ML20106J380
| ML20106J380 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/31/1985 |
| From: | Morgan R, Scott A CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RNPD-85-322, NUDOCS 8502150613 | |
| Download: ML20106J380 (5) | |
Text
3
[
. N
-bncionuri to -Scrial:, RIIPD/85-322-
~
Pcgs:1 of 4 OPERATIN'G' DATA REPORT
_ /
DOCKET NO. 050-0261 DATE-02/01/85
' COMPLETED.BY A.-E.
SCOTT
~ TELEPHONE (803)383-4524 OPERATING STATUS.
i.: UNIT NAME: ROBINSON UNIT 2~
.2.
REPORTING PERIOD: JANUARY-85.
1; NOTES - There are presently (222 l
l Fuel Assemblies in the. Spent Fuel l-
.3.
LICENSED THERMAL POWER-(MWT)J 2300-1 Pool.
I
- 4. NAMEPLATE, RATING (GROSS MWE)- 739.0 al ~
1-
~
5.: DESIGN ELECTRICAL RATING 1(NET MWE): 700.0
'I 1-
.6. MAX DEPENDABLE' CAPACITY (GROSS MWE); 700.0'l-1
-7.: MAX' DEPENDABLE CAPACITY'(NET MWE): 665.0; 8.--IF CHANGES OCCUR IN. CAPACITY RATINGS (ITEMS 3 THRU 7)-SINCE:LAST REPORT,.
GIVE REASONS:
/
9.-POWER LEVEL TO WHICH RESTRICTED ~IF ANY'(NET MWE), non'e -
- 10. REASONS FOR RESTRICTION IF ANY: None THIS.
.YR-TO.
.CUMUL MONTH-DATE.
.ATIVE y
4
- 11. HOURS IN REPORTING' PERIOD-744.00
.744.00
-121974.00
- 12. NUMBER OF HOURS REACTOR CRITICAL-232.20 232;20
~84429.50-
- 13. REACTOR RESERVE SHUTDOWN HRS 485.12
.485.12
=2422.19 14.. HOURS GEN ~ERATOR ON'LINE 138.60 138.60-82204.55
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
'23.20
- 16. GROSS THERMAL ENERGY GEN. (MWH) 139600.80 139600.80 163014834.96
- 17. GROSS ELEC. ENERGY GEN. (MWH)
,43249.00 43248.00~
52388124;00-l18, NET ELEC. ENERGY-GENERATED (MWH) 32003.00 32083.00 49.441744.00
- 19. UNIT SERVICE FACTOR
.i8.63 18.63 67.40
- 20. UNIT AVAILABILITY FACTOR 10.63 10.63
'67.41
- 22. UNIT CAP. FACTOR (USING DER NET) 6.16 6.16 57.91'
- 23. UNIT FORCED OUTAGE RATE 74.16' 74.16-15.49
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Hone
- 25. IF SHUTDOWN AT'END OF REPORT PERIOD,. ESTIMATED?DATE'0F START UP: *
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY r----
INITIAL ELECTRICITY ZZ----
COMMERCIAL-OPERATION f2----
-- 2 ---
fThe projected online date is'indetermin. e while the necessary schedule revision and development for the increased work scope of IE Bulletin 79-02/14 modifications are in progress.
hN -
8502150613 850131 i.16 - 9 PDR ADOCK 05000261
/
R PDR g
~.
Piga 2~of 4 APPENDIX B AVERAGE DAILY POWER ~ LEVEL DOCKET NO. 050-0261-UNIT ROBINSON UNIT 2 DATE 02/01/85 COMPLETED'BY A. E. SCOTT TELEPHONE (803)383-4524
'ANUARY-1905 J
DAY AVG. DAILY POWER LEVELL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET)
.i
-13 17
-13 2
-21 18
-ii 3
-20 19
-7 4
~21 20
-7 5
-22 21
-7 6
-22 22
-7 7
-23 23-
-6' 8
-22 24
-7
-9
-14 25
-6 10 54 26
-7 11 156 27
-5 12 252.
28
-4 93 373 29
-4 14 373 30
-5 1
!i5 380 31
-4 16 22 4
.i.16 - 8 l
t
s 4
DOCKET NO. 050-0261 UNITSHUTDOWNS ANDPOhER REDUCTIONS UNIT NAME H. B. Robinson
,e DATE 850205 y
COMPLETED BY A.
E. Scott (D -
REPORT MONTH January TELEPHONE 803-383-4524 w
S w
e.
.5 E 3
Y Licensee
,Eg Cause & Corrective No.
Date g
3g fj
,;5 s $
unnt gg g3 Action to I-f=
jgg
- epori e mo U
Prevent Recurrence g
6 m
J 0101 850101 S
195.9 C
1 CJ llTEXCII Continuation of refueling and steam generator replacement outage. Unit returned on line 01-09-85.
0102 850109 F
17.92 G
3 Cll INSTRU See attached sheet.
0103 850110 S
11.78 B
1 IIA INSTRU Turbine Generator Overspeed Test.
0104 850116 F
518.4 11 1
Sll SUPORT Unit removed from line due to seismic restraint repairs.
Reanalyses of restraint performed to ensure that appropriate safety factors are maintained.
1 I
2 3
4 F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event ReporI (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 016I)
E-Operator Training & License Examination F-Administrative
'S G-Operational Error (Explain)
Exhibit I Same Source (9/77)
Il-Other (Explain) b s
1 e
4
~
hgn~4'o'f-4:;
x
_~
~
Attachment-for ' No. - 0102.-
Lev'el in "A" Steam Generator went high -while bringing. unit: up in load shortly aftericoming on line due to inability:to control swings in Steam Generator
-level quickly enough with feed regulator valves in manual control. As of this date, no cause has been determined.
4 7
i 1
1 4
)
5 3
l i
j I
a t
4 t
t
~
v, e
,w,
-.,-w e-,-.
,e r,+.,,,
,'> -, -.,~,.-,
e -
y
n-- -
v-- z Ak.
,k/.
E-CP&L Carolina Power & Ligtet Company ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 FEB - 81995 Robinson File :
15505 Serial: RNPD/85-322
(
Mr. Richard C.-DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electri Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of January,1985.
Very truly yours, R. E.
rgan General Manager H. B. Robinson SEG Plant AES/sr Enclosure oc:
R. A. Hartfield (2)
J. N. Grace (1)
-