ML17137A333

From kanterella
Revision as of 18:02, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016
ML17137A333
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/17/2017
From: Diane Jackson
Division Reactor Projects II
To: Steven Rose
Division Reactor Projects II
References
Download: ML17137A333 (13)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 17, 2017 MEMORANDUM TO: Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects FROM: Donna Jackson, Project Engineer /RA/

Reactor Projects Branch 4 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- 2016 ANNUAL ASSESSMENT PUBLIC MEETING REGARDING BRUNSWICK STEAM ELECTRIC PLANT, DOCKET NOS. 50-325 and 50-324 On May 11, 2017, at 5:00 pm, the Nuclear Regulatory Commission (NRC) staff met with members of the public at the Duke Media Center, 8520 River Road SE, Southport, NC 28461.

The purpose of the open house and poster board session was to provide opportunities to discuss the annual assessment of the Brunswick Steam Electric Plant with the public for the period of January 1, 2016, through December 31, 2016. The meeting notice is available in the Agencywide Documents Access and Management System at Accession Number ML17081A383. Enclosed are a list of attendees and copies of the poster boards displayed at the meeting.

Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosures:

1. List of Attendees
2. Poster Boards CONTACT: Donna Jackson, RII/DRP/RPB4 404-997-4892

ML17137A333 OFFICE RII:DRP RII:DRP NAME DJackson JDJ for SRose DATE 5/16/2017 5/17/2017 1

Enclosure 2

2 Enclosure 2

3 Enclosure 2

4 Enclosure 2

5 Enclosure 2

6 Enclosure 2

7 Enclosure 2

8 Reactor Oversight Process Action Matrix Enclosure 2

9 Enclosure 2

10 Enclosure 2