MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr 1999-09-30
[Table view] |
Text
AVIIQBE DAILY UNIT PURER LEVEL ~
DOCKET No. 50-250 UNIT Turkey Point f3 DATE December 15 1988 COMPLETED BY D. H. Bonett TELEPHONE 407 694-4432
.NNTH Nov m r DAY AVERAGE DAILY PSKR LEVEL (K Me-Nct) 11/ 1/88 11/ 2/88 4 11/ 3/88 11/ 4/88 -6 11/ 5/88 -6 11/ 6/88 -6 11/ 7/88 -6 11/ 8/88 -6 11/ 9/88 -6 11/10/88 -6 11/11/88 -5 11/12/88 -4 11/13/88 -5 11/14/88 -5 11/15/88 -5 11/16/88 -5 11/17/88 -5 11/18/88'1/19/88
-5
-6 11/20/88 -6 11/21/88 -6 11/22/88 -7 11/23/88 -7 11/24/88 -7 11/25/88 -7 11/26/88 -6 11/27/88 -7 11/28/88 -8 11/29/88 11/30/88 8812200013 881213 PDR ADOCK 05000250 R PDC
Ot ~,
li fl I
OF'ERATING DATA REF'ORT DOCKET HO 50 250 DATE 12/ 8/88 COMPLETED BY D. M,+ BONETT TELEPHONE 407/694/4432 OPERATXNG STATUS UNIT HANE: TURKEY POXHT UHXT 3 2t REPORTING PERIOD 'OVEMBER 1988 3+ LXCENSED THERMAL POWER (NWT); 2200 NAMEF'LATE RATING ( GROSS MWE)'i 760 5 t DESIGN ELECTRICAL RATING (NET MWE) + 693 6+ MAXIMUM DEF'ENDABLE CAPACITY (GROSS MWE) + 699 7 t MAXXMUN DEPEHDABLE CAPACITY (HET MWE) + 666 Bi XF'HANGES OCCUR 1N CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SXHCE LAST REPORT ~ GIVE REASONS ~
9i POWER LEVEL TO WHICH RESTRICTED'F *HY (HET MWE>
18+ REASOHS FOR RESTRICTIONS r IF ANY+
MOHTHLY - YTD- CUMULATIVