|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEAR0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With 0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with 0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with ML20196A0191999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With 0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with ML20205R6351999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ano,Units 1 & 2. with 0CAN039904, Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with ML20199F0351998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ano,Units 1 & 2 ML20198D2441998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ano,Units 1 & 2. with 0CAN119808, Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with 0CAN109806, Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with 0CAN099803, Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with 0CAN089804, Monthly Operating Repts for July 1998 for Ano,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ano,Units 1 & 2 ML20236R0531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ano,Units 1 & 2 0CAN069802, Monthly Operating Repts for May 1998 for ANO Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for ANO Units 1 & 2 ML20236R0781998-05-31031 May 1998 Correction to Monthly Operating Rept for May 1998 for ANO, Unit 2 0CAN059805, Monthly Operating Repts for Apr 1998 for Ano,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ano,Units 1 & 2 0CAN049802, Monthly Operating Repts for Mar 1998 for Arkansas Nuclear One,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Arkansas Nuclear One,Units 1 & 2 ML20217B1131998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 0CAN029805, Monthly Operating Repts for Jan 1998 for Ano,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Ano,Units 1 & 2 ML20217B1181998-01-31031 January 1998 Revised Monthly Operating Rept for Jan 1998 for Ano,Unit 1 0CAN019804, Monthly Operating Repts for Dec 1997 for ANO Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for ANO Units 1 & 2 ML20197J0851997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for ANO Units 1 & 2 ML20199D3841997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Arkansas Nuclear One,Units 1 & 2 0CAN109703, Monthly Operating Repts for Sept 1997 for Arkansas Nuclear One,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Arkansas Nuclear One,Units 1 & 2 0CAN099702, Monthly Operating Repts for Aug 1997 for Arkansas Nuclear One Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Arkansas Nuclear One Units 1 & 2 0CAN089704, Monthly Operating Repts for Jul 1997 for Arkansas Nuclear One1997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Arkansas Nuclear One 0CAN079706, Monthly Operating Repts for June 1997 for Arkansas Nuclear One,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Arkansas Nuclear One,Units 1 & 2 0CAN069703, Monthly Operating Repts for May 1997 for Arkansas Nuclear One (Ano),Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Arkansas Nuclear One (Ano),Units 1 & 2 0CAN059705, Monthly Operating Repts for Apr 1997 for Arkansas Nuclear One Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Arkansas Nuclear One Units 1 & 2 0CAN049705, Monthly Operating Repts for Mar 1997 for Arkansas Nuclear One,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Arkansas Nuclear One,Units 1 & 2 1CAN039706, Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 11997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 1 2CAN039703, Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 21997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Arkansas Nuclear One,Unit 2 1CAN029703, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 11997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 1 2CAN029708, Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 21997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Arkansas Nuclear One,Unit 2 2CAN019703, Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 21996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 2 1CAN019702, Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Arkansas Nuclear One Unit 1 2CAN129608, Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 21996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 2 1CAN129603, Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Arkansas Nuclear One-Unit 1 1CAN119602, Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 1 2CAN119605, Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 21996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Arkansas Nuclear One,Unit 2 2CAN109604, Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One-Unit 21996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One-Unit 2 1CAN109607, Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Arkansas Nuclear One Unit 1 2CAN099606, Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One,Unit 21996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One,Unit 2 1CAN099602, Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One Unit 11996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Arkansas Nuclear One Unit 1 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 1CAN089603, Monthly Operating Rept for July 1996 for ANO-11996-07-31031 July 1996 Monthly Operating Rept for July 1996 for ANO-1 2CAN089607, Monthly Operating Rept for July 1996 for ANO-21996-07-31031 July 1996 Monthly Operating Rept for July 1996 for ANO-2 2CAN079605, Monthly Operating Rept for June 1996 for ANO-unit 2.W/1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for ANO-unit 2.W/ 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8931999-10-31031 October 1999 Rev 1 to BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20212L1141999-10-0101 October 1999 Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c 0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20216J6271999-09-27027 September 1999 Rev 0 to CALC-98-R-1020-04, ANO-1 Cycle 16 Colr ML20212F5261999-09-22022 September 1999 SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1 0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with ML20211F4281999-08-25025 August 1999 Safety Evaluation Concluding That Licensee Provided Acceptable Alternative to Requirements of ASME Code Section XI & That Authorization of Proposed Alternative Would Provide Acceptable Level of Quality & Safety 0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with ML20210K8831999-07-29029 July 1999 Non-proprietary Addendum B to BAW-2346P,Rev 0 Re ANO-1 Specific MSLB Leak Rates 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with ML20207E7231999-06-0202 June 1999 Safety Evaluation Authorizing Proposed Alternative Exam Methods Proposed in Alternative Exam 99-0-002 to Perform General Visual Exam of Accessible Areas & Detailed Visual Exam of Areas Determined to Be Suspect ML20196A0191999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With ML20196A6251999-05-31031 May 1999 Non-proprietary Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs ML20195D1991999-05-28028 May 1999 Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14 ML20206M7711999-05-11011 May 1999 SER Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with ML20206F0691999-04-29029 April 1999 Safety Evaluation Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 ML20205M6941999-04-12012 April 1999 Safety Evaluation Granting Relief for Second 10-yr Inservice Inspection Interval for Plant,Unit 1 ML20205D6061999-03-31031 March 1999 Safety Evaluation Supporting Licensee Proposed Approach Acceptable to Perform Future Structural Integrity & Operability Assessments of Carbon Steel ML20205R6351999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ano,Units 1 & 2. with ML20205D4711999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Employ Alternative Welding Matls of Code Cases 2142-1 & 2143-1 for Reactor Coolant System to Facilitate Replacement of Steam Generators at Arkansas Nuclear One,Unit 2 ML20204B1861999-03-15015 March 1999 Safety Evaluation Authorizing Licensee Request for Alternative to Augmented Exam of Certain Reactor Vessel Shell Welds,Per Provisions of 10CFR50.55a(g)(6)(ii)(A)(5) 0CAN039904, Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with ML20212G6381999-02-25025 February 1999 Ano,Unit 2 10CFR50.59 Rept for 980411-990225 ML20203E4891999-02-11011 February 1999 Rev 1 to 97-R-2018-03, ANO-2,COLR for Cycle 14 ML20199F0351998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ano,Units 1 & 2 ML20198M7841998-12-29029 December 1998 SER Accepting Util Proposal to Use ASME Code Case N-578 as Alternative to ASME Code Section Xi,Table IWX-2500 for Arkansas Nuclear One,Unit 2 0CAN129805, LER 98-S02-00:on 981124,security Officer Found Not to Have Had Control of Weapon for Period of Approx 3 Minutes Due to Inadequate self-checking to Ensure That Weapon Remained Secure.All Security Officers Briefed.With1998-12-11011 December 1998 LER 98-S02-00:on 981124,security Officer Found Not to Have Had Control of Weapon for Period of Approx 3 Minutes Due to Inadequate self-checking to Ensure That Weapon Remained Secure.All Security Officers Briefed.With ML20196F4911998-12-0101 December 1998 SER Accepting Request for Relief ISI2-09 for Waterford Steam Electric Station,Unit 3 & Arkansas Nuclear One,Unit 2 ML20198D2441998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ano,Units 1 & 2. with ML20199F7401998-11-16016 November 1998 Rev 9 to ANO-1 Simulator Operability Test,Year 9 (First Cycle) ML20195B4801998-11-0707 November 1998 Rev 20 to ANO QA Manual Operations ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program 0CAN119808, Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with ML20197H0741998-10-29029 October 1998 Rev 1 to Third Interval ISI Program for ANO-1 ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML17335A7641998-10-22022 October 1998 LER 98-004-00:on 980923,inadvertent Actuation of Efs Occurred During Surveillance Testing.Caused by Personnel Error.Personnel Involved with Event Were Counseled & Procedure Changes Were Implemented.With 981022 Ltr ML20154J2471998-10-0909 October 1998 SER Accepting Inservice Testing Program,Third ten-year Interval for License DPR-51,Arkansas Nuclear One,Unit 1 0CAN109806, Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for ANO Units 1 & 2. with ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods 0CAN099803, Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for ANO Units 1 & 2. with ML20237B7671998-08-19019 August 1998 ANO REX-98 Exercise for 980819 ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed 0CAN089804, Monthly Operating Repts for July 1998 for Ano,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ano,Units 1 & 2 ML20196C7831998-07-30030 July 1998 Summary Rept of Results for ASME Class 1 & 2 Pressure Retaining Components & Support for ANO-1 ML20155H7161998-07-15015 July 1998 Rev 1 to 96-R-2030-02, Revised Reactor Vessel Fluence Determination ML20236R0531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ano,Units 1 & 2 ML20249B7791998-06-22022 June 1998 Part 21 Rept Re Findings,Resolutions & Conclusions Re Failure of Safety Related Siemens 4KV,350 MVA,1200 a Circuit Breakers to Latch Closed ML20249B5091998-06-15015 June 1998 SG ISI Results for Fourteenth Refueling Outage 1999-09-30
[Table view] |
Text
.. . , _ . , ... . .. . .. .
1 l
t o'
y Entergy Operations,Inc.
1448 S.R. 333 RusselMile, AR 72801 4
, Tel 501858-5000 J l
l December 15,1998 l
OCAN129807 U.'S Nuclear Regulatory Commission Document Control Desk Mail Station OPI-17 Washington, DC 20555
- Subjecti Arkansas Nuclear One - Units 1 and 2 i Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Monthly Operating Report Gentlemen:
Arkansas Nuclear One (ANO), Units 1 and 2 Technical Specifications 6.12.2.3 and 6.9.1.6, respectively, require the submittal of a Monthly Operating Report. The purpose of this letter
,is to complete the reporting requirement for November 1998.
l Very truly yours,
/ J. D. V nder 'A Director, Nuclear Safety JDV/eam attachment 9812230046 981130
+
PDR ADOCK 05000313 .
R PDR L ;
c I l
l l- :
? -
l- . .
U. S. NRC December 15,1998
'. OCAN129807 Page 2 j- cc: Mr. Ellis W. Merschoff Regional Administrator.
U. S. Nuclear Regulatory Commission Region IV L 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
- NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. Nick Hilton NRR Project Manager Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 0-13-G-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Chris Nolan i NRR Project Manager Region IV/ANO-2 'i U. S. Nuclear Regulatory Commission >
NRR Mail Stop 0-13-G-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 i
i
, - , , . - - _ - ~ -,-.---
'. ~
Arkansas Nuclear One Unit 1 Monthly Operating Report l
, . - - , . . - -~ -.--. . - - - _ - . - .. - - - - -. .. ..
OPERATING DATA REPORT DOCKET NO: 50-313 UNIT: ANO Unit 1
, DATE: December 15,1998 i COMPLETED BY: Steve Coffman TELEPHONE: (501) 858-5560 OPERATING STATUS
- 1. Unit Name: Arkansas Nuclear One - Unit 1
- 2. Reporting Period: November 130
- 3. Licensed Thermal Power (MWt): 2,568
- 4. NWe Rating (Gross MWe): 903 l _ 5. Design ElectricalRating(Net MWe): 850 l 6. Maximum dmo Capacity (Gross MWe): 883
- 7. Maximum Dependable Capacity (Net MWe): 8_3_6 3
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 1 l
- 9. Power Ievel To Which Restncted. If Any (Net MWe): 1
- 10. ReasonsForRestricuons if Any:
I MQEW YR-TO-DATE CUMULATIVE l
l 11. Hours in Reporting Pened 720.0 8,016.0 209,947.0 l 12. Number of Hours Reactor Was Critical 720.0 6.830.0 160,085.6 l- 13. Reactor Reserve Shutdown Hours 0.0 0.0 5,044.0 l 14. Hours Generator On-Line _
720.0 6,779.4 157,598.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 817.5 l 16. Gross Thermal Energy Generated (MWH) 1,847,856 - 17,266,502 370,651,254
- 17. Gross Electncal Energy Generated (MWH) 645,056 5,977,130 124,6 % ,002
- 18. Net Electrical Energy Generated (MWH) 619,206 5,717,401 118,753,737
- 19. Unit Scavice Factor 100.0 84.6 75.1
- 20. Unit AvailabilityFactor 100.0 84.6 75.5
- 21. Unit Capacity Factor (Using MDC Net) 102.9 85.3 67.7
- 22. Unit Capacity Factor (Using DER Net) 101.2 83.9 66.5
- 23. Unit Forced Outage Rate 0.0 2.7 9.1
- . 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
l 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06n4 INITIAL ELECTRICITY 08/17n4 j COMMERCIAL OPERATION 12/19n4 4
Vg e +v- .-e v- -
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50 313 UNIT: ANO Unit 1 DA'IE: December 15,1998 COMPLETED BY: Steve Coffman TELEPHONE: (50l) 858 55(4 MONTH November 1998 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 1.................... s5e 2 . . . ... . a58' 3 858 4................. s58 5 . . . . . .. 859 6e . s59 7- . . . . . 859 8- 859 9............ . . . . . . 860 10 , ... 860 1 1 .. . .. ... ... 860 12 . . . . . . . . . . . . 860 13 .. .... .. . . . . . . . . . . . . 852 14 .. ....... 858 15...................... 859 16...................... 861 17 .. .. .... . .. 862 18 ... . .. a62 19.......... 862 20.............. . . . . . . . . 362 21..................... 861 22...................... 862 2 3 . .. .. . . .. . ... . 862 24.................. s61 25 - . . . . . 861
- 26. . 862
- 27. . . . . 861 28- . . . . . . . R61 29 . ... .. . . . 861 30................... a61 AVGS: 860 INSTRUCTION On this format, list the average daily unit power level in MWe-Net for each day in reporting month.
