Monthly Operating Rept for May 1992 for Re Ginna Npp.W/ 920616 Ltr
ML17262A901
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/31/1992
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9206240172
Download: ML17262A901 (9)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULAT( INFORMATION DISTRIBUTION+STEM (RIDE)

ACCESSION NBR:9206240172 DOC.DATE: 92/05/31 NOTARIZED: NO DOCKET ¹ FACIL 50-.244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTII . NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas a Electric Corp.

MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for June 1992 for RE Ginna NPP.W/

920616 ltr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR i ENCL i SIZE: D TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDl-3 LA 3 3 PD1-3 PD 1 1 D JOHNSON,A 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB NRQQD BEB10 1 1 NRR/DOEA/OEAB EG FILE 01 1 1 RGNl EXTERNAL: EGGG BRYCE,J.H 1

~

1 1 NRC PDR 1 NSIC 1 1 jt 7)e'f79'P(l D

D D

NOTE fO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

0 P

I'

rtt ZNFIIZg I/SIC rrm q/ PIE/gli/

r'////Su I //ZIF//ri'OCHESTER GAS AND ELECTRIC CORPORATION 89 EAST AVENUE, ROCHESTER N. K 14649-0001 ROBERT C. MECREDY TELEPHONE Vlcc President AltEACODE 71B 546 2700 Clnna Nudear Production GINNA STATION June 16, 1992 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for May 1992 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of May 1992.

Very truly yours, Robert C. Mecredy Attachments c: Mr. Thorn s T. Martin NRC (1) gu N4~~

9 6,0~0.4.

920b240i72 920b'ib 05000244 PDR'"'ADQCK R

PDR.

II II I,

S II II. Il h

OPERATING DATA REPORT DOCKET HO. 50-244 DATE June 5 1992 COMPLETED BY Robert E. Dodge TELEPHOHE 315 524.4446 ext. 396 OPERATING STATUS 1 ~ Unit Name: R.E. GINNA NUCLEAR POWER PLANT Notes: The unit was placed on the

2. Reporting Period: Ma 1992 line on May 11, 1992 at 2212
3. Licensed Thermal Power (MWt): 1520 and remained there at the
4. Nameplate Rating (Gross MWe): 490 end of the report period.
5. Design Electrical Rating (Net MWe): 470
6. Maximm DependableCapacity (Gross MWe): 490 74 Maximm Dependable Capacity (Net MWe): 470
8. If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr. ~ to-Date Cwaiative 11 Hours In Report Period 744 3647 197 753.45

'2.

Nunber of Hours Reactor Was Critical 536.62 2549.09 155 880.05

13. Reactor Reserve Shutdown Hours 1 687.55
14. Hours Generator On-Line 481.75 2465.50 153 170.88
15. Unit Reserve Shutdown Hours 8.5
16. Gross Thermal Energy Generated (MWH) 610 650 3 367 002 216 581 515
17. Gross Electrical Energy Generated (MWH) 207 876 1 139 604 71 469 211
18. Net Electrical Energy Generated (MWH) 196 657 1 079 684 67 832 231
19. Unit Service Factor 64.75% 67.60% 77.61%
20. Unit Availability Factor 64.75% 67.60%

21 ~ Unit Capacity Factor (Using MDC Net) 56.24% 62.%C 74.34%

22. Unit Capacity Factor (Using DER Net) 56.24% 62.99/ 74.34%
23. Unit Forced Outage Rate 3.58/ 6.01%
24. Shutdowns Scheduled Over Next 6'Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: 05-09.92
26. Units In Test Status (Prior to Comnerclai Operation): Forecast Achieved INITIAL CRITICALI 7Y INITIAL ELECTRICITY COMMERCIAL OPERATION
  • CUMULATIVE TOTAL COMMENCING JANUARY 1, 1975
    • CUMULATIVETOTAL COMMENCING NOVEMBER 8, 1969

0

/

t AVERAGE DAILY UNIT t

POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE June 15 992 COMPLETED BY Robert E. D dge TELEPHONE 1 315 524-4446 . ext. 396 MONTH Ma 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

17. 451 2

3 4

~

~

~

18.

19 20.

'78 478 478

5. -12 21. 477
6. -15 22. 477 7 ~ -14 23. 476 8 ~ -14 24. 474 9 ~ -14 25. 474
10. -15 26. 477

-12 27. 478

12. 106 28. 480 13.

14 15.

'57 119 275 29.

30.

31.

479 480 480

16. 294 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

DO(:KI".I'O. ~0-244 IINI'I NAMI: R.E. GINNA NVCLEAtc POWER PLANT~

~

UNIT SHUTDOWN AND POWER REDUCTIONS DA" I'

(:OMPLI:.TI-:D BY REPORT MONTH TI'.LI'.PIIONI: (315) 524-4446 Ext. 3)6 h

c Ol ~M0 C O tA 0 C S Licensee EWh c Cause gl Corrective 0 0 0 0 Ho. Date o > n'. Event Action to l0 0 lO 0 Ol 0 O

0 lb C Report cf

%A 0

(J go 0

Prevent Recurrence 0

Cl The unit was.placed on the line May 11 at 2212 and remained on the line at the end of report period.

1 3 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 14fanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Ocher (Explain) 0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

REV. 4/8 $ 4949 Hither (Explain) Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE.

DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE June 5 1992 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 ext. 396 MONTH Ma 1992 The unit was placed on the line on May Annual Refueling and Maintenance Outage.

ll at 2212 following the