|
---|
Category:Letter
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 05000325/LER-2024-002, Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization2024-04-10010 April 2024 Re Automatic Start of Emergency Diesel Generator Due to Emergency Bus De-energization 05000325/LER-2024-001, Primary Containment Penetration Local Leak Rate Testing Failure2024-04-10010 April 2024 Primary Containment Penetration Local Leak Rate Testing Failure ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 – Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 – Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 05000324/LER-2023-001, Two Main Steam Line Safety Relief Valves Inoperable2023-07-17017 July 2023 Two Main Steam Line Safety Relief Valves Inoperable 05000325/LER-2023-001, Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram2023-06-15015 June 2023 Loss of Redundant Power Supply Operation Causes Turbine Trip and Subsequent Reactor Scram ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 – Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations 2024-09-04
[Table view] Category:Meeting Summary
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML21057A1172021-04-0101 April 2021 February 17, 2021 Summary of Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed License Amendment Request to Adopt TSTF-505 Risk-Informed Extended Completion Time ML21036A3112021-03-0303 March 2021 Summary of February 3, 2021, Public Meeting with Duke Energy Progress, LLC, to Discuss a Proposed LAR to Change the Standby Liquid Control System Technical Specifications for Brunswick Steam Electric Plant, Units 1 and 2 ML21028A6762021-02-24024 February 2021 Summary of January 21, 2021, Closed Meeting with Duke Energy Progress, LLC, to Discuss a Proposed Relief Request Related to Service Water Underground Piping Coating for Brunswick Steam Electric Plant ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19331A8062020-01-29029 January 2020 Summary of November 13, 2019 Closed Meeting with Duke Energy Carolinas, LLC and Duke Energy Progress, LLC, to Discuss Security-Related Information for Its Licensed Facilities ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML17317A3302017-12-22022 December 2017 Summary of October 26, 2017, Second Pre-Submittal Meeting with Duke Energy Regarding Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17340A1302017-12-22022 December 2017 Summary of November 29, 2017, Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Requests to Implement the Requirement of 10 CFR 50.69 at Brunswick, Shearon Harris, and H. B. Robinson ML17286A1222017-11-0101 November 2017 Summary of August 22, 2017, Pre-Submittal Meeting with Duke Energy Re. Brunswick Advanced Areva Methods License Amendment Request (CAC Nos. MF9965 and MF9966; EPID L-2017-LRM-0033) ML17137A3332017-05-17017 May 2017 Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 ML16264A3352016-10-17017 October 2016 Summary of August 18, 2016, Pre-Submittal Meeting with Duke Energy Regarding Mella+ License Amendment Request ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML16034A5242016-03-11011 March 2016 Summary of February 1, 2016, Pre-submittal Meeting with Duke Energy Regarding Consolidation of Emergency Operations Facilities ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML14210A0502014-07-30030 July 2014 June 30, 2014, Summary of the Category 1 Public Meeting with Duke Energy Progress Inc. to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14147A2282014-06-0404 June 2014 4/17/2014 Summary of Closed Meeting with Duke Energy Progress, Inc. Regarding Areva Methods Applicability of Mella+ for Brunswick Steam Electric Plant. Units 1 and 2 ML14140A2912014-05-20020 May 2014 EA-14-048 Public Meeting Summary - Regulatory Conference and Predecision Enforcement Conference for Brunswick Steam Electric Plant ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13155A1052013-06-12012 June 2013 May 2, 2013, Summary of Meeting with Duke Energy Concerning the Relocation of the Emergency Operating Facilities ML13130A2552013-05-10010 May 2013 4/24/2013 - Meeting Summary - Category 3 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant ML13016A0142013-01-17017 January 2013 1/8/2013 Summary of Meeting with Progress Energy to Discuss Planned Amendment Requests at Brunswick Steam Electric Plant, Units 1 and 2 ML12188A5182012-07-18018 July 2012 Summary of Pre-Application Conference Call with Carolina Power & Light on the Transition to NFPA 805 Requirements for Brunswick for Brunswick Steam Electric Plant, Units 1 and 2 ML12174A2562012-07-0909 July 2012 Summary of Pre-Application Meeting with Carolina Power & Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12181A0362012-06-29029 June 2012 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML12167A0432012-06-26026 June 2012 Meeting Summary - Pre-Application Meeting with Carolina Power and Light Company on Transition to National Fire Protection Association Standard 805 Requirements for Brunswick Steam Electric Plant, Units Nos. 1 and 2 ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1115109972011-05-31031 May 2011 Category 1 Public Meeting - Meeting Summary - Annual Assessment of Brunswick Steam Electric Plant ML11116A0202011-05-12012 May 2011 April 12, 2011, Summary of Pre-Application Meeting with Carolina Power & Light Company and Florida Power Corporation, on Brunswick, Units 1 & 2, Crystal River, Unit 3, and H. B. Robinson, Unit 2 ML1023804682010-08-26026 August 