Complete to the nearest whole megawatt.
i UNIT SHUTDOWNS AND POWER REDUCTIONS ;
REPORT FOR NOVEMBER 1998 f DOCKE1NO. 50-313 l UNIT NAME ANO Unit i DATE December 15,1998 !
COMPLETED BY Steve Cof5nen TELEPHONE 501-858-5560 F
L METHOD OF LICENSEE I DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO
!!$h DAH I R E' (HOURS) REASON 2 REACTORS REPORT 8 Eglg8 Egigs PREVENT RECURRENCE I F
t i
6
?
1 2 3 4 F: Forced Reason: Methed: Exhibit G -Isotructises S: Scheduled A- Equipament Failure (Explais) 1 - Meeuel for Properaties of Data j B - Meistemence of Test 2 - Manuel Scromo Entry Sheets for IJceasse C -Refhelleg 3 - Autennetic Screen. Event Report (LER) Fue (NUREG-4161)
Ib Regulatory Restriction 4 - Contieuntion E - Operater Talesing & IJcesse Esseninetion 5-Imed Reducties F- Adveinistration 9 - Other 5 G-Operatseest Error Exhibit I- Samme Source H - Other(Emplain)
1 NRC MONTIILY OPERATING REPORT )
OPERATING
SUMMARY
NOVEMBER 1998 UNIT ONE The unit began the month operating at 100% power. At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br /> on the thirteenth, a power ;
reduction to 85% was commenced for the monthly turbine governor valve testing. Following the !
completion of the monthly turbine governor valve test, the unit was returned to 100% power at 2320 hours0.0269 days <br />0.644 hours <br />0.00384 weeks <br />8.8276e-4 months <br /> that same day. The unit operated the remainder of the month at full power.
There were no challenges to the primary system code safeties nor automatic actuations of the i electromatic relief valve during this reporting period.
l
Reporting Period: November 1998 REFUELING INFORMATION
- 1. Name of facility: Arkansas Nuclear One - Unit 1
- 2. Scheduled date for next refueling shutdown: September 10.1999
- 3. Scheduled date for restart following refueling: October 14.1999
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what, in general, will there be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee (PSC) to determine whether any unreviewed safety questions are associated with the core reload (Ref.10CFR Section 50.59)?
There are no reload rg.latsdjgchnical specification channes identified for the refueline ontana. He reload reoort for the next fuel cycle has not vet been rengw_qd by PSC.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
N1%
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None olanned
- 7. He number of fuel assemblies (a) in the core, (b) in the spent fuel storage pool and (c) dry cask storage:
a)lll b) 818 c) 48
- 8. He present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
present 268 increase size by 0
- 9. He projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Full core off-load capability is no lonner available until a sufficient amount of spent fuel can ts placed in on-site dry storanc,
I 1
l I
1 Arkansas Nuclear One !
1 l
Unit 2 l Monthly Operating Report I
, . _ _ _ . __ .- - _ . _ - _ . . _ - . _ . _ . - . . _ _ - - - . ~ . _ . _ . _ . _ . - . . _ _ _ _ . _ _ . . _ _ _ . . - . . . - _ _
' OPERATING DATA REPORT DOCKET NO: 50-368 I
UNIT: ANO Unit 2 DATE: December 15,1998 COMPLETED BY: Steve Coffman i TELEPHONE: (501) 858-5560 OPERATING STATUS
- 1. Unit Name: Arkansas Nuclear One - Unit 2
- 2. Reporting Period: November 1-30 !
