RO 50-313/77-5A:on 770128,pinhole Leak Observed on pipe-to- Flange Weld Between Valve & Seal During Routine Investigation.Cause Unknown.Defective Weld Repaired During Refueling Outage
ML19320A150
Person / Time
Site: Arkansas Nuclear 
Issue date: 04/08/1977
From: Mardis D
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19320A146 List:
References
NUDOCS 8004140743
Download: ML19320A150 (4)


Text

OCENSEE EVENT REPORT

~

~.

CdNTROL 8 LOC.i l l

l l

I I

(Maams N ALL M M4 o

1 e

NAME LCENSE NUMSEA F89 lAIRikltIRItl lo lo l-lo lo le loIol-loIe i 14 l i h I i li i lo ir 14 15 25 26 30 31 3E CAffGORY TV A

OOCKET NUM8EA EVENT 3 ATE meP0fri OATE O 1 CONT l l

l

[Q_l

[.$d 1015lol-lo13l113l lo i l I t I t 1717 l l 014101811 h ]

7 8 57 58 59 60 61 88 89 74 75 W

EVENT '1ESCRIPTION DE l b Rtri SaQTthodd t este m o u s tm:.W 4 6 h toWT s4E mas %- TuEch% 1 4 9 45'1 % Attn a.

}

7 89 E

$ l A hwM. t.sau. wms omstr.ote ow w het-To -stasest sists wrwet4 tMNE I

7 89 E

3! I hi-ME huo " C ILc 9 *irut.. "Tuw 19twv WAs n 94,9ETstwc occutasm.

7 89 El HE I (so-se/ i t-rA3 l

7 89 gl EilB I 7 69 80 m

CIoE COMPONENT CODE MANUFACTUWI WRATIDN BE Ic IB I [f_]

le li IP If lY IX l lEl 11 la ls.141

[MJ 7 89 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION 8 l Sk I,

7 89 -

M DE I

\\w w u not m was n eniete co u.u m r a esar u v u tus a l

7 89 80 I

cerrAsc.

l"

00 7JEEK s oo EA oT EA STAruS omonAv oE.CA. TON (B.J lololol I ww I

lkj l

nA l

7 8 9

10 12

  • 3 44 45 46 80 A LE S D OF E ASE AMOUNT OF ACTMTV LCCATON OF RELEASE LL l!J l

a l

I wx I,

i 7 8 9

10 11 44 45 80 I PERSONNEL EXPOSURES l

NUMBER TYPE DESCASTON DE lo lolol lEj l

uA II 7 89 11 12 13 80 i PERSONNEL INJURIES NuMsEA DESCA@ TON DE lo lo lo l I

un I

7 89 11 12 80 -

OFFSITE CONSEQUENC:.3 32 l MA I

7 89 80 LOSS OR OAMAGE TO FACILITY TYPE DESCASTON 3 lEj l

%A l

7 89 10 80 '

PUBLICITY l

A

/

I 1

7 89 80 l

'g-4 ADOITIONAL FACTORS j

l wk I

89 80 19 I 8004140 D l

PHONE: soMi - 4 M NAME:

h\\hD D%5

......T

t^

G 1.

Reportable Occurrence Report No.

50-313/77-5A 2.

Report Date: 4-8-77 3.

Occurrence Date:

1-28-77 4

Facility:

Arkansas Nuclear One-Unit 1 Russellville, Arkansas 5.

Identification of Occurrence:

A leak on the pipe to flange weld between valve RBV-77B and "B" RCP seal.

j 6.

Conditions Prior to Occurrence:

Steady-State Power Reactor Power 0

MWth Hot Standby Net Output 0

gwe Cold Shutdown Percent of Full Power 0

Refueling Shutdown Load Changes During Routine Power Operation Routine Startup Operation Routine Shutdown Operation Other (specify)

Hot Shutdown 7.

Description of Occurrence:

At approximately 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on January 28, 1977, during a routine walk-through inspection by Operations Personnel prior to cooldown, a pinhole leak was observed on the pipe-to-flange weld between Valve RBV-77B and "B" RCP seal. Valve RBV-77B servas as a means of 6nting the "B" RCP seal during initial fill of the RCS.

The leak could not be isolated.

x

y

.~-

)

_)

Reportable Occurrence Report No.

50-313/77-5A 8.

Designation of Apparent Cause of Occurrence:

Design Procedure Manufacture Unusual Service Condition Including Environmental Installation /

Construction Conn onent Failure (See Failure Data)

Operator Other (specify),

X Unknown 9.

Analysis of Occurrence:

The Reactor Coolant System leakrate prior to snutdown was approximately O.S GPM. Since the leakage was contained in a controlled area, there was no hazard to the health and safety of the public.

O O-l

..1

1 Reportable Occurrence Report No. 50-313/77-5A r

10.

Corrective Action:

The defective weld was repaired during the recent refueling outage by grinding and rewelding.

11.

Failure Data:

l This is the second failure in this area. See Abnormal Occurrence I

Report 74-14.