MONTHYEARML0507302212005-01-27027 January 2005 1/27/05- Official Transcript of Proceedings-NRC, Brunswick Steam Electric Plant EIS Public Meeting: Afternoon Session. Pages 1-39 Project stage: Request ML0505502622005-02-24024 February 2005 Request for Additional Information Regarding Severe Accident Mitigation Alternatives (SAMA) for the Brunswick Steam Electric Plant, Units 1 and 2 Project stage: RAI ML0509102032005-04-0101 April 2005 Summary of Conference Call Held on January 12, 2005 Between the NRC and Carolina Power & Light Concerning Draft Requests for RAIs Pertaining to Brunswick Project stage: Draft RAI ML0512300642005-04-0606 April 2005 Draft SAMA Response Project stage: Draft Other ML0511902312005-04-29029 April 2005 4-29-2005-Summary of Teleconference Conducted on 03/31/2005, with Carolina Power & Light Company (Cp&L), to Discuss Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Electric Plant Project stage: RAI ML0513702822005-05-16016 May 2005 5-16-05 - Summary of Teleconference of Conducted on April 7, 2005, with Carolina Power & Light Company (Cp&L) to Discuss the Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) for Brunswick Steam Elect Project stage: RAI ML0514404792005-05-24024 May 2005 5-24-05- Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the Applications by Carolina Power & Light Company, Inc (Cp&L) for Renewal of the Operating Licenses for Brunswick Steam Electric Plant, Units 1 Project stage: Approval ML0524301382005-08-30030 August 2005 Notice of Availability of the Draft Plant-Specific Supplement 25 to the Generic Environmental Impact Statement (GEIS) Project stage: Draft Other ML0533204682005-10-18018 October 2005 Preliminary Results of Environmental Review Brunswick Steam Electric Plant, Units 1 and 2, Nuclear Regulatory Commission, October 18, 2005 Project stage: Other ML0533204332005-10-18018 October 2005 Official Transcript of Proceedings, Nuclear Regulatory Commission, Brunswick Steam Electric Plant, Draft EIS: Evening Public Meeting, Southport, Nc, Tuesday, October 18, 2005. Pages 1-24 ML0533204042005-10-18018 October 2005 Official Transcript of Proceedings, Nuclear Regulatory Commission, Brunswick Steam Electric Plant, Draft EIS: Afternoon Meeting, Southport, Nc, Tuesday, October 18, 2005, Pages 1-41 ML0600902822006-01-0404 January 2006 1/4/06 - Project Manager Change for the License Renewal Environmental Review for Brunswick Steam Electric Plant, (TAC Nos MC4641 and MC4642) Project stage: Other ML0610700772006-04-14014 April 2006 4/14/06 - Final Supplement 25 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Regarding Brunswick Steam Electric Plant, Units 1 and 2 (TAC Nos. MC4641 and MC4642) Project stage: Other ML0610302242006-04-14014 April 2006 4/14/06 - Notice of Availability of the Final Supplement 25 to the Generic Environmental Impact Statement (Geis) Regarding License Renewal for Brunswick Steam Electric Plant, Units 1 and 2 (Tac Nos. MC4641 and MC4642) Project stage: Other ML0609004802006-04-30030 April 2006 NUREG-1437 Supp 25, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Brunswick Steam Electric Plant, Units 1 & 2 Final Report Project stage: Acceptance Review ML0613601312006-05-12012 May 2006 Cost-Beneficial Severe Accident Mitigation Alternatives (Samas) Identified During the License Renewal Review for the Brunswick Steam Electric Plant, Units 1 and 2 Project stage: Other 2005-05-16
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML23151A2532023-05-31031 May 2023 Meeting Summary of 2022 Annual Assessment Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324, Meeting Number 20230392 ML22130A0302022-05-0909 May 2022 Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21131A1472021-05-11011 May 2021 Public Meeting Summary 2020 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20210385 ML20136A2222020-05-15015 May 2020 Har - Bru 2019 Aam Meeting Summary ML19254B4692019-09-0909 September 2019 (FEMA Letter NRC 09-09-19) Preliminary Capabilities Assessment - Brunswick Nuclear Power Plant ML19266A5332019-09-0909 September 2019 (FEMA Memo to NRC 9-9-19) Preliminary Capabilities Assessment - Brunswick Nuclear Plant ML19123A3532019-05-0202 May 2019 Public Meeting Summary - Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML18116A1082018-04-26026 April 2018 Summary of Meeting on Annual Assessment Public Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 05000325 and 05000324 ML17137A3332017-05-17017 May 2017 Meeting Summary Regarding 2016 Annual Assessment of the Brunswick Steam Electric Plant for Period of January 