- 3. Licensed ThermalPower(MWt): 2,815 l
- 4. Nameplate Rating (Gross MWe): 942.57 l
- 5. _ Design Electncal Rating (Net MWe): ,8% l
- 6. Maximum Dependabi: Capacity (Gross MWe); 897 7, Maximum Dependable Capacity (Net MWe): 858'
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons ;
a i
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restnctions If Any:
MONTH YR-TO-DATE CUMULATIVE
.11. Hoursin Reporting Period 720.0 8,016.0 163,776.0
- 12. Number of Hours Reactor Was Critical 720.0 7,265.7 130,843.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 7,251.8 128,594.1
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2,025,839 20,194,284 344,577,734
- 17. Gross Electncal Energy Generated (MWH) 664,748 6,565,944 113,608,691
- 18. Net Electrical Energy Generated (MWH) 635,358 6,259,934 108,161,527
- 19. Unit Serrice Factor 100.0 90.5 78.5
- 20. Unit Ave . lability Factor 100.0 90.5 78.5
,4
- 21. Unit Capacity Factor (Using MDC Net) 102.8 91.0 77.0
- 22. Unit Capacity Factor (Using DER Net) 96.8 85.6 72.4
- 23. Unit Forced Outage Rate 0.0 2.2 9.I
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling outase 2R13 scheduled to commence January 8,1999 with an expected duration of 45 days
- 25. If Shut Down At End of Report Penod Estimated Date of Startup:
- 26. Units in Test Status (Pnor to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 12/0$ns l INITIAL ELECTRICITY 12/2608 COMMERCIAL OPER3 TION 03/26/80 j
I s
J
s AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-368 UNIT. ANO Unit 2 DATE: December 15.1998 l COMPLETED BY: Steve Comnan !
TELEPHONE: (501) 858-5560 'I MONTH Hmsmber 1998 DAY AVERAGE DAILY POWER LEVEL j (MWe-Net) I 1 . .. . . . . 879 2....................... as2 3..................... as2 ;
4 ... 883 1 5 . . .. . . . . . . . . . . , as4
- 6. . . . .. ass
- 7. ....... ..... . 885
- 8. . . . . . . . . 884 9... . . . . . 882 10 . . . ....... . . . . . . . . . as2 !
11.. ... 885 12 .. .... . . . . . . . . . ass 13 = . 384 14 ... . .. . . ... . . . . s83 15......................... as2 16.................... 882 17- as3 18 - . . . . . 882 19 ......... ... as1 20....................... as4 21..................... as4 22.................... as3 23...................... as1 2 4 .. .. .. . . . . 881 25... .. . 881 26 ..... .. . 883 27 ... . . . . . . . as2
?R. . . . . . . . sao 29.. ..... 879 30 . . . .. . . . . ast AVGS: 882 INSTRUCTION On this fonnat, list the average daily unit power level in MWe-Net for each day in reporting month.
Complete to the nearest whole megawatt.
l I
l
UNIT SHUTDOWNS AND POWER REDUCTIONS -
REPORT FOR NOVEMBER 1998 DOCKET NO. 50-368 UNIT NAME ANO Unit 2 DATE December 15,1998 COMPLETED BY Steve Coffman TELEPHONE 501-858-5560 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO Eg- PAIX Iyf1' SOURS) REASON 8 REACTOR' BF.tPEU EDDF CODES PREVENT RECURRENCE meme 1 2 3 4 F: Forced Reesen: Methat Exhibit G -Instructices 5: Scheduled A - Equipment Failure (Explain) 1 - Memeal for Preparation of Data B - Mainiemance of Test 2 - Manu6 i Scram. EntrySheets forIJceasee C- Refueling 3 - Automa* Screma. Event Report (LER) Flie (NUREG-0161)
D- Reguletory Restriction 4 - Contines ties E - Operator Troising & IJcease Enemination 5- Imed Reduction F - Admielstration 9 - Other 5 G - Operatiesel Error Exhibit I-Some Source H - Other (Emplais)
______-__-___a
e NRC MONTIILY OPERATING REPOL OPERATING
SUMMARY
NOVEMBER 1998 UNIT TWO The unit operated the entire month at 100% power.
There were no challenges to the primary system code safeties nor automatic actuations of the low temperature overpressure protection valves during this reporting period.
.. - . - . . . - . - . . - - . . - - . -- .- - . - ~ . - . . - . . = .- - -
C' - .
Reporting Period: November 1998 REFUELING INFORMATION
- 1. Name of facility: Arkansas Nuclear One - Unit 2
- 2. Scheduled date for next refueling shutdown: January 8.1999
- 3. Scheduled date for restart following refueling: February 22.1999
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? If answer is yes, what, in general, will there be? If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee (PSC) to determine whether any unreviewed safety questions are associated with the core reload (Ref.10CFR Section 50.59)?
The MSSV/PSV setooint tolerance technical specification channe has been identified for the refuelina outane. Also. the reload report for the next fuel cycle has not yet been reviewed by PSC.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information:
Eb
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new {
operating procedures. '
i None olanned
- 7. The number of fuel assemblics (a) in the core (b) in the spent fuel storage pool and (c) dry cask storage:
a)122 b) 613 c).L43
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
present 288 increase size by 0
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
DATE: January 1999 doss of full core off-load capability)