ML20135F992

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Apr 1985
ML20135F992
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/30/1985
From: Scott A
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20135F982 List:
References
NUDOCS 8509180050
Download: ML20135F992 (3)


Text

,

~

Page 5 of 8 P&L CO PLANT FERFORMANCE DATA SYSTEM PAGE i

UN DATE 09/05/85 OPERATING DATA REPORT RPD36 UN TIME 09:40:21 ROBINSON UNIT 2 DOCKE1 NO. 050-0261 COMPLETED DY A.

E.

SCOTT OPERATING STATUS

.ELEPHONE (003)303-4524 1.

UGIT NAME: ROBINSON UNIT 2 i NOTES There are presently 222 1

2.

REPORTING PERIOD: APRIL G5 i

fuel assemblies in the Spent 1

3.

LICENSED THERMAL POWER (MWT) 2300 1 Fuel Pool.

I 4.

NAMEPLATE RATING (GROSS MWE). 739.0 1

5.

DESIGN ELECTRICAL RATING'(NET MWE)- 700.0 I

i

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 I i
7. MAX DEPENDABLE CAPACITY (NET MWE) 665.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)

NONE

10. REASONS FOR RESTRICTION IF ANY*

NONE THIS YR TO CUMUL MONTH DATE-ATIVE

11. HOURS IN REPORTING PERIOD 719.00 2879.00 124109.00
12. NUMBER OF HOURS REACTOR CRITICAL 696.*47 2064.37 86261.67
13. REACTOR RESERVE SHUTDOWN HRS 22.53 787.9F

'725.02

14. HOURS GENERATOR ON LINE 694.67 1944.32 84010.27
15. UNIT RESERVE SHUTDOWN HOURS

.00

.00 23.20

16. GROSS THERMAL ENERGY GEN. (MWH) 1565234.64 4067423.04 166942657.20
17. GROSS ELEC. ENERGY GEN. (MWH) 513517.00 1331001.00 5367S077.00
18. NET ELEC. ENERGY GENERATED (MWH) 409039.00 1255324.00 50664985.00
19. UNIT SERVICE FACTOR 96.62 67.53 67.69
20. UNIT AVAILABILITY FACTOR 96.62 67.53 67.71
21. UNIT CAP. FACTOR (USING MDC NET) 102.28 65.57 61.39
22. UNIT CAP. FACTOR (USING DER NET) 97.17 62.29 58.32
23. UNIT FORCED OUTAGE RATE 3.38 27.2.1 15.49
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND' DURATION OF EACH)

J

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START.Ut*:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

FORCAST

(;CHEIVED INITIAL CRITICALITY v ~. Z --

. 2 2--~

INITIAL ELECTRICITY

- Iri---

l!T ---

s COMMERCIAL OPERATION

!!2-_-

l 8509180050 850910 DR ADOCK 05000261 1.16 - 9 R

i PDR

/r

-a,

M U.u M M U

~

Page 3 of 4 Page 6 of 8 050-0261 DOCKET NO.

UNIT SilU1 DOWNS AND POWER REDUCilONS UNIT N AME H. B. Robinson DATE 850501 COMPLETED BY Anita E.

Scott REPOR1 MONTil APRII.

TELEPilONE 803-383-4524 -

c

{g 3

jN'5 Licensee E -t ge, cause & Corrective o

N...

1)are c

59 i

jy&

Event

= 3?

9?

Action to S

j@

d j;gg Report n E0

}L Prevent Recurrente 6

0401 850406 S

B 1

ZZ TURBIN Unit load reduced to 66% reactor power l

to perform turbine valve test.

While at reduced load, "B" heater drain putap was taken out-of-service for maintenance. Upon completion of maintenance, Unit was returned to full load.

0402 850408 F

24.33 3

1 CB PUMPXX Unit was shut down to repair the No. 2 l

seal on "C" Reactor Coolant Pump.

Investigation revealed that there is a generic problem with the presently installed seal design. The 0-ring material is too hard and tends to cause the No. 2 seal to hang up periodically.

"C" RCP seal parametert l

returned to normal and the Unit was r o t o rn eri en servico_

Trnnsformer 1

2 3

4 l- - I.uted Reason :

Method:

Exlubit G Instructions S St hed uled A Lquiprnent Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2 Manual Scrain.

Entry Sheets f or Licensee C. Refueling 3 Automatic Scram.

Event Report (LI R) File (NURI G-D-Regulatory Restriction 4-Other Ilixplain) 01611 1 Operator Training & License liumination F-Administrative 5

G-Operational Liror (Explain) f s!nbit I - Same Source t'#/77)

Il-Ot her ( E splam)

Page 4 of 4 Page 7 of 8 DOCKET NO. 050-0261 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME H. B. Robinson DATE 850501 COMPLETED BY Anita E. Scott REPORT MONTil april, TELEPHONE 803-383-4524 "L

Litensee j t, h'.

jg 3

hE Cause & Correceive No.

Dale i

3g Ga 2sE Event g

9.?

Action to g, =!

Repori n mO 5V Prevent Recurrence y=

H o

u 6

0402 850408 F

24.33 B

1 CB PUMPXX (Continued) l lighting arrestors were also replaced during this shutdown.

I 2

3 4

i: F.uced Reason :

Method:

Ex!nbit G. instructions S Stheduled A-Equipment Failure (Explain) l Manual for Preparation of Data B Maintenance or Test 2 Manual Scrarn.

Entry Sheets for Licensee C Refueling 3 Autornatic Stram.

Event Report ILER) FileINURLG.

D-Regulatory Restriction 4-Ot her IE xplam) 0161) l'-Operator Training & Ucense Examination F-Administrative 5

G-Operational Error IEsplain)

Estubit i. Same Source 19/77)

Il-Ot her ( E splain)

.