UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2012 LICENSEES: CAROLINA POWER & LIGHT COMPANY FACILITIES: BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2
SUBJECT:
SUMMARY
OF MAY 31, 2012, PREAPPLICATION MEETING WITH CAROLINA POWER & LIGHT COMPANY ON TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD (NFPA) 805 REQUIREMENTS FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 On May 31, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and Progress Energy, representing Carolina Power & Light Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's planned submittal of a license amendment request to transition to the requirements of the National Fire Protection Association Standard 805 (NFPA 805) pursuant to Section 50.48(c) of Title 10 of Code of Federal Regulations (10 CFR) for Brunswick Steam Electric Plant, Unit Nos. 1 and 2 (Brunswick). The meeting notice and agenda dated May 10, 2012, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML12128A346. The licensee's meeting slide presentation is available at ADAMS Accession No. ML12152A145. A list of attendees is enclosed.
The meeting was a follow-up to a public meeting held on April 12, 2011, between the NRC and Progress Energy regarding transition to the requirements of the NFPA 805 (meeting summary is available at ADAMS Accession No. ML11116A020). Progress Energy's NFPA 805 Project Manager began the licensee's presentation by providing the NFPA 805 Project Milestones (page 6 of slides) for the fleet and Brunswick Project Status (page 7 of slides). The licensee indicated that it is on track for the September 30, 2012, submittal of a license amendment request (LAR) to support the transition to NFPA 805 for Brunswick. The NRC staff commented that currently NRC's reviews of the NFPA 805 amendment requests are planned to be completed in 2 years.
Progress Energy presented an overview of the planned Brunswick LAR that included discussions of classical fire protection, NFPA 805 monitoring, nuclear capability safety assessment, planned modifications at Brunswick, treatment of generic request for additional information, and the LAR document (pages 8 through 15 of slides). During the meeting, Progress Energy staff present at the meeting discussed the presentation slides and responded to the NRC staff questions. The NRC staff pointed out that the LAR submittal should address the impact of fire in one unit to the other unit and also address Brunswick's plant specific defense in depth and safety margin evaluation. Additional information was provided by the licensee's personnel that participated by phone, as needed.
- 2 Progress Energy presented the slides for Brunswick fire probabilistic risk assessment (PRA) overview, important areas and scenarios, and fire PRA peer review. The NRC staff pointed out that the Brunswick LAR needs to address motor control center severity fraction (page 17 of slides) for Brunswick. At the conclusion of the meeting, the NRC staff and the licensee agreed to have additional discussions, prior to the LAR submittal, regarding incipient detection in main control boards, cable spread room, and solid bottom cable tray treatments (page 19 of slides).
A follow up public conference call is scheduled to be held on Tuesday, June 26, 2012 (ADAMS Accession No. ML12160A573).
No member of the public was in attendance or on the phone. No meeting feedback was received.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely, c.
Farideh Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosure:
List of Attendees cc w/encl: Distribution via ListServ
MAY 31,2012 LIST OF ArrENDEES PRE-APPLICATION MEETING BETWEEN THE U.S NUCLEAR REGULATORY COMMISSION AND CAROLINA POWER & LIGHT COMPANY REGARDING NFPA-805 FOR BRUNSWICK UNIT NOS. 1 AND 2 Nuclear Regulatory Commission Progress Energy A. Klein J. Ertman D. Harrison A. Holder U.Shoop E. Weigert S. Dinsmore J. Becker H. Barrett L. Grzeck G. Cooper K. Lavin J. Robinson L. Fields Progress Energy - Call in B. Metzger R. Conatser L. Van Eeden F. Saba S. Hardy R. Stewart NRC -Call in C. Browne M. King R. Smith R. Layton (NRC's consultant)
S. Brinkman Enclosure
- 2 Progress Energy presented the slides for Brunswick fire probabilistic risk assessment (PRA) overview, important areas and scenarios, and fire PRA peer review. The NRC staff pointed out that the Brunswick LAR needs to address motor control center severity fraction (page 17 of slides) for Brunswick. At the conclusion of the meeting, the NRC staff and the licensee agreed to have additional discussions, prior to the LAR submittal, regarding incipient detection in main control boards, cable spread room, and solid bottom cable tray treatments (page 19 of slides).
A follow up public conference call is scheduled to be held on Tuesday, June 26, 2012 (ADAMS Accession No. ML12160A573).
No member of the public was in attendance or on the phone. No meeting feedback was received.
Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely, IRA!
Farideh Saba, Senior Project Manager Plant licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosure:
List of Attendees cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC RidsOgcRp PLain, NRR LPL2-2 Branch Reading RidsRgn2MailCenter RidsNrrDra RidsAcrsAcnw _MailCTR TWertz, NRR RidsNrrDraAfpb RidsNrrDorlLpl2-2 SDinsmore, NRR RidsNrrDraApla RidsNrrPMBrunswick DPickett, NRR RidsNrrLABTuJly MMcCoppin, EDO R-II ADAMS A N
PKG ML12167A040 ccesslon os.
N' ML 2128A346 olice 1
Summary ML12167A043 H
d ML12152A145 an outs OFFICE N
DATE DORULPL2-2 IPM FSaba 61 19 112 DORULPL2-2/LA BTuily 61 19 112 DRAlAPLAlBC (for)
DHarrison (S. M. Wong) 61 20 112 DRAlAFPB/BC AKlein (with comments) 61 21 112 OFFICE NAME DATE DORULPL2-2/BC DBroaddus 61 25 112 DORULPL2-2 IPM FSaba il OFFICIAL RECORD COpy