1 FORM OAR-1 OWNER'S ACTIVITY REPORT l

Report Number OAR-1-1233 Owner Enterav Arkansas. Inc. I P. O. Box 551. TCBY TmLittle Rock. AR 72203 i l

(Name and Address of Owner)

Plant Arkansas Nuclear One I1448 S.R. 333. Russellville. AR 72801 l I

(Name and Addms of Plant)

Unit No. 1 Commercial service date December 19.1974 Refueling outage re. 1R13 (if applicable)

Current inspection interval Second f2nd) Insoection Interval (1st,2nd,3rd,4th, other)

Current inspection period Third (3rd) Inspection Period (1st,2nd,3rd) j i

Editicn and Adder #a of Section XI applicable to the inspection plan 1980 Edition / Winter 81 Addenda Dale and revision Jinspection plan February 12.1995 / Revision 31 Edition and Addenda of Section XI applicable to repairs and replacements,if different than the inspection plan N/A l

t CERTIFICATE OF CONFORMANCE

certify that the statements made in this Owner's Activity Report are correct, and that the examinations, test, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

I Certificate of Authorization No. N/A Expiration Date N/A  !

(if applicable)

Signed /[/ . Manaaer. Enaineerina Proarams Date 29 ' ~

M Rott, Owner or Owner's Designee, Title / '( j

  • t -n 'f g ,

CERTIFICATE OF INSERVICE INSPECTION t, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Arkansas and employed by Arkwriaht_MutualInsurance Co. of Walthem.MA have inspected the items l

described in this owner's Activity Report, during the period May 9 1992 to June 1.1997 . and state that j to the best of my knowledge and belief, the Owner has performed all activities represented by this report in scoordance with the requirements of Section XI. j By signing this certificate neither the inspector nor his employer rnakes any warranty, expressed or implied, conceming the  !

l examinations, tests, repairs, replacements, evaluations and correct 0e measures described this report. Furthermore, neither '

the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

(A . Ovs M Commissions NB-9985. ARK-1054 "N" *l" *B" inspector's Signature J Natonal Board, State, Province, and Endorsements oaie 7-30-99 l This form (E00127) may be obtained from the Order Dept., ASME,22 Law Drive, Box 2300, Fairfeeld, NJ 07007-2300.

981202009'7 981124 PDR ADOCK 05000313 G PDR '

[

! , Attachment I to l- ICAN119801

Table 1, Page 1

l '

. TABLE 1 i ABSTRACT OF EXAMINATIONS AND TEST ,

Examination Total Total Total Total Remarks ;

{ Category Eramintions Examinations Examinations Examinations l Required for Credited for Credited (%) For Credited (%) To

The Interval This Period The Period Date for The

! Interval B-A 13 11 84.62 100.00 l-j B-B 9 2 M 100.00

  • i B-E 28 9 32.14 100.00 .

l B-F 39 11 M 100.00 l B-G-2 19 7 36.84 100.00 i B-H 11 10 M 100.00

B-J 108 54 50.00 100.00 l B-K-1 5 1 100.00 6 l C-A 8 2 100.00 i C-B 7 3 42.86 100.00 l C-C 50 15 M 100.00
  • j C-F 157 72 45.86 100.00  ;

j D-B 66 22 l 33.33 l 100.00 j F-A 122 41 l 33.61 l 100.00 '

j

  • Note: Two examinations from Category B-B and four examinations from Category C-C were I inspected during the first outage of the Third Interval. Credit for these will be used for the l Second Interval.

l

! " Note: Inspection requirements taken from ASME Section XI 1974 Ed. Addenda Summer 1975, IWC-2411(b) multiple stream method.

Note: Certain Examination Categories, which are not subject to the percentage requirements of Table IWB-2412-1, are omitted from Table 1 for the below reasons:

-Examination Categories B-L-1, B-M-1, B-N-2, B-N-3, and B-O per IWB-2412(a)(2) deference allowable until the end of the inspection interval.

-E===i=4n Category B-P and B-Q per IWB-2412(a)(1)

~ Examination Category B-L-2 AND B-M-2 per IWB-2412(a)(4)-deference allowable until disassembly of component for maintenance, repair or volumetric examination i Shadingi A ReliefRequest is required for altering the percentage distribution requirements found in Table IWB-2412-1 Inspection Program B. )

i

Attachment 2 ts ICAN119801 Table 2, Page 1 of 7 -

TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE ~

Examination Item Item Description Flaw Characterization (IWA-3300) Flaw or Relevant Condition Category Number found During SchW Section XI Ey=mination or Test (Yes or No)

C-C C3.10 Support Saddle to shell Decay Heat Cooler E-35B Incomplete Penetration and Fusion to Yes the saddle support F-A F1.40 Multi-Directional Restraint - (HBD-2-H10) Corrosion Degradation Yes F-A F1.40 Multi-Directional Restraint - (HBD-2-H1 ~1) Corrosion Degradation Yes F-A Fl.40 Multi-Directional Restraint - (HBD-2-H12) Corrosion Degradation Yes F-A F1.40 High Pressure Injection way Restraint-(MU- Vibration Wearing No 167)

F-A Fl.40 High Pressure Injection - Snubber - (MU- Vibration Wearing No 167A)

. . . . . ts -

ICANI19801 Table 3, Page 2 of 7 '

TABLE 3 .

UNIT I INTERVAL 2 PERIOD 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE code REPAM, mas cuss mErucEnam oR DEsCRenon DESCRFDoNoF WORK FMWoR REMVANT DATE REPAGU conDmonvoUND commsenvE consrurED mErucEnsEnr DEEASURE DUnino ruMMUREnER SCHEDULED 1 smenonxi ExAnGNADonoE TESTtraw mn 3 Replacement Pipe Replaced HSC-2-3" pipe and elbow No 08/24/95 93-2202 (Invoke Code Ca_= N-416-1) 3 Replacement Valve Replaced valve CZ-2 No 02/07/96 93-2408 2 Replacement Valve Replaced valve bonnet (MU-26) No 10/12M6 94-2167 3 Replacement Htexch Replaced heat exchanger (VUC-1B) No 05/26/95 94-2226 3 Replacement Htexch Replaced heat exch=ager(VUC-1C) No 08/16/95 94-2227 3 Replacement Valve Replaced valve internals (CZ-53B) No 11/27 S 5 94-2346 3 Replacement Pump Replaced wet end (P-4A) No 05/09/95 94-2386 1 Rep h ..e. Valve Replaced rupture disc (PSE-4812) No 04/04/95- 95-2033 3 Rep-:+1e-; Valve Replaced valve (CV-4830) No 04/24/96 95-2061 (Invoke Code Case N-416-1) 2 Replacement Valve Replaced valve internals (MU-22B) No 04/13/95 95-2074 2 Reis- Valve Machined sealing surface (CV-2613) No 04/27/95 95-2075 2 Rei h .~.a Htexch Replaced end bell studs (E-35A) No 09/14/95- 95-2083 2 Replece.v.e.; Valve Replaced disc (PSV-2688) No 04/06/95 95-2103 1 R A T~.; Valve Replaced nuts (PSV-1000) No 04/20/95 95-2123 3 R @ v.e. Valve Replaced bonnet bolts (SF-22) No 08/02/95 95-2133 3 Rep h ..e.a Support Modi 6ed support (HBD-2-H6) No 04/14/95 95-2134 2 R@..e.; Valve Replace studs and nuts (CV-1235) No 10/15/96 95-2150

- ts 1CANI19801 '

Table 3, Page 3 of 7 -

TABLE 3 .

UNIT 1 INTERVAL 2 PERIOD 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE CODE REFAIR, frEM DESCRIPTION OF WORK FLAW OR RELEVANT DATE REFAIRI CLASS REPLACEMENT OR DESCRIPTION CONDITION FOUND COMPLETED REPLACEMENT CORRECrIVE DURING FLAN NUMBER MEASURE SCHEDULED SECTION XI EXAMINATION OR TEST (YES/NO) 3 Replacement Pump Replaced wet end (P-4C) No 05/19/95 95-2151 3 Replacement Valve Replaced valve internals (GZ-9B) No 09/12/95 95-2208 3 Replacement Pipe Install flanges (HCD-16-4") No 07/12/95 95-2210 (Invoke Code Case N-416-1) 3 Replacement Pipe Install flanges (HCD-64-2") No 08/01/95 95-2231 3 Replacement Valve Replaced valve internals (DWD-18B) No 08/25/95 95-2249 3 Replacement Pipe Replace pipe (HBD-14-6" & 14") No 09/30/96 96-2001 (Invoke Code Case N-416-1) 2 Replacement Valve Replaced disc (MU-22C) No 10/12/ % 96-2014 3 Replacement Valve Installed bypass line (CV-2803) No 07/25/96 ___ % 2057 3 Replacement Valves Install check valves (DZ-27A/B) No 01/07/97 %2%2 (Invoke Code Case N-416-1) 1 Replacement Valve Replaced valve ( PSV-1002) No 10/23/ %  % 2070 2 Repair Valve Machined disc (CA-61) No 10/03/96 96-2074 1 Replacement Valve Replaced disc (CV-1000) No 10/23/96 96-2080 3 Replacement Support Install support (HBD-21-H94A) No 09/30/96  % 2082 3 Replacement Support Install support (HBD-124-H003) No 09/30/96  % -2083 3 Replacement Support Install support (HBD-020-073A) No 09/30/96  % 2084 3 Replacement Pipe Install half-cpig. (HBD-20-2") No 08/02/96 96-2085 2 Repair Support Increased weld size (MS-111) No 10/03/96 96-2086 2 Repair Support Modified support (MFW-HO11) No 09/03/96 96-2088

_ .m. ___ _ . _ _ . _ . . _ . _ . _ . _ _ _ _ _ _ - _ _ _ . . - . . _ _ . . . - . _ . . . . . . . - . - - . . _ _ . . . _

e 1 Attachment 2 ts -l

. ICANI19801 '

~ Table 3, Page 4 of 7 .;

TABLE 3 .  ;

! UNIT 1 INTERVAL 2 PERIOD 3 j i  !

ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE i CODE RErAIR. rTEhe DascRFnoM oF WORK FIAW oR REUEVANT DATE RErAEW I crass RariumnatnroR nascRenon conDmonroons coherumes EnrixEusnr .

l coRRactiva ocRanc riannunsasR  ;

MEASURE scHEDUI2D i sacnonxi EXARENATIoM oR

, vast mtsmoi 4

)

3 Replacement Support Install support (HBD-014-H096) No 10/01/96 96-2090 3 Replacement Support Install support (HBD-014-H095) No 10/03/96 . 96-2091 i 3 Replacement Support Install support (HBD-125-H002) No 10/01/96  % 2092 3 Replacement Pipe Install half-cpig (HBD-20-2") No 08/02/96 96-2093 3 Replacement Support Modified support (3EFW-109-H3) No 10/01/96 96-2094 1 Replacement Support Install support (CCA-9-H15) No 09/30/96 96-2095 i 2 Repair Support Modified support (MFW-H012) No 09/3006  % 2096 3 Replacement Support Modified support (HCD-64-H2) No 10/03/96 96-2099 i 2 Repl w a: Valve Rerouted pipe and relocated valve No 10/23/96 96-3003 i (CV-2619) 2 Replacement Valve Rerouted pipe and relocated valve No 10/23/96 96-3004 (CV-2619) 1 Replacement Valve Replaced valve ( PSV-1001) No 10/23/96 96-3012 2 Repair Support Modified support (MS-111) No 10/03/96 96-3028

2 Repair Support Modified support (MS-171) No 10/13/96  % 3029 4

2 Replacement Support Installed support (EBB-3-HI) No 10/13/96 96-3030 2 Replacement Support Installed support (1-MS-5-HI) No 10/13/96 96-3031 3 Replacement Support Modified support (1-MS-118-H18) No 10/04/96 96-3032

^

2 Replacement Valve Replaced disc (PSV-2696) No 10/23/96 96-3035 2 Replacement Valve Replaced disc (PSV-2684) No 10/23/96 96-3037 2 Replacement Valve Replaced valve (PSV-2685) No 10/23/96 96-3038 I

i

! Attachment 2 to l ICAN119801 .

Table 3, Page 5 of 7 -

t TABLE 3 .

i j UNIT I INTERVAL 2 PERIOD 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE i

> cops marAna, rrsu anscurrrumorwoax ruwon asLsVANT DATs marAnW  !

cuss marucamanTon ' nascus m on conomonrouno courLarus marucsusNr commscriva nomma runsumasm  ;

usAsums arWRacLsD secrum x sEAutNATBonon Tasrtyssam i 2 Repair Flange Machine flange face, replaced studs / nuts for No 10/23 %  % 3041 nozzle No.12 on E24B (Code Case N-416-1) l 3 Repair Coolers Repaired baffle plates (E-20A-1/2) No 10/03/96 96-3048 2 Repair Support Modified support (MS-163) No 10/03/96  % 3049  !

3 Repair Pipe Repaired slip-on flange (HBD-14-14") No 09/30/96  % 3050 2 Repair Pipe Adjusted slope ofpipe No 10/10/96  % 3054 I Replacement Rad Cals Replaced rad cals bolting (UE-1188 & 1189) No 10/04/96  % 3055 3 Replacement Support Installed shim (HBD-14-H84) No 09/26/96  % 3056 i 3 Replacement Support Installed shim (HBD-14-H88) No 09/29/96  % 3057 3 Rei,lacement Support Installed shim (HBD-14-H6) No 09/29/96  % 3058 ,

1 Replacement Support Install snubber (CCA/HS-100) No 10/03/96  % 3064 3 Repair Htexch Machined end bell (E-20B-1/2) No 10/03/96-  % 3069 l 3 Replacement Pipe Replaced pipe flange (CCC-4-1.5") No 10/14/96  % 3072  !

