ML20003A955
| ML20003A955 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 01/19/1981 |
| From: | Ohanlon J ARKANSAS POWER & LIGHT CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANO-81-0319, IEB-79-14, RO-50-313-81-01, RO-50-313-81-1, NUDOCS 8102100116 | |
| Download: ML20003A955 (1) | |
Text
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear Cne Russellville, Arkansas January 19, 1981 yt AN0-81-0319 g
q' b.
2.
Mr. Karl Seyf rit, Director 6
Office of Inspection & Enforcement 2
TEE 06 581 8 b Region IV g w ammenef [3)
U.S. Nuclear Regulatory Commission wenmar' g f, 611 Ryan Plaza Drive, Suite 1000
'.7 Arlington, Texas 76011 q
SUBJECT:
Arkansas Nuclear One - Unit I Reportable Event S0-313/81-01
Dear Mr. Seyfrit:
This is to confirm the conversation between Mr. Bill Johnson (NRC, Resident Inspector), Mr. Harvey Miller (Arkansas Nuclear One, Manager-Engineering and Technical Support) and Mr. Early Ewing (Arkansas Nuclear One, Plant Engineering Superintendent) at approximately 1000 on January 17, 1981. This is reported to you in accordance with Unit One Technical Specification 6.12.3.1.1.
As a result of an analysis being performed in relation to the installation of flow measuring orifices in the service water piping serving the Reactor Building cooling units, a concern was identified related to the adequacy of the piping system.
Our analysis revealed that the original analysis performed, and a subsequent analysis performed as a result of I.E.Bulletin 79-14 had considered the Reactor Building cooling unit piping nortles as rigid anchors. Discussions with the equipment manufacturer indicated that these nozzles should not be considered as rigid anchors.
A reanalysis which properly considered the nozzle loads, indicated that remedial action will be required to prevent overstressing the cooler nozzles. The addi-tional piping supports required will be installed during the current refueling period.
Sincerely, k Q>
o J. P. O'Hanlon General Manager JPO:GIDi:sbp f
cc: File j l 8 3 0 210 0//h I
"5"$5a "'oo'5 Scu'" u"ur es svsreu 8
NRC FOIM 366 U. S. NUCLEA'1 KE!ULATO3Y COMMISSION 17J7)
LICENSEE EVENT REPORT 1
CONTROL BLOCK: l l
l l
l l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6
l0l1ll l
l l
l l
lhl5 l l
l l
l l
l l
l l
lhl l
l l
l lhl l
lh 7
8 9 LICENSEE CODE 14 1
LICENSE NuM8ER 25 28 LICENSE TYPE JG 57 CAT 58 CON'T l@lO 1610 i O 10 ISl l dMI dl l I l l 81 h / l@l Ol l l I l T l T[,[.j@
IOIiI 5$,"C l
7 8
60 61 DOCKET NUV8ER 68 69 EVENT DATE 74 is REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CON '. 2UENCES h I o 121 I
(
I l o 13 I I l
10141 I l
10151 I l
10181l 10171I i
I 10181 I E
CO E SU8CO E COMPONENT CODE 5U8 00'E SU E
ioisi I
I IO LJ@ l l@ l i
I I
I I l@ LJ@ U @
7 8
9 10 11 12 13 18 19 20 SEOL,E N TI A L OCCURRENCE REPOR T R EVISION LER EVENT Y R EPORT NO.
CODE TYPE NO.
@,agg'ROI S i lAR 1-1 Idi dlI l-1 I
I I
I I
l-l U
i g
l
_ 21 22 23 24 26 27 28 29 JJ 31 32 7 K N AC O O P NT ME HOURS S8 POR B.
SUPPLIE MANUPACTURER I
l@l l@
l l@
l l@
l I
I I
I I
l@
LJ@
LJ@
l l
l 1
l@
J3 34 33 36 37 40 41 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h l i 101 1 I
I li lil l l
i 2 I
l (i 131 I I
[mI 80 8 9 STA 5
% POWER OTHER STATUS IS O RY DISCOVERY DESCRIPTION i i i s i L_J@ l i
I I@l i
I l@l i
ACTIVITY CONTENT RELE ASED OP RELEASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE u.Lej l 1 @ LJ@l I
I I
7 4 3 iO 11 44 45 80 PERSONNEL EXPOSURES DESCRIPTION TYPE @l i
NUVBER IiI 7I I I
I l@l l
PERSONNE L INJURIES NUVBER DESCRIPTION l
iinii i
i i@i i
80 7
3 9 11 12 l
LOSS Of OR DAVAGE TO FACILITY g TYPE CESCRIPTION I i I 91 l_J@l l
80 7
5 9 to e
DESCRIPTION ISSUED @l I
lillllllililli U
2 o 68 69
- 80..
7 8 3 10 l
l NAME OF PREPARER PHONE: