00 87.92 69.06
- 20. UNIT AVAILABILITY FACTOR 100.00 87.92 69.08
- 21. UNIT CAP. FACTOR (USING MDC NET) 106.27 89.95 63.22 22.-UNIT CAP. FACTUR (USING DER NEl) 100.96 85.45 60.06
- 23. UNIT FORCED OUTAGE RAIE
.00 Y.79 14.73
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURAT10N OF EACH):
Refueling Outage beginning February 01, 1986, for 45 days.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED LATE OF START UP:
26 UNITS IN' TEST STATUS (PRIOR TO COMMERCIHL OPERATION)- FORCAST ACHEIVED
~~
~~
INIlIAL CRITICALITY
--- =---
I---
INITIAL ELECTRICITY I~----
I~---
~
~
~
COMMERCIAL OPERATION I~----
- IEE --
8601150298 851231 PDR ADOCK 05000261 R
PDR i.16 - 9 a
d e-Pzgs 2 of 3 CP&L CO PLANT PERFORMANCE DATA SYS'IEM PAGE i
RUN DATE 01/02/86 AF'PENDIX B - AVERAGE DAILY POWER LEVrl RPD39 RUN IIME 1i:01:42 ROBINSON UN1T 2 DUUKEI NO. 050-0261 COMPLEIED BY A.
E.
Scull IELLPHUNE (803)383--4524 DECEMDER 1985 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i 722 17 736 2
722 18 737 3
722 19 735 4
724 20 735 5
728 21 735 6
728 22
/35 7
727 23 735 8
730 24 735 9
729 25 685 10 741 26 523 ii 740 27 575 12 738 28 634 13 738 2Y 636 14 737 30 636 15
'737 31 637 16 736 1.16 - 8
1 0
DOCKET NO.
050-0261 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H. B. Robinsnn DATE 01-02-86 COMTED BY A.
E.
Scott REPORT MONTH December TELEPHONE 801-1R1-4s74 e.
E c
E_ E 3
j.E 5 Licensee
,E r, h
Cause & Corrective L.
Date g
3g 4
.3 s &
Event g
{
Action to H
$=
2 ;f3 Report a mO
. hevent Recurrence E
c o
2 o
6 1201 851224 F
A IA INSTRU Reduced power due to rapid load reduction from a frozen sensing line on reheat pressure, transmitter.
Sensing line was relagged and unit returned to power level.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G -Instructions m
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data y
B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee o
C-Refueling 3-Automatic Scram.
Event Repor (LER) File (NUREG-u D-Regulatory Restriction 4-Other (Explain) 0161) o E-Operator Training & Ucense Examination m
F-Administrative 5
w G-Operational Error (Explain)
Exhibit I - Same Source 19/77)
Il-Other (Explain)
e Form 244 Carolina Power & Light Company x v. r.. r..
- w...... g.,. o.,,. :
.;...,-p company correspondence ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550
- N07 W Robinson File:
15505 Serial: RNPD/86-31 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 ROBINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. Taylor:
In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of December, 1985.
Very truly yours, lY d
R. E. M an General Manager H. B. Robinson S. E. Plant AES:/jch Enclosure cc:
R. A. Hartfield (2)
J. N. Grace (1) iy