ML20003A955

From kanterella
Jump to navigation Jump to search
RO 50-313/81-01:on 810117,discussion W/Manufacturer Revealed Reactor Bldg Cooling Unit Piping Nozzles Should Not Be Considered Rigid Anchors as IE Bulletin 79-14 Analysis Indicated.Addl Piping Supports to Be Installed
ML20003A955
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/19/1981
From: Ohanlon J
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANO-81-0319, IEB-79-14, RO-50-313-81-01, RO-50-313-81-1, NUDOCS 8102100116
Download: ML20003A955 (1)


Text

ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear Cne Russellville, Arkansas January 19, 1981 yt

  • AN0-81-0319 g
q' Mr. Karl Seyf rit, Director b.

6 2.

Office of Inspection & Enforcement 2 TEE 06 581 8 b Region IV -

g w ammenef [3)

U.S. Nuclear Regulatory Commission wenmar' g f, 611 Ryan Plaza Drive, Suite 1000 '. '.7 Arlington, Texas 76011 %q .,,'

SUBJECT:

Arkansas Nuclear One - Unit I Reportable Event S0-313/81-01

Dear Mr. Seyfrit:

This is to confirm the conversation between Mr. Bill Johnson (NRC, Resident Inspector), Mr. Harvey Miller (Arkansas Nuclear One, Manager-Engineering and Technical Support) and Mr. Early Ewing (Arkansas Nuclear One, Plant Engineering Superintendent) at approximately 1000 on January 17, 1981. This is reported to you in accordance with Unit One Technical Specification 6.12.3.1.1.

As a result of an analysis being performed in relation to the installation of flow measuring orifices in the service water piping serving the Reactor Building cooling units, a concern was identified related to the adequacy of the piping system.

Our analysis revealed that the original analysis performed, and a subsequent analysis performed as a result of I.E.Bulletin 79-14 had considered the Reactor Building cooling unit piping nortles as rigid anchors. Discussions with the equipment manufacturer indicated that these nozzles should not be considered as rigid anchors.

A reanalysis which properly considered the nozzle loads, indicated that remedial action will be required to prevent overstressing the cooler nozzles. The addi-tional piping supports required will be installed during the current refueling period.

Sincerely, o k Q>

J. P. O'Hanlon General Manager JPO:GIDi:sbp f

cc: File ,

j l 8 3 0 210 0//h "5"$5a "'oo'5 Scu'" u"ur es svsreu I 8

NRC FOIM 366 U. S. NUCLEA'1 KE!ULATO3Y COMMISSION 17J7)

LICENSEE EVENT REPORT 1

CONTROL BLOCK: l 1

l l l l l lh 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l0l1ll 7 8 9 l l l LICENSEE CODE l l lhl5 l 14 1 l l l l LICENSE NuM8ER l l l l l 25 lhl 28 l l l LICENSE TYPE JG l lhl57 CATl 58lh CON'T IOIiI 5$ ,"C l l@lO 1610 i O 10 ISl l 68dMI69 dl l EVENT I l l DATE81 h / l@l Ol l REPORT 74 is lIlT l T[,[.j@

DATE 80 7 8 60 61 DOCKET NUV8ER EVENT DESCRIPTION AND PROB ABLE CON '. 2UENCES h

(

I o 121 I I

l o 13 I I l

10141 I l

10151 I l

10181l i

10171I I

10181 I E CO E SU8CO E COMPONENT CODE 5U8 00'E SU E ioisi 7 8 I

9 I

10 IO LJ@ l l@ l 11 12 13 i I I I I l@ LJ@ U @

18 19 20 SEOL,E N TI A L OCCURRENCE REPOR T R EVISION EVENT Y R EPORT NO. CODE TYPE NO.

LER

@ ,agg'RO g I S i lAR

_ 21 l

22 1-1 23 Idi dlI 24 i

26 l-1 27 I

28 I

29 I I JJ I l-l 31 U

32 7 K N AC O O P NT ME HOURS S8 POR B. SUPPLIE MANUPACTURER I

J3 l@l34 l@ l 33 l@ l 36 l@ l 37 I I I 40 I I 41 l@ LJ@ LJ@

42 43 l

44 l l 1 47 l@

CAUSE OESCRIPTION AND CORRECTIVE ACTIONS h I

l i 101 1 I

li lil l l

i 2 I l

! (i 131 I I

[mI8 9 80 STA 5  % POWER OTHER STATUS IS O RY DISCOVERY DESCRIPTION i

i i i s i L_J@ l i I I@l i I l@l ACTIVITY CONTENT RELE ASED OP RELEASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE u.Lej l 1 @ iOLJ@l I I 45 I

80 7 4 3 11 44 PERSONNEL EXPOSURES NUVBER DESCRIPTION IiI 7I I I I l@lTYPE l @l i PERSONNE L INJURIES NUVBER DESCRIPTION i

l iinii i i i@i12 80 7 3 9 11 l

LOSS Of OR DAVAGE TO FACILITY g TYPE CESCRIPTION l

I i I 91 7 5 9 l_J@lto 80 e

DESCRIPTION 2 o U ISSUED @l I lillllllililli 7 8 3 10 68 69 80. .

l l NAME OF PREPARER PHONE: