ML19317H071

From kanterella
Jump to navigation Jump to search
RO 50-313/77-11:on 770331,4.71 Ci Pu-Be Source Used by Plant Personnel Found Not Tested for Leakage within Six Months. Caused by Personnel Error.Importance of Conducting Test on Schedule re-emphazed.Source Tested & Found Acceptable
ML19317H071
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/29/1977
From: Mardis D
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19317H067 List:
References
NUDOCS 8004110843
Download: ML19317H071 (4)


Text

_

UCENSEE EVENT RE.RT CONTnOt StoCx:1 I

I I

l I

I tm.sasa mur au. assume asonsmanner;

,g 1

6 A

'IENSE NUMBER PE DE 01 l AIRI A lillRi t I lo le,l -io l ol ol olol-lo lo I 14 11 It I t11 I 10 13 1 7 89 14 15 25 28 30 31 32

" ypE bun CATEcoRY T

ocCxET NUMBER EVENT CATE REPORT OATE O 1 CONT l l

l b lLl lO l S 10 l-1013 l l 13 l lO l313 l 1 I7 l7 l l0l412,l917l'II 7 8 57 58 59 60 61 68 69 74 75 M

EVENT DESCRIPTION DE l Dut.wa 9t.nwT Morrop b i %AA REr-ottan W VIAS On e_notit E B A d. M C.*

l 7 89 E

$ l 90-%C Sece.au useo @ 9t. A9T 9coseMst. %;c utsT 9stus LF AE:. TESTED M\\ TAM l

7 89 80

! %E itstVteOS St% YkonNS. TMis L4 As Atw A QEPETm0C OcodffENCE. TME 7 89 80

$l % Ect M AS L. EAR TESTED MO VocNO To BE Acc@ mate. [66-31S[t7-11 l

7 89 80 M i I

7 89 80 m

EN" No*E CcMocNENT CODE MMUAC7tse vcLATcN 8 lilEl IFl 1113lElB!?l2l

11. l lEln.lsla.1

[ &.l 7 89 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION 8 l Twg. SQq Sectos Me um TESTre ASO Fo040 To %E ACCtPTAatE W\\T% RGEm9% ASIS 7 89 80 0

l To gung 959.sc9du AS To THE \\m PetTAWCT, et" T.Neo cTudG \\_s AE T1tSTi r4 G C4 89 80 I sc.utoutz.

I FACUTv METHC0 OF STATUS 4 POWER OTHER STATUS CISCOVERY DISCOVERY DESCRipTON lbl lololol I

a I

Lb._I I

wa I

1 7 8 9

10 12 13 44 45 46 80 R LE SED OF E ASE AMOUNT CF ACTMTV LOCATCN OF RELEASE LE.J IIJ l

sa l

I ws I

s2 7 8 9

10 11 44 45 80 PERSONNCL EXPCSURES NUM8ER Type DESCRWTCN H lol olO l Lej l

um I

7 89 11 12 13 80 PERSONNEL INJURIES NUM8ER CESCRipTCN lo le lo l I

ww I-i 7 89 11 12 0 80 0FFSITE CONSEQUENCES DE I

%K l

7 89 80 LOSS OR DAMAGE TO FAC:tlTY TYPE DESCR@ TON lij l

e I.

1 7 89 10 go PU8t! CITY

- i m

i 7 89 80 g-~^' >>cl: -

eoo4uo

&43 s9 l l

D=om (3. Nu Soi b -4 %

N4ue:

ysaNe:

2__:_.....__

_ _ _s

. = -


m_-------

~

1.

Reportable Occurrence Report No.

50-313/77-11 2.

Report Date: April 29, 1977 3.

Occurrence Date:

March 31,1977 4

Facility:

Arkansas Nuclear One-Unit 1 Russellville, Arkansas 72801

_5. _ Identification of Occurrence:

The occurrence is the failure to perfom a surveillance test at the required frequency.

6.

Conditions Prior to Occurrence:

Steady-State Power Reactor Power 0

MWth Hot Standby Net Output 0

MWe Cold Shutdown Percent of Full Power 0

Refueling Shutdown Load Changes During Routine Power Operation j

Routine Startup Operat2cn Routine-Shutdown Operation Other (specify)

X Starting Plant Heatup Following Refueling 7.

Description of Occurrence:

At approximately 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on March 31, 1977, it was discovered that the 4.71 C1 Pu-Be Source had not been leak tested in the last 6 months in accordance with Technical Specification 4.14 prior to use by ISC l

personnel during the period 3/12/77 to 3/15/77. The sealed source leak test was due to be perfomed on 12/26/76 the the +2S% allowance would have expired on approximately 2/4/77.

O)

L I

%)

Reportable Occurrence Report No. S0-313/77-11 8.

Designation of Apparent Cause of Occurrence:

Design Procedure Manufacture Unusual Service Condition Including Environmental -

~~

Installation /

Construction Component Failure (See Failure Data)

Operator Other (specify)

X Administrative Control

)

9.

Analysis of Occurrence:

Since the source was leak tested satisfactorily and there was no removable surface contamination found, no hazard to the health and safety of the public existed.

S

--em_._

_.-e

.ee.-m--m A

e

= = -

  • m.

^

~

Reportable Occurrence Report No.

10.

Corrective Action:

Tlw source was leak tested on March 31, 1977 and the importance of

-- comp.?eting source leak testing on schedule has been reemphasi:ed to plant personnel. The Pu-Be source is being tagged to show last

-- leak. check date and date due.

l 11.

Failure Data:

There has been no other occurrence reported due to the failure of the Health Physics Group to perfo m surveillance tests at the required frequency.

O' 4

1

.:"^,...*"_.,