Nonroutine Nonradiological Environ Rept 50-313/75-26:on 750421,samples at Intake & Discharge Show Turbidity in Discharge Canal to Be 200% Greater than Turbidity in Intake Canal.Caused by Sample Inaccuracy
ML19320A271
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/06/1975
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19320A257 List:
References
NUDOCS 8004210558
Download: ML19320A271 (3)


Text

/~'T l e *  %-) l m

/

Ns _,/ 1. Non-Routine, Non-Radiological Environmental ' Report No. 50-313/75-26

2. Report Date: 5/6/75 3. Occurrence Date: 4/21/75
4. Facility: Arkansas Nuclear One-Unit 1 Russellville, Arkansas
5. Identification of Oc'currenc.e:

Turbidity increase in plant circulating water exceeded Environmental Technical Sp'ecification limits per ETS 2.3.3 and ETS 4.1.1.a(4) .

6. Conditions Prior to Occurrence: --

Steady-State Power Reactor Power MWth Ibt Standby Not Output MWe Cold Shutdown X Percent of Full Power  %

Refueling Shutdown Load Changes During Routino Power Op' e ration

(}

\ w' /

Routino Startup Operation -

Routine Shutdown Operation Other (specify)

Plant shut down for maintenance.

7. Description of Occurrence:

~;

Sampics taken at intake and discharge show that turbidity in the discharge canal.was 200% greater that turbidity in the intake canal (intake - 10 JTU,

' discharge - 30 JTU).

~

,/ - BOO $ 210

\_)

bbrch 4, 1975 NSP-10, Rev. 2 Page 2 of 4 -

N Non-Routine, Non-Radiological Environmental Report No. 50-313/75-26 i

n

8. Designation of Apparent Cause of Occurrence: ,

a Design Procedure j l

Manufacture . Unusual Service Condition Including Environmental .

l Installation / _,

Construction Component Failure ,

Operator 4 Other (specify) _

Sample inaccuracy.  !

l J

'9. Analysis of Occurrenec:

It is believed that sanrples taken were not truly representative of lake conditions; taerefore, occurrence is not realistic. Four circulating water pumps were running at time of sample collection and no liquid releases were in progress. No trash grinding was'in progress. ,

i

~

O March 4, 1975 NSP-10, Rev. 2 Page 3 Of 4 O S x

9

- o c, .~

} . .

A I-Non-Routine, Non-Radiological Environmental Report No. 50-313/75-26 4

10. Corrective Action:

' Turbidity and conductivity tests will be performed as soon as possible following sample collection in the future to interrogate results.

_ Questionable.results will b,e verified by resampling. In addition, testing is being done to verify sample accuracy.

i 1

l I

i

! l l

l l

i 11. Failuro Data:

i i

Y 6 i

l 4

i .

i.

, . ~l 1

1 s

9 i

4

)

March 4, 1975 NSP-10, Rev. 2 Page 4 of 4 Yy--g r-ww ye3 --

g"e-y.-m -g-.-- e-- ,.c y-gy------y-.-- -- ~q-- we, -----w g----e a.-m--yg-- 3 --- , 4 gem- ---- - - - -g..v*m-pc-a av er y