(Invoke Code Case N-416-1) 1 Replacement R-1 Head Replaced O-Ring clip No 09/27/96  % 3073  !

3 Replacement Pipe Installed pipe cap (HBC-I-2") No 10/14/96  % 3074 2 Repair Valves Machined inlet nozzles for spare dresser MSSV's No 11/13/96  % 3075 _

1 Replacement Pump Replaced studs (E-25B) No 10/08/96  % 3078 1 Repair Support Modified support (MU-167A) No 10/10/96 96-3080 2 Replacement Pump Replaced casirig stud and nuts (P-35B) No 11/01/96  % 3081 2 Repair Support Modified support (HBB-13-H10) No 10/14/96  % 3082 t

i I

t

Attado.st 2 ta 1CANI19801 .

Table 3, Page 6 of 7 -

TABLE 3 .

UNIT 1 NTERVAL 2 PERIOD 3 ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE CODE REPAm, FrEM DESCRIFnON OFWORK FLAW OR RELEVANT RATE REFAIR/

CLASS REPLACEMENTOR DESCRIFFION CONDITION FOUND (DMPLETED REFIAcEMENT CORRECTIVE DURING FLAN NUMBER MEASURE SCHEDULED SECTIONXI EXAMINATION oR TErrnEsawn 1 Replacement CRDM Replaced CRDM-42 top closure assembly No 10/23/96  % 3083 2 Replacement Pipe Installed pipe cap No 10/13/96  % 3084 (Code Case N-416-1) 2 Replacement Pipe Installed pipe cap No 10/13/96  % 3085 (Code Case N-416-1) 3 Replacement Pipe Install orifice (FO-3814C) No 12/19/96  % 3133 (Invoke Code Case N-416-1) 3 Replacement Pipe Install ori6ce(FO-3814B) No 01/21/97  % 3134 (Invoke Code Case N-416-1) 3 Replacement Cooler Install cooling coil (VUC-7C) No 12/19/96  % 3139 2 Replacement Pump Replaced flange stud (P-34A) No 05/25/97 97-2058 2 Replacement Valve Replaced disc and spring assembly No 04/23/97 97-2090 (MSSV S/N BL-01094) 2 Replacement Valve Replaced disc and spring assembly No 04/23/97 97-2091 (MSSV S/N BL-01096) 2 Replacement Valve Replaced disc and spring assembly No 04/23/97 97-2092 (MSSV S/N BL-01098) 2 Replacement Valve Replaced disc and spring assembly No 04/23/97 97-2093 (MSSV S/N BL-01099) 2 Replacement Valve Replaced disc and spring assembly No 04/23/97 97-2094 (MSSV S/N BL-01100)

Attachment 2 to '

1CANI19801 ~

Table 3, Page 7 of.7 -

TABLE 3 .

UNIT 1 INTERVAL 2 PERIOD 3 ABSTRACF OF REPAIRS, REPLACEMEN'I5 OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SEEVICE cons mama, rrsu asscarrumerwomm ruwam RsLsVANr BM cuss marucsuswrom nasonerson ms M Rf conorrumpounn mururrum maruamaur menscrivs usAsuRE summo runnuussa son DufAD ,

secrum xt '

sIAufnATEoNeR Tasr(Ysafne) 2 Replacement Valve Replaced disc and spring assembly No 04/23/97- 97-2095 (MSSV S/N BL-01110) 2 Engineering Integral An Engineering Response written for Yes 07/22/97 Response Attachment Evaluation ER973810 (Support Saddle E-35B) 3 Engineering Multi- An Engineering Response written for Yes 08/15/96-Response Directional Evaluation IRF8137 (HBD-2-H10)

Restraint 3 Ergir Lg Multi- An Fagir-:- - Lg Response written for. Yes 08/15/96 Response Directional Evaluation IRF8137 (HBD-2-H12)

Restraint 3 Engineering Multi- An Faai% Response written for Yes 07/24/96 Response Directional Evaluation IRF8133 (HBD-2-H11)

Restraint 1 F25k- - Lg 1-Way A Condition Report CR-ANO-1-1996-502 was No 10/09/1996 Response Restraint written and the Line Citr was edited. (MU-167) 1 F23 W--Lg Snubber A Condition Report CR-ANO-1-1996-502 was No 10/09/1996

Response

written and the Line Calc. was edited. (MU-167A)

L

___