01, 2016 Through December 31, 2016 ML17129A3022017-05-17017 May 2017 Office of Nuclear Security and Incident Response Observation of 2017 Security Baseline Inspection at Brunswick Steam Electric Plant, Units 1 & 2 ML17096A3332017-05-0909 May 2017 Verbal Authorization of Relief Request for Reactor Vessel Closure Head Penetration Nozzle N9 Repair ML16286A2372016-10-12012 October 2016 FEMA Assessment of Offsite Plans and Preparedness Post-Hurricane Matthew (October 2016) ML16134A1742016-05-12012 May 2016 Summary of Public Meeting - 2015 Annual Assessment Regarding Brunswick, Units 1 and 2 ML16034A5082016-02-0404 February 2016 Audit Report; Brunswick Steam Electric Plant, Units 1 & 2 Nuclear Facility Request for License Amendments - Adoption of Topical Report ANP-10298P-A, Revision 1 (TAC No. MF5852) ML15303A3962015-12-0808 December 2015 Safety Evaluation Input on Emergency Action Level Scheme Upgrade for Brunswick Steam Electric Plant Units 1 and 2 (TAC No'S. MF5766 and MF5767 ML15125A4602015-05-0505 May 2015 Summary of Public Meeting to Discuss the Annual Assessment of the Brunswick Steam Electric Plant with the Public for the Period of January 1, 2014, Through December 31, 2014 ML14140A1882014-05-19019 May 2014 Summary of Public Meeting - 2013 Annual Assessment Regrading Brunswick Steam Electric Plant ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13221A5122013-08-12012 August 2013 8/20/2013 - Closed Notice of Forthcoming Meeting with Duke Energy Regarding Mella Brunswick Steam Electric Plant, Units 1 and 2 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML12346A2842012-12-18018 December 2012 Forthcoming Public Conference Call Meeting with Duke Energy Carolinas Re Mellla+ for Brunswick Steam Electric Plant, Units 1 and 2, to Discuss the Maximum Extended Load Limit Analysis Plus (Mellla+) Implementation ML12177A4302012-11-0909 November 2012 Task Interface Agreement (Concurrence)-Operability of Brunswick, Unit 2, Reactor Water Cleanup System Isolation Instrumentation with the Inlet Flow Orifice Installed Backwards (TIA 2012-09) ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12160A5732012-06-11011 June 2012 Meeting Notice - Forthcoming Pre-Application Conference Call with Carolina Power and Light Company Regarding National Fire Protection Association Standard 805 for Brunswick Steam Electric Plant, Units 1 and 2 ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12144A2802012-05-23023 May 2012 Notice of Forthcoming Pre-Application Meeting with Carolina Power and Light Company Regarding Emergency Diesel Generator Completion Time Extension for Brunswick Steam Electric Plant, Units 1 and 2 ML12128A3462012-05-10010 May 2012 Meeting Notice - Forthcoming Notice of Pre-application Meeting with Carolina Power & Light Company Regarding NFPA805 ML1132504952011-11-21021 November 2011 Special Inspection Charter to Evaluate Brunswick Reactor Vessel Head Tensioning Issue ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1028504852010-10-0707 October 2010 S. Wastler Memo Technical Assistance Request - Review of Proposed Amendment to the Brunswick Steam Electric Station Plant Physical Security Plan (TAC L24477) ML1015901992010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of Progress Energy Carolina'S Ownership Interest of H.B. Robinson Steam Electric Plant Unit 2, Brunswick Steam Electric Plant Units 1 and 2 & Shearon Harris Nuclear Power Plant Unit ML1015900142010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of North Carolina Eastern Municipal Power Agency'S Ownership Interest of Shearon Harris, Unit 1 and Brunswick, Units 1 and 2 on May 20, 2010 - Finding of No Potential Issues in Bank ML1015805092010-06-0808 June 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of North Carolina Eastern Municipal Power Agency'S Ownership Interest of Shearon Harris, Unit 1 and Brunswick, Units 1 and 2 on May 21, 2010 - Finding of No Potential Issues in Bank ML0815606912008-07-11011 July 2008 Transmittal of Final Accident Sequence Precursor (ASP) Analyses of Operational Events That Occurred at D.C. Cook, Unit 2 on November 8, 2005 and at Brunswick, Unit 2 on November 1, 2006 ML0812802272008-05-0202 May 2008 Memorandum from Hubert T. Bell to Chairman Dale E. Klein, NRC Staff Review of License Renewal Applications ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0733711662007-12-0303 December 2007 Notice of Meeting with Progress Energy & Duke Energy Regarding Fire Probabilistic Risk Assessment for the Pilot Plants Transitioning to the National Fire Protection Association Standard