RO 50-313/77-10:on 770331,leak Rate Test Improperly Performed on Reactor Bldg Escape Hatch.Caused by Personnel Error Failing to Check Cavity Between Hatch Doors.Hatch Retested & Found Acceptable
ML19317H068
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/29/1977
From: Mardis D
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19317H067 List:
References
NUDOCS 8004110840
Download: ML19317H068 (4)


Text

-

.'t.'.l UCENSEE EVENT REF AT

~e CONTRot StoCx:1 I

I I

I I

I cnaasa==rrnu.assummeswommaanaq

'ti "'

"R#'

'"v."'

ucr~n Nuun.

f 01 l A l tlk 19. lK l t I lolol-lo lolo lo lol-lo lo l 14 l 1 l 1I t I1 I lo Is l 7 C9 14 15 25 26 30 31 32 CATEGCav Typg DCCKET NUM8ER EVENT OATE REPORT Daft 01 CONT l l

l

[L_)

l L. l 1013 lo l-1013 l t l.3 l 101313 Ii 17 l 71 10141119 17171 7 8 57 58 59 60 61 88 69 74 75 W3 EVENT DESCRIPTION 36 1 DORWIC h MEATu9 FocteuJa 9.EFUE.LMa \\T \\ Jam OM eeus.t.ED W 4T A LEAY-ME I

7 89 80 3! I TEST 9t1Fetmtb ou me LEAcTo st.

801t 014 4 EstAPC WRTeu MAD REED IfhbPEE2bY 7 89 80 3E l kTOf.mED L 't' 9tAH1" 9E"125c4%T.L, Yu\\1 kneet ubT A El?YT1'fWG OCf.OGIE N Y.

F 89 80 C50 -3t3h 1-te) l l L wArea ww erusrto Ar4e veoso Te sc wr9Txa ct.

0 F 09 80 hl l

7 89 80 1 pnue o

CcOE COMPONENT COOg MANUFACTUMI VOLAfCN O

isiti ULI 17 la IE isl:E l al E.]

17 l I

I 'l Lij F 89 10 11 12 17 43 44 47 48

)

CAUSE DESCAIPTION l b W Ls eg Scygg g o e g.s e g gg gscaps MATo4 WAD REM OMEcyEDgT 1hE I

8 J

7 89 80 09 l 6eTy QE N CE'4 TAtt DoctS NAD mbt 9AEA CLECKID h8; 9.E OG RY.D.

d.t od-I 89 ao l l To h h.A.T svaero9 epa.,rrie4. \\we ec,c4,.m saas eaoseo u Tae FAiti)er l

g,etaar 9.asem1. To c wurva wc gga,y,osv. vor ws uu. Turi % w ms esces wM. !

89 STATUS

% POWER OTHER STATUS CtsCOVEAY OSCOVERY DESCRATCH laj lololo l I u

I Lhl I

e I

i F 0 9

10 12 13 44 45 48 80 4717to & W ise

.Mou~r e, actor, teCiTCN a, peuAs, LE.]

[EJ l

un i

I a

l

'a 7 8 9

10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYpf CESCApfCN E loloie l L.5j l

ux l

7 89 11 12 13 80 PERSONNEL INJUAIES NUM8ER CESCApfCN E le lo l ol I

sw I

7 89 11 12 80 OFFSITE CONSEQUENCES BE l W 4, 1

7 89 80 LOSS OR DAMAGE TO FAC:LITY fvPE DESCAPTCN 1

l l.

7 89 10 80 PU8UCITY s

I h

I 7 89 80 8004110[yC ADDITIONAL FACTOAS 7 89 80 8I l

7 89 i

NAME:

the C. M4to

50'/nl -4%

PsONE:

/

spo ses.eef

~

.. g 1.

Reportable Occurrence Report No. 50-313/77-10 2.

Report Date: April 29, 1977 3.

Occurrence Date:

March 31,1977 4

Facility:

Arkansas Nuclear One-Unit 1 Russellville, Arkansas 72801 S.

Identification of Occurrence:

The occurrence is the failure to perform a complete surveillance test at the required frequency.

6.

Conditions Prior to Occurrence:

- ~ '

Steady-State Power Reactor Power o

MWth 4

Hot Standby Net Output 0

MWe Cold Shutdown Percent of Full i'ower o

Refueling Shutdown Load Changes During Routine Power Operation Routine Startup

~

Operation Routine Shutdown Operation Other (specify)

X Starting Plant Heatup Following Refueling 7.

Description of Occurrence:

}

At approximately 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on March 31, 1977, a leak rate test performed on the Reactor Building Escape Hatch on March 19, 1977, was found to have been improperly perfomed by an instrument technician. This is a test required to establish Reactor Building integrity per Tech. Spec. 3.6.1.

The reactor was at 2000F at 0935 hours0.0108 days <br />0.26 hours <br />0.00155 weeks <br />3.557675e-4 months <br /> on March 31, 1977.

The nals on both doors had been checked, but the cavity between the doors had not been checked on March 19, 1977.

O

=.. - - - -

e--

= ----

Reportable Occurrence Report No.

50-313/77-10 8.

Designation of Apparent Cause of Occurrence:

I Design Procedure Manufacture Unusual Service Condition Including Environmental Installation /

Construction Component Failure (See Failure Data)

Operator X

Other (specify)

.l The instrument technician misunderstood the requirements for leak testing of the escape hatch.

i I

i 9.

Analysis of Occurrence:

The Reactor Building Escape Hatch was immediately retested and found to be acceptable, therefore, there was no ha::ard to the health and safety of the public.

4

\\

y e

g.,_

.,-.-.s-.-_.g

.,7

,,,_.y 7.-.

-.g

,s

..w--w+

r+"

p.

Reportable Occurrence' Report No.

50-313/77-10 10.

Corrective Action:

T' a cavity between the doors was leak checked at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> on

.._Macch 31, 1977, and found to be acceptable.

..The importance of a proper leak rate check has been reemphasized to the plant personnel involved in performing this test.

i

\\

11.

Failure Data:

There has been no other reportable occurrence reported by the Instrumentation and Control group as a result of the failure to perfo m a surveillance test at the required frequency.