i C's
.l.-
U f
\\
1.
Non-Routine, Non-Radiological Environmental Report No. 50-313/75-27 2.'
Report Date:
5/6/75 3.
Occurrence Date:
4/28/75 4.
Facility:
- Arkansas Nuclear One 'Ini: 1 Russellville, Arkansar 5.
Identification of' Occurrence:
Turbidity increase in plant circulating water exceeded Environmental' Technical Specification limits. per ETS 2.3.3 and ETS 4.1.1.a(4),
f j
6.
Conditions Prior -to Occurrenec:
- 4 r
Steady-State Power Reactor Power MWth i
llot Standby Not Output Mwe r
- Cold Shutdown X
Percent of Full Power
- 6 Refueling Shutdown Load Changes During Routine Power Operation Routine Startup Operation Routino Shutdown Operation Other (specify) 1 5
Plant shut down for maintenance.
i 8
j i
7.
Description of Occurrence:
Samples taken at intake and discharge show that turbidity in the discharge canal was 66.6% greater than turbidity in the intake canal (intake - 15 JTU, l
discharge - 25 JRJ).
D**D D
3' Y 4 c c.Ju 'cJusk J
_ry
- 2 O
March 4, 1975-NSP-10/ Rev. 2 Page 2 of 4 e
m
--~0-m w%,__
-wp-yw w,9e,--
y-
,,e-w m
,w-yv-r-9 9
,www-,,
--e w-g-ge--o-
N
~
1 wM Non-Routine, Non-Radiological Environmental Report No. 50'-313/75-27 ie 8.
Designation of Apparent Cause of Occurrenec:
Design Procedurc Manufacture Unusual Service Condition Including Environmental Installation /
Construction Component Failure Operator Other (specify).
l Sample inaccuracy.
l-I 4
9.
Asialysis of Occurrence:
Original sample was taken with four circulating water pumps running and neutralizing tank dump in progress. No trash grinding was in progress.
Additional. sample was taken (after results from original sample became known) with no liquid releases in progress and no trash grinding, Results show a 11.1% increase in turbidity for no anparent reason.
t-8 1
4 i-March 4,~1975
-NSP-10, Rev. 2 Page 3 Of 4 i~
1
f:J
'r.
Ii' l
Non-Routino, Non-Radiological. Environmental Repor't No.- 50-313/75-27 i
10.
Corrective Action:
Testing is being done to verify that samples are truly representative 'of l.
lake conditions.
l' l
i j
i' I
i
. Failure Dath:
11.
t l'
f I
I j
s-i 4
1 I.
l-
[
l l 0
-March 4 1975 NSP-10, Rev. 2 Page 4 of 4