ML20155C646

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1986
ML20155C646
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/31/1986
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RNPD-86-1556, NUDOCS 8604170085
Download: ML20155C646 (5)


Text

__

=

7 )Enclssurs to Strir.1i RNPD/86 -1556 :

{Pags I cf 4:

' CP&LiCO:

-PLANT PERFORMANCE DATA' SYSTEM PAGE-1-

RUNLDATE.LO4/07/86

.0PERATING DATA REPORT RPD36 RUNLTIMEJ i l'i'i 2 : 25

. ROBINSON UNIT 22 DOCKET NO. 050-0261 COMPLETED BY A.

E. SCu rT OPERATING STATUS-TELEPHONE (803)383-4524

.1.-UNIT..NAME: ROBINSON UNIT 2 i NOTES There are presently 270 t-

22. REPORTING PERIOD: MARCH 86 l-fuel assemblies ir. the spent fuel l

'3.

LICENSED : THERMAL' POWER (MWT)* 2300 l pool.

J 4a: NAMEPLATE RATING.(GROSS tiWE)' 739.0 I

l 5.

DESIGN. ELECTRICAL RATING (NET i1WE)t 700.0 l

l z6.. MAX' DEPENDABLE CAPACITY (GROSS t1WE)- 700.0 t i

7.jMAX DEPENDABLE CAPACITY (NET MWE): 665.0

.8.'YF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT..

GIVE REASONS:

.N/A 2 9.LPOWER LEVEL TO-WHICH RESTRICTED IF ANY (NET MWE)

N/A 1.0.. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE i1. HOURS IN REPORTING PERIOD 744.00 2160.00 132150.00

12. NUMBER OF HOURS REACTOR CRITICAL 240i?5 800.35 92865.37
13. REACTOR RESERVE SHUTDOWN HRS i26.30 280.82 3091.49 14i-HOURS GENERATOR ON LINE 166.26 729.42 90497.32 15.~ UNIT RESERVE SHUTDOWN HOURS

.00

.00 23.20

16. GROSS' THERMAL ENERGY GEN. (MWH) 235052.64 1187650.08 180679618.80

^

17; GROSS ELEC. ENERGY GEN. (MWH) 75646.00 394068.00 58253539.00 l18. NET ELEC. ENERGY GENERATED ( tiWH )

64605.00 360810.00-55010274.00

-19.

UNIT SERVICE. FACTOR 22.35 33.77 68.48 20- UNIT AVAILABILITY FACTOR 22.35 33.77 68.50

-21.' UNIT CAP.' FACTOR (USING MDC NET) 13.06 25.12 62.60 22.LUNIT CAP. FACTOR (USING DER NET) i2.40 23.86 59.47 4

-23.-UNIT FORCED OUTAGE RATE 25.27 24.53 14.S2

'24.: SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE ~, DATE, AND DURATION OF.EACH):

None 125. - IF SHUI DOWN AT END OF REPURT PER10D, ESTItiATED DATE OF SIART UP:

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

FORCAST ACilEIVED INITIAL CRITICALITY 22--

22 - - -

INITIAL ELECTRICITY 22 --

- - II - -

COMMERCIAL OPERATION

- E ---

1 --

9604170085 860331 b

PDR ADOCK 05000261 hM R

PDR 1.16 9

Paga 2 of 4 CP&L CO PLANT PERFORMArJCE DATA SYSTEM PAGE i

RUN DATE 04/07/86 APPENDIX B - AVERAGE DAILY POWER LEVEL.

RPD39 RUN TIl1E 11:12:17 ROBINSON UNIT 2 DOCKET NO. 050-026i COMPLETED BY A.

E.

f3COTT TELEPHONE (803)383-4524 MARCH 1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)

(MWE-NET) i

-2 17

-19 2

-2 18

-19 3

-2 19

-20 4

-2 20

-21 5

-2 21 23 6

-3 22

-24 7

-3 23

-24 8

-3 24

-5 9

-2 25 140 10

-2 26 i92 11

-6 27 376 12

-6 28 516 13

-6 29 S18 14

-10 30 567 a

il f

i5

-18 31 627 16

-- 2 0 I

i

) 16 - 8 l

t

050-0261 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME 11. B. Robinson DATE _04-07-86 COMPLETED BY Anien F_

9 ente REPORT MONTH March TELEPHONE 803-383-4524 e.

E E

.] g 3

$Y5 Licensee gg f,

Cause & Corrective g?

9?

Action to Date i

3g i

jsE Event,

mo E'

Prevent Recurrence H

A=

lE ;73 Report a U

=

O 6

0301 860301 S

507.28 C

3 ZZ ZZZZZ Continuation of Refueling Outage.

0302 860322 F

49.9 A

3 86-009 CH INSTRU Automatic control was not functional due to blockage of steam flow sensing lines to the transmitter and the loss of the corresponding feed flow transmitter due to an installation error. The resultant manual control of level A beginning of cycle conditions created large variation in level ending in a high level trip of the turbine and subsequent reactor trip.

Instrument line problems were corrected.

t 2

3 4

F Forced Reason:

Method:

Exhibit G - Instructions S Scheduled A Equipment Failure (Explain) 1 -Manual for Preparation of Data B.Maint: nance ci Test 2-Manual Sciam.

Entry Sheets for Ucensee C Refuelmg 3 Automatic Scram.

Event Repori ILE R) File (NUREG-y D-Regula or> Restriction 4-Other ( Explam) 0161)

E-Operator Training & Ucense Examination F-Adnunistralise 5

o G-Operational E :or (Explam)

Eshibit I - Same Source 08/77) llother (Explam) w

b 050-0261 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H. B. Robinson DATE 04-07-86 March COMPLETED BY Anita E. Scott REPORT MONTH TELEPHONE 803-383-4524 e.

E E

[g 3

[E Licensee pt,

{'^?

Cause & Corrective o

Daie c-E2 4

2s&

Event s?

e-Action to 4

ji 5

j;yj Report n' E0

}'

Prevent Recurrence d5 0303 860324 F

9.31 A

4 Cll INSTRU Unit manually ramped offline due to potential instrumentation problems with "C" steam generator level control. Problem was traced to a zero shift in transmitter loop calibration and' corrected. While unit was offline other secondary systems were checked for proper operation. Reactor remained critical.

0304 860324 F

6.31 A

3 86-010 HA INSTRU Reactor tripped due to a main generator lockout from improper adjustment of the governor valve position limit switches in the automatic turbine load circuitry.

0305 860325 S

4.91 B

1 IIA TURBIN Shutdown to perform turbine over-speed trip test and turbine balance.

Reactor remained critical.

i 2

3 4

f: Forced Reason:

Method:

Exhibit G Instructions S Scheduled A Equiprnent Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Stram.

Event Report (LER) File iNUREG-D-Regulatory Restriction 4-Other ( Explain) 0161)

F-Operator Training & Ucense Examination 4

F-Adtninistraine 5

G-Operainmal Leror iExplain)

Estubit I - Same Source ea4 (9/77)

Il-Other (E xplain)

A

.)

Form 244 Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT Company Correspondence POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 APR 1 0 1986 Robinson File:

15505 Serial: RNPD/86-1556 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 ROBINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. Taylor:

In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of March, 1986.

Very truly yours, 7

R. E.

n General Manager H. B. Robinson S. E. Plant AEStjch Enclosure cc:

R. A. Hartfield (2)

J. N. Grace (1)

,