EA-14-048 Public Meeting Summary - Regulatory Conference and Predecision Enforcement Conference for Brunswick Steam Electric Plant
ML14140A291
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/20/2014
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Hamrick G
Duke Energy Carolinas
References
EA-14-048
Download: ML14140A291 (71)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 20, 2014 EA-14-048 Mr. George T. Hamrick, Vice President Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461

SUBJECT:

PUBLIC MEETING

SUMMARY

- REGULATORY CONFERENCE AND PREDECISION ENFORCEMENT CONFERENCE FOR BRUNSWICK STEAM ELECTRIC PLANT

Dear Mr. Hamrick:

This refers to the meeting conducted on May 12, 2014, in Atlanta, GA. The purpose of this meeting was to allow representatives of Duke Energy Progress Inc. (Duke Energy), the licensee for Brunswick Steam Electric Plant, to meet with U. S. Nuclear Regulatory Commission (NRC) personnel to discuss their position with regard to the preliminary White finding and associated apparent violation (AV) for Unit 2 regarding an AV of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, Corrective Action, with two examples. The first example involved the failure to promptly identify and correct conditions adverse to quality associated with flood protection of multiple safety-related buildings. The second example involved the failure to correct a significant condition adverse to quality. The AV associated with the preliminary White finding was regarding the failure to report a condition prohibited by plant Technical Specification 3.7.2, as required by 10 CFR 50.73, documented in inspection report 05000325,324/2014010. During the meeting, Duke Energy representatives provided an assessment of the significance of the findings, the root cause evaluation, corrective actions implemented and planned, and the methodology used to evaluate storm surge and flooding.

A list of attendees and a copy of the presentation handouts are enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

G. Hamrick 2 Should you have any questions concerning this meeting, please contact me at (404) 997-4645.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosures:

1. List of Attendees
2. Presentation Handouts cc Distribution via ListServ

_ ________ _ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE DXW4 /RA/ GTH1 /RA/

NAME DJackson GHopper DATE 5/16/2014 5/19/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO 9.32