ML20135F992
| ML20135F992 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/30/1985 |
| From: | Scott A CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20135F982 | List: |
| References | |
| NUDOCS 8509180050 | |
| Download: ML20135F992 (3) | |
Text
,
~
Page 5 of 8 P&L CO PLANT FERFORMANCE DATA SYSTEM PAGE i
UN DATE 09/05/85 OPERATING DATA REPORT RPD36 UN TIME 09:40:21 ROBINSON UNIT 2 DOCKE1 NO. 050-0261 COMPLETED DY A.
E.
SCOTT OPERATING STATUS
.ELEPHONE (003)303-4524 1.
UGIT NAME: ROBINSON UNIT 2 i NOTES There are presently 222 1
2.
REPORTING PERIOD: APRIL G5 i
fuel assemblies in the Spent 1
3.
LICENSED THERMAL POWER (MWT) 2300 1 Fuel Pool.
I 4.
NAMEPLATE RATING (GROSS MWE). 739.0 1
5.
DESIGN ELECTRICAL RATING'(NET MWE)- 700.0 I
i
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 I i
- 7. MAX DEPENDABLE CAPACITY (NET MWE) 665.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
NONE
- 10. REASONS FOR RESTRICTION IF ANY*
NONE THIS YR TO CUMUL MONTH DATE-ATIVE
- 11. HOURS IN REPORTING PERIOD 719.00 2879.00 124109.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 696.*47 2064.37 86261.67
- 13. REACTOR RESERVE SHUTDOWN HRS 22.53 787.9F
'725.02
- 14. HOURS GENERATOR ON LINE 694.67 1944.32 84010.27
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1565234.64 4067423.04 166942657.20
- 17. GROSS ELEC. ENERGY GEN. (MWH) 513517.00 1331001.00 5367S077.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 409039.00 1255324.00 50664985.00
- 19. UNIT SERVICE FACTOR 96.62 67.53 67.69
- 20. UNIT AVAILABILITY FACTOR 96.62 67.53 67.71
- 22. UNIT CAP. FACTOR (USING DER NET) 97.17 62.29 58.32
- 23. UNIT FORCED OUTAGE RATE 3.38 27.2.1 15.49
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND' DURATION OF EACH)
J
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START.Ut*:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORCAST
(;CHEIVED INITIAL CRITICALITY v ~. Z --
. 2 2--~
INITIAL ELECTRICITY
- Iri---
l!T ---
s COMMERCIAL OPERATION
!!2-_-
l 8509180050 850910 DR ADOCK 05000261 1.16 - 9 R
i PDR
/r
-a,
M U.u M M U
~
Page 3 of 4 Page 6 of 8 050-0261 DOCKET NO.
UNIT SilU1 DOWNS AND POWER REDUCilONS UNIT N AME H. B. Robinson DATE 850501 COMPLETED BY Anita E.
Scott REPOR1 MONTil APRII.
TELEPilONE 803-383-4524 -
c
{g 3
jN'5 Licensee E -t ge, cause & Corrective o
N...
1)are c
59 i
jy&
Event
= 3?
9?
Action to S
j@
d j;gg Report n E0
}L Prevent Recurrente 6
0401 850406 S
B 1
ZZ TURBIN Unit load reduced to 66% reactor power l
to perform turbine valve test.
While at reduced load, "B" heater drain putap was taken out-of-service for maintenance. Upon completion of maintenance, Unit was returned to full load.
0402 850408 F
24.33 3
1 CB PUMPXX Unit was shut down to repair the No. 2 l
seal on "C" Reactor Coolant Pump.
Investigation revealed that there is a generic problem with the presently installed seal design. The 0-ring material is too hard and tends to cause the No. 2 seal to hang up periodically.
"C" RCP seal parametert l
returned to normal and the Unit was r o t o rn eri en servico_
Trnnsformer 1
2 3
4 l- - I.uted Reason :
Method:
Exlubit G Instructions S St hed uled A Lquiprnent Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2 Manual Scrain.
Entry Sheets f or Licensee C. Refueling 3 Automatic Scram.
Event Report (LI R) File (NURI G-D-Regulatory Restriction 4-Other Ilixplain) 01611 1 Operator Training & License liumination F-Administrative 5
G-Operational Liror (Explain) f s!nbit I - Same Source t'#/77)
Il-Ot her ( E splam)
Page 4 of 4 Page 7 of 8 DOCKET NO. 050-0261 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME H. B. Robinson DATE 850501 COMPLETED BY Anita E. Scott REPORT MONTil april, TELEPHONE 803-383-4524 "L
Litensee j t, h'.
jg 3
hE Cause & Correceive No.
Dale i
3g Ga 2sE Event g
9.?
Action to g, =!
Repori n mO 5V Prevent Recurrence y=
H o
u 6
0402 850408 F
24.33 B
1 CB PUMPXX (Continued) l lighting arrestors were also replaced during this shutdown.
I 2
3 4
i: F.uced Reason :
Method:
Ex!nbit G. instructions S Stheduled A-Equipment Failure (Explain) l Manual for Preparation of Data B Maintenance or Test 2 Manual Scrarn.
Entry Sheets for Licensee C Refueling 3 Autornatic Stram.
Event Report ILER) FileINURLG.
D-Regulatory Restriction 4-Ot her IE xplam) 0161) l'-Operator Training & Ucense Examination F-Administrative 5
G-Operational Error IEsplain)
Estubit i. Same Source 19/77)
Il-Ot her ( E splain)
.