ML20112H807

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1984
ML20112H807
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/31/1984
From: Morgan R, Scott A
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
RNPD-85-30, NUDOCS 8501180050
Download: ML20112H807 (1)


Text

D Encloun're fo Srrial: RUPD/05-30 ,

Pega 1 of 3 OPERATING DATA REPORT DOCKET NO. 050-0261 DATE 01/02/85 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524 OPERATING STATUS

1. UNIT NAME: ROBINSON UNIT 2 i NOTES Itere are presently 222 I
2. REPORTING PERIOD: DECEMBER 84 l Fuel Assemblics in the Spent Fuel  !
3. LICENSED THERMAL POWER (MWT): 2300 l Pool. I )
4. NAMEPLATE RATING (GROSS MWE) 739.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 700.0 l l 6.' MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 l l
7. MAX DEPENDABLE CAPACITY (NET MWE): 665.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE); none 3:0. REASONS FOR RESTRICTION I,F ANY: None 9

THIS YR TO CUMUL MONTH DATE ATIVE

1. HOURS IN REPORTING PERIOD 744.00 8784.00 121230.00
2. NUMBER OF HOURS REACTOR CRITICAi. .00 616.07 84197.30
3. REACTOR RESERVE SHUTDOWN HRS .00 145.68 1937.07
4. HOURS GENERATOR ON LINE .00 615.78 82065.95
5. UNIT RESERVE SHUTDOWN HOURS ,00 .00 23.20
6. GROSS THERMAL ENERGY GEN. (MWH) .00 783895.20 162875234.16
7. GROSS ELEC. ENERGY GEN. (MWH) .00 246010.00 52344876.00
8. NET ELEC. ENERGY GENERATED (MWH) -5879.00 190037.00 49409661.00
9. UNIT SERVICE FACTOR .00 7.01 67.69
0. UNIT AVAILABILITY FACTOR .00 7.01 67.71
1. UNIT CAP. FACTOR (USING MDC NET) -i.19 3.25 61.29
2. UNIT CAP. FACTOR (USING DER NET) -1.13 3.09 58.22
3. UNIT FORCED OUTAGE RATE .00 57.24 15.17
4. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): none
45. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF. START UP: 01-06-85
56. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)- FORCAST ACHEIVED INITIAL CRITICALITY --- Z--- -- !!---

INITIAL ELECTRICITY -------- --------

~ -

COMMERCIAL OPERATION -- ZZ--- -- ZZ---

agat!!88R0%8hSj!A ,

R 1.16 - 9

[y;gegoh*l3

  • APPENDIX B

' AVERAGE DAILY POWER LEVEL-DOCKET NO. 050-0261 UNIT ROBINSON UNIT 2

'DATE 01/02/85 COMPLETED-BY A. E. SCOTT TELEPHONE (803)383-4524 EECEMBER 1984 LAY- AVG. DAILY POWER LEVEL- DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -10 17 -5 2 -10 18- -5 3 -10 19 -5 4 -10 20 -4 5~ -i2 21' -5

'6 -12 22 -5 7 23 -5 8- -12 24- -10 9 -8 25 -10

30. -4 26 31 -5 27- -10

}2 -4 28 -10' 33' -4 29, . -10 34 -4 30 -12 3-5 -5 31 '-13 36 -5

')

e

$ f 1.16 - 8' I

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. nsn_n xi UNIT NAME H. B. Robinson DATE 850102 COMPLETED BY A. E. Scott REPORT MONTH December TELEPHONE 803-383-4524

":.C C

- 50 "E E3 Licensee E-t E% Cause & Cerrective No. Date h jj $ 3js Event

{~$ Action to I-f= $ j ;f3 g Report # vs O g Prevent Recurrence d

s 1201 841201 S 744 C 1 CJ IITEXC11 Continuation of refueling and steam generator replacement

, outage.

~.

s

\

i 2 3 4 F: Forced Reason: Method: Exhibit G - Inst ructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Lscensee C-Refueling 3 Automatic Scram. Event Report (LE R) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

,n E-Operator Training & Ucense Examination F-Administrative 5

'i G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) Il-Otter (Explain) n ,n E

n eAe

? *.

CD&L Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JAN .g;9g5 Robinson File No: 15505 Serial: RNPD/85-30 Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement 4

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT

Dear Mr. DeYoung:

In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of December, 1984.

i j Very truly yours, R

i General Manager H. B. Robinson S. E. Plant AES/tk

-Enclosure cc: R. A. Hartfield (2)

J. P. O'Reilly (1)

J t

. - .. _ - . --