1 UCENSEE EVENT REF 1T  !

1 CONTROL BLOCK:l l l l l l l (MAASE MIMfT ALL M NTWN]

1 6

,'."' tce~se Nuuena "MN' '#4'  !

l AIRI A IRlw I t I lo 101-10 lo lo lo 101-10 lo I 14IiliIsIil lojal 7 89 14 15 25 28 30 31 32 cAftcony ryPE e"En$ cocutt Nuusta tVENT OAft HEPORT DAtt O 1 CONT l 7 8 57 l

58 l [L_] lL l 101Sl0l-1013lf13I lo l( 10 lE l T 17 I lo ll l o l l 1717 l 59 60 61 68 69 74 75 30 l EVENT DESCRIPTION HE l b sTraarr-STATE Powet boo'if P). A V.Emerae beLDIred 6 wa FAN W As Foo 94O To Ett  !

7 89 80 BE I wouwm. As mm, w rawa semaus. as-sit eum To tean ewa ss. I 7 89 80 EE I usum weues %.u. s tocToe suicain wat %s Wm-\ A me \s.

7 89 I

80 20 ! k itMWs4T 5 YSTim W e W Ait.Aa L C % C Put nat.c . T 4 W 15 MOT A %.EPET1 Tid I 7 89 80 EE I o o=e..wx. L h. wu e_ w.o we amu. To rwe wuoen. voe esam. I

^ '

Eo'a* cc"o'n' COMPONENT COCE Mmuracn a vaA O

15 IB I [.5.] 16 It lo IWis I e.1 [}_J l e.1 s I r. Is i LN_J 7 89 10 11 12 17 43 44 47 48 CAUSE DESCAIPTION 8 l k (s.Ligast $GCTit.w bmf Amy' McTolt. TAgteo Dot To \ sonsegator t.,0 6 AAC 4T i e d  !

7 89 80 0 1 % =. ,:w t %xot b an.ie u . AvT.:.s. m u woe u waan wo esvoa.nss By I 7 89 80 0 l Tug h @ cod,kwe QtAcqy y qgggety, hg.,1, peect pa, 3 w g t t, gavg T gg Stggay($ l 89 g,%TC* 'd

  • . H 4Qc w T sc.ww. outs.,,,,gog, 80 stafus  % POwtA OTHER Status CrScovtav CGCOVERY OtSCRIPTcN 1 Isl lilolol I wn I Lb.J l wx I 7 8 9 10 12 13 44 45 46 80 a'atrYs'c'o or NEAst aucuNT or actmiv tocArcs or netsass 12 13J 1  %

1.1) l I  % l 7 8 3 10 11 44 45 80 PEASONNEL EXPOSURES Nuusen type casca.PfcN i 101olol L4J l 9A I 7 89 11 12 13 80 PERSONNEL INJURIES NuustR DEsCRipTON 1

7 89 lololol I aw I 11 12 80 OFFSITE CONSEQUENCES EU l NA i 7 89 80 LOSS OR DAMAGE TO FAC:UTY tvPE DESCRepfCN

[pgj MA i

7 89 l

10 I-80 PUBLICITY 17 QA 7 89 80 ADDITIONAL FACTORS I wA g o 04110 [J7 09 i 80 -

7 89 NiuE: be C. beou , san, Soi f rtt-44 %

GPO set.egy

L- Reportable Occurrence P.cport No. '

50--313/77-13

2. Report Date: July 1, 1977 3. Occurrence Date: June 2, 1977 4 Facility: Arkansas Nuclear One-llnit 1 Russellville, Arkansas 72801
5. Identification of Occurrence:

The failure of a Reactor Building cooling fan which is a condition leading to operation in a degraded mode pemitted by a limiting condition for operation (Technical Specification 3.3.4). .

6. Conditions Prior to Occurrence:

, Steady-State Power y Reactor Power 2568 MWth Hot Standby Net Output 805 MWe Cold Shutdown Percent of Full Power 100 %

Refueling Shutdown load Changes During Routine D Power Operation Routine Startup _

Operation Routine Shutdown ~

Operation Other (specify)

7. Description of Occurrence: -

At 2159 hours0.025 days <br />0.6 hours <br />0.00357 weeks <br />8.214995e-4 months <br /> on June 2,1977, Feeder Breaker B5-512 opened to Load Center B5, which supplies power to Reactor Building Cooling Fans VSFM- 1A 618. An investigation and meggering of both fan motors indicated grounded phase windings in VSFM-1A after which Load Center B5 was re-energized. The tripping of Breaker B5-512 indicated that selective tripping did not occur since .

Breaker 52-523 (feeder breaker to VSFM-1A) should have tripped.

V _

_ , ,n,-~

~

m. . .

C\ Reportabic Occurrence Report No. 50-313/77-13

8. Designation of Apparent Cause of Occurrence:

Design Proc'e dure Manufacture Unusual Service Condition Including Environmental Installation /

Construction Component Failure X (See Failure Data)

Operator

. Cther (specify) X The motor bearings had insufficient lubrication.

9. Analysis of Occurrence:

Since a safety analysis was performed for operation with less than 4 RB cooling fans and the subsequently approved technical specification changes allow 2- cooling units to be operable and powered from independent busses, there was no hazard to the health and safety of the public.

e l

d b

i i

t r 1

%._/ q l

l

+ .

l

.- - , , . ,- -- - . - _..- - 1

. . m_

V Reportable Occurrence Report No. 50-313/77-13

10. Corrective Action:

The motor was removed and shipped to the vendor. (Reliance Electric

-Company) to be rebuilt. The remaining 3 fan unit's bearings were lubricated and will be placed on a more frequent lubrication schedule.

. The bearings in at least one of the redundant fans will be inspected by the end of the next refueling outage. A breaker test was performed on Breaker 52-523 which indicated that the trip had drifted high. A Preventive Maintenance Program is being established to test all vital 480 volt circuit breakers and calibrate all overcurrent relays.

N

11. Failure Data:

Fan Motor: VSFM-1A, 480 volt, 125 HP, 1800 RPM, 60 cycle, 3 phase induction motor, fram design 7DB-5003, Reliance Electric Company.

Circuit Breaker: 52-523, 480 volt, 225 AMP ACB, Trip Coil Model OD-5, ITE Manufacturer.

G V _