ML20084H860
| ML20084H860 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/30/1984 |
| From: | Morgan R, Scott A CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RSEP-84-329, NUDOCS 8405080234 | |
| Download: ML20084H860 (4) | |
Text
, Enclosure to Serial:
RSEP/84-329 Page I of 2 OPERATING DATA REPORT DOCKET NO. 050-0261 DATE 05/01/84 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524 OPERATING STATUS
- i. UNIT NAME: ROBINSON UNIT 2 i NOTES 1
- 2. REPORTING PERIOD: APRIL 84 I
i
- 3. LICENSED THERMAL POWER (MWT): 2309 l
There are presently 314 Spent g
- 4. NAMEPLATE RATING (GROSS MWE): 739.0 l
Fuel Assenblies in the Spent g
5.
DESIGN ELECTRICAL RATING (NET MWE): 700.0 l
Fuel Pool.
l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 l l
- 7. MAX DEPENDABLE CAPACITY (NET MWE). 665.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): None
)O. REASONS FOR RESTRICTION DF ANY: N/A THIS YR TD-CUMUL t
MONTH DATE ATIVE
- 1. HOURS IN REPORTING PERIOD 719.00 2903.00 115349.00
- 2. NUMBER OF HOURS REACTOR CRITICAL
.00 616.07 84197.30
~
- 3. REACTOR RESERVE SHUTDOWN HRS
.00 38.93 1830.32
- 4. HOURS GENERATOR ON LINE
.00 615.78 82065.95
- 05. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 06. GROSS THERMAL ENERGY GEN. (HWH)-
.00 783895.20 162875234.16
- 07. GROSS ELEC. ENERGY GEN. (MWH)
.00 246010.00
'52344876.00
- 00. NET ELEC. ENERGY GENERATED (HWH)
-2046.00 216787.00 49436411.00
- 9. UNIT SERVICE FACTOR
.00 21.21 71.15 O. UNIT AVAILADILITY FACTOR
.00 21.21 71.17
- 1. UNIT CAP. FACTOR (USING HDC NET)
.43 11.23 64.45
- 2. UNIT-CAP. FACTOR (USING DER NET)
.41 10.67 61.23
- 3. UNIT FORCED OUTAGE RATE
.00 57.24 15.17 4.
SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) : ~ None i
$g5.-IFSHUTDOWNATENDOFREPORTPERIOD, ESTIMATED DATE OF START UP: 10-25-84
- 6. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY.
C'----
C'----
INITIAL ELECTRICITY C2---
T----
~
COMMERCIAL OPERATION 27----
JT----
8405080234 840430 PDR ADOCK 05000261 I
1.16 -'9 J
Pega 2 of 2 APPENDIX B-AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0261 UNIT' ROBINSON UNIT'2 DATE 05/01/84 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524 RPRIL 1984 DAY AVG. DAILY POWER LEVEL I-DAY AVG. DAILY POWER LEVEL (HWE-NET)
(HWE-NET) 1
-3 17
-3 2
-3 18
-3 3.
-3 19
-3 4
-3 20'
-2 5
-4 21
-2 6
-3 22-
-2 7
-3 23
-2.
8 24
-2 9
-3 25
-2 10
-4 26
-2 11
-4 27
-2 12
-4 28
-2 13
-3 29
-2' 14
-3 30
-2 15
-3 16
-3
.i '.16 -- 8 4
x
m
- Enclecure to Serial: RSEP/84-329
-Peg 2 1 -of I e
050-0261.
DOCKET NO.
UNITSilU1 DOWNS AND POWER REDUCTIONS UNIT N AME H.
B. Rob in c:nn DATE 840502 COMPLETED BY A.'E.
Sener April REPORT MONTli TELEPHONE Rnt-383-4s?4
~.
E E
Cause & Correctac
.[ ?
3 4Y~
Licer:see
[g y*3 o
E-Action to No.
Ihte g
3g
(
jg5 Event g
H-
$2 5-Ji gg g Report 2 mO 5U Prevent Recurrence o
e C
CJ HTEXCH Continuation of Refueling and Steam 0401 F40401~
S-719-C 1
Generator Replacement Outage.
1 1
~
i
?2-3.
4 Exh'ibit G - Instructions
' Method:
F: Forced
. Reason; r
s 5: Scheduled
.~A Equ!pment Failure (Explain).
I-Manual for Preparation of Data B-Maintenance or Test 2 Manual Scram.
Entry Sheets for Liecusce 3-Automatic Scram.
Event Report (LER) File (NUREG-C Refueling,
D Regulatory Restrietion 4-Other (Explain) 0161)
E4peratos Training A License Examination 5
F Administrative Exhibit ! Same Source
" G Operational Error (Explain)
- P!/77)
' I!.Other (Explain)
~
,I i
CD&L i
Carolina Power & Light Company H. B. ROBINSON STEAM ELECTRIC PLANT Post Office Bex 790 Hartsville, South Carolina 29550 MAY - 41984 Rd2inson File No:
15505 Serial:
RSEP/84-329 Mr. Richard C. DeYoung, Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 H.
B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50.-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant. Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of April, 1984.
Very truly yours,
-u R. E. Mo n
General Manager H. B. Robinson SEG Plant AES/ar Enclosure cc:
R. A. Hartfield (2)
J. P. O'Reilly (1) 4b.4 o
i