2010 08/18/10 Summary of Meeting NRC Initial Exam Writer'S Workshop ML1015404022010-06-0303 June 2010 Meeting Summary - Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML1001507472010-01-15015 January 2010 Summary of Meeting with Carolina Power and Light Company Regarding Brunswick Steam Electric Plant Human Performance Improvement Plan ML0930206502009-10-29029 October 2009 Summary of Category 1 Public Meeting with Brunswick Steam Electric Plant Regarding Issues with the Emergency Diesel Generators ML0923803922009-08-26026 August 2009 08/11-12/2009-Summary of Meeting Re 2009 Us NRC Initial Exam Development Workshop ML0921609632009-08-0404 August 2009 Meeting Summary - Public Meeting Category 1 - Preliminary White Finding - Brunswick Steam Electric Plant ML0915905862009-06-0505 June 2009 Summary of Category 1 Public Meeting - Annual Assessment of Brunswick Steam Electric Plant, Docket Nos. 50-325, 50-324 ML0914903142009-05-29029 May 2009 Carolina Power and Light, May 22, 2009, Public Meeting Summary Regarding Brunswick Steam Electric Plant Performance and Organizational Alignment within the Company ML0830800032008-10-31031 October 2008 Summary of Public Meeting with Carolina Power and Light and Florida Power Corporation Regarding Organizational Alignment within the Company ML0720005262007-07-20020 July 2007 Summary of Meeting with Carolina Power & Light Company Regarding the Transition to Areva Fuel at Brunswick Steam Electric Plant, Units 1 and 2 (TAC Nos. MD4063 and 4064) ML0710803582007-04-18018 April 2007 Summary of Public Management Meeting to Discuss Brunswick Site and Emergency Diesel Generator Improvements ML0710803992007-04-18018 April 2007 Summary of Public Meeting with Brunswick Steam Electric Plant Regarding the Trip of Emergency Diesel Generator #1 and Failure of Engine Crankshaft Bearing on 11/02/2006 2024-05-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 June 5, 2009 Mr. Benjamin C. Waldrep Vice President Carolina Power and Light Company Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461
SUBJECT:
MEETING
SUMMARY
- CATEGORY 1 PUBLIC MEETING - ANNUAL ASSESSMENT OF BRUNSWICK STEAM ELECTRIC PLANT, DOCKET NOS.
50-325, 50-324
Dear Mr. Waldrep:
This refers to the meeting conducted at our request at the Brunswick Media Center Auditorium on June 3, 2009, at 5:00 pm. The meeting's purpose was to discuss the NRC Reactor Oversight Process Annual Assessment of Brunswick Steam Electric Plant Unit 1 and Unit 2.
The topics discussed included the reactor oversight process, the NRCs action matrix and the performance of the Brunswick Plant.
Enclosed are a list of attendees and the presentation handouts.
In accordance with Section 2.390 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4603.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-325, 50-324 License No.: DPR-71, DPR-62
Enclosures:
As stated cc w/encl.: (See page 2)
_____________ _ X SUNSI REVIEW OFFICE RII:DRP RII:DRP SIGNATURE JGW /RA/ RAM /RA/
NAME JWorosilo RMusser DATE 06/05/2009 06/05/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 2 cc w/encl: Donald L. Griffith R. J. Duncan, II Manager Vice President Brunswick Steam Electric Plant Nuclear Operations Progress Energy Carolinas, Inc.
Carolina Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Garry D. Miller Michael J. Annacone Manager Director Site Operations License Renewal Brunswick Steam Electric Plant Progress Energy Progress Energy Carolinas, Inc. Electronic Mail Distribution Electronic Mail Distribution Gene Atkinson Edward L. Wills, Jr. Supervisor, Licensing/Regulatory Programs Plant General Manager Brunswick Steam Electric Plant Brunswick Steam Electric Plant Progress Energy Carolinas, Inc.
Progress Energy Carolinas, Inc. Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr.
Benjamin C. Waldrep Shaw, Pittman, Potts & Trowbridge Vice President 2300 N. Street, NW Brunswick Steam Electric Plant Washington, DC 20037-1128 Progress Energy Carolinas, Inc.
Electronic Mail Distribution Peggy Force Assistant Attorney General Christos Kamilaris State of North Carolina Director P.O. Box 629 Fleet Support Services Raleigh, NC 27602 Carolina Power & Light Company Electronic Mail Distribution Chairman North Carolina Utilities Commission Thomas D. Walt Electronic Mail Distribution Vice President Nuclear Oversight Robert P. Gruber Carolina Power and Light Company Executive Director Electronic Mail Distribution Public Staff - NCUC 4326 Mail Service Center Brian C. McCabe Raleigh, NC 27699-4326 Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc. David R. Sandifer Electronic Mail Distribution Brunswick County Board of Commissioners P.O. Box 249 Phyllis N. Mentel Bolivia, NC 28422 Manager, Support Services Brunswick Steam Electric Plant James Ross Progress Energy Carolinas, Inc. Nuclear Energy Institute Electronic Mail Distribution Electronic Mail Distribution cc w/encl (continued on page 3)
CP&L 3 cc w/encl (continued)
Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Beverly O. Hall Chief, Radiation Protection Section Department of Environmental Health N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Warren Lee Emergency Management Director New Hanover County Department of Emergency Management 230 Government Center Drive Suite 115 Wilmington, NC 28403
CP&L 4 Letter to B. Waldrep from Randall A. Musser dated June 5, 2009
SUBJECT:
MEETING
SUMMARY
- CATEGORY 1 PUBLIC MEETING - ANNUAL ASSESSMENT OF BRUNSWICK STEAM ELECTRIC PLANT, DOCKET NOS.
50-325, 50-324 Distribution w/encl:
C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource Brunswick Steam Electric Plant Annual Assessment Meeting Reactor Oversight Program - 2008 Nuclear Regulatory Commission - Region II Southport, North Carolina June 3, 2009 Enclosure 2
Purpose of Todays Meeting
- A public forum for discussion of Brunswick performance in 2008
- NRC will address the performance issues identified in the annual assessment letter
- Brunswick management will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance 2
Enclosure 2
Agenda
- Review of Reactor Oversight Process
- National Summary of Plant Performance
- Discussion of Plant Performance Results
- NRC and Progress Energy available to address public questions 3
Enclosure 2
NRC Mission
- To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
4 Enclosure 2
NRC Region II Organization Luis Reyes Regional Administrator Victor McCree Deputy Regional Administrator Len Wert Kriss Kennedy Director Division of Reactor Projects Director Division of Reactor Safety Joel Munday Richard Croteau, Deputy Director Acting Deputy Director Harold Christensen, Deputy Director Randall Musser Branch Chief Regional Specialists (404)562-4603 Project Engineers Brunswick Resident Inspectors Kevin Ellis Phil OBryan Jannette Worosilo Greg Kolcum RI Office: (910)457-9531 5
Enclosure 2
Some Nuclear Facts
- More than 100 nuclear power plants supply about 20 percent of the electricity in the U.S.
- Nuclear materials are used in medicine for diagnosis and cancer treatment.
- Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.
6 Enclosure 2
NRC Performance Goals
- Safety: Ensure adequate protection of public health and safety and the environment.
- Security: Ensure adequate protection in the secure use and management of radioactive materials.
7 Enclosure 2
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 8
Enclosure 2
Brunswick Inspection Activities 4,652 hours0.00755 days <br />0.181 hours <br />0.00108 weeks <br />2.48086e-4 months <br /> of inspection-related activities
- Resident Inspector Daily Baseline Inspections
- B.5.b Generic Safety Inspection
- Biennial Problem Identification and Resolution Inspection
- Refueling Outage Inspection
- Triennial Plant Modification Inspection
- Licensed Operator Requalification Inspection
- Triennial Fire Protection Inspection
- Security Baseline Inspection
- Radiation Protection Baseline Inspection
- Special Inspection for a Failed EDG Surveillance
- Supplemental Inspection for a White Performance Indicator - Mitigating Systems Performance Index (MSPI) -Unit 1 Cooling Water Systems 9
Enclosure 2
Significance Threshold Significance of Findings Green: Very low safety issue White: Low to moderate safety issue Yellow: Substantial safety issue Red: High safety issue Regulatory Action for Findings and Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight 10 Enclosure 2
Action Matrix Concept L icens ee R eg ula to ry D eg ra d ed M u ltip le/R ep . U n accep tab le R esp on se R esp on se C o rnersto ne D eg ra d ed P erfo rm a nce C o rnersto ne Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 11 Enclosure 2
National Summary of Plant Performance Status at End of 2008 Licensee Response 86 Regulatory Response 14 Degraded Cornerstone 3 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104 12 Enclosure 2
National Summary
- Performance Indicator Results (end of CY 2008)
- Green 1762
- White 6
- Yellow 0
- Red 0
- Total Inspection Findings (for 2008)
- Green 776
- White 17
- Yellow 0
- Red 0 13 Enclosure 2
Brunswick Assessment Results (January 1 - December 31, 2008)
- All inspection findings were classified as very low safety significance (Green)
- All Performance indicators were Green.
- Brunswicks performance was within the Licensee Response Column of the NRCs Action Matrix.
14 Enclosure 2
Brunswick Annual Assessment Summary (January 1 - December 31, 2008)
- Progress Energy operated Brunswick in a manner that preserved public health and safety.
- All cornerstone objectives were met.
- NRC plans baseline inspections for the remainder of CY2009.
15 Enclosure 2
Open to the Public
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and
- Access the agencys Electronic Reading Room to find NRC publications and documents.
16 Enclosure 2
Contacting the NRC
- (301) 816-5100 (call collect)
- (800) 695-7403
- Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select What We Do for Public Affairs 17 Enclosure 2
Reference Sources
- Reactor Oversight Process
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free) 18 Enclosure 2