NFPA 805 ML0717601722007-06-25025 June 2007 Summary of Closed Meeting with Progress Energy to Discuss Security Threat-Based Event Emergency Preparedness (EP) Drill at the Brunswick Steam Electric Plant ML0715503752007-06-0404 June 2007 Notice of Meeting with Brunswick Steam Electric Plant Regarding Security-Based Event Emergency Preparedness Drill Scenario Review ML0614505922006-05-26026 May 2006 Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report ML0613601312006-05-12012 May 2006 Cost-Beneficial Severe Accident Mitigation Alternatives (Samas) Identified During the License Renewal Review for the Brunswick Steam Electric Plant, Units 1 and 2 ML0601003992006-01-0404 January 2006 1/4/06 - Trip Report - November 29, 2005, Essential Fish Habitat Meeting and Tour ML0526503162005-09-23023 September 2005 Notice of Category 1 Meeting with Carolina Power and Light Co., Brunswick Units 1 and 2 MSIV TS Revisions ML0515803862005-06-0707 June 2005 Ltr, Request for Emergency Publication ML0232903632004-09-29029 September 2004 RAI Data for Incorporation Into Power Uprate Review Standard 2023-05-31
[Table view] |
Text
MEMORANDUM TO: Michael Marshall, Jr. Branch ChiefMay 12, 2006Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationFROM: Rani Franovich, Branch Chief/RA/Environmental Section B Division of License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
COST-BENEFICIAL SEVERE ACCIDENT MITIGATION ALTERNATIVES IDENTIFIED DURING THE LICENSE RENEWAL REVIEW FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 (TAC NOS.
MC4641 AND MC4642)The Division of License Renewal, Environmental Section B is referring the cost-beneficialsevere accident mitigation alternatives (SAMAs) that were identified during the environmentalportion of the license renewal reviews for Brunswick Steam Electric Plant, Units 1 and 2 (BSEP) to Plant Licensing Branch II-2 for disposition. Chapter 5 and Appendix G (of the enclosed NUREG 1437 ?Supplement 25, to the Generic Environmental Impact Statement for LicenseRenewal of Nuclear Plants), regarding Brunswick Steam Electric Plant, Units 1 and 2" (SEIS) contain the analysis that identified the cost-beneficial SAMAs. These cost-beneficial SAMAs are not related to aging management and, therefore, were not within the scope of Title 10 of theCode of Federal Regulations Part 54 (10 CFR Part 54), the license renewal rule. Since theSAMAs were not within the scope of the license renewal rule, the staff did not require Carolina Power & Light (CP&L), now doing business as Progress Energy Carolinas, Inc., the licensee for BSEP, to implement the cost-beneficial SAMAs during license renewal. CP&L has committed to further evaluate these SAMAs that may remain potentially cost-beneficial (SAMAs 1, 6, 13, 15, 16, 17, 18, 19, 25, 29, 30, 31, 32, 34, and 36).The staff found that fifteen SAMAs may be determined to be cost-beneficial if a more detailedevaluation were performed. The fifteen SAMAs are as follows:1. Portable generator for direct current (DC) power,
- 6. Proceduralize all potential 4-kV alternating current bus cross-tie actions, 13.Install an interunit control rod drive cross-tie, 15.Diverse emergency diesel generators (EDG) HVAC logic,
- 16. Diverse swing diesel generators air compressor, 17.Provide alternate feeds to panels supplied only by DC bus 2A-,
18.Provide alternate feeds to essential loads directly from an alternate emergency bus, M. Marshall-2-19.Provide an alternate means of supplying the instrument air header,25.Proceduralize battery charger high-voltage shutdown circuit inhibit, 29.Portable EDG fuel oil transfer pump, 30.Improve alternate shutdown panel, 31.Improved alternate shutdown training and equipment, 32.Add automatic fire suppressi on system,34.Provide supplemental power supplies for offsite power recovery after battery depletion during station blackout, and36.Use fire-fighting water as a backup for containment spray.Mr. Robert Palla of PRA Licensing Branch A, DRA, performed the reviewand should be consulted for any additional information regarding the cost-beneficial SAMAs.If you have any other questions concerning this matter, please contact the environmental project manager for the BSEP license renewal review, Ms. Alicia R. Williamson, at 301-415-1878 or via e-mail at arw1@nrc.gov
.Docket Nos. 50-325 and 50-324
Enclosure:
Supplement 25 to the GEIS
ML061300131G\ADRO\DLR\REBB\Brunswick\FSEISLetters\Cost-Beneficial SAMA Letter.wpdOFFICEDLR:LADNRL:GSPM:DLR:REBB:GSDLR:REBB:SCNAMEIKingCGuerreroAWilliamsonRFranovichDATE05/ 10 /0605/ 10 /0605/ 10 /0605/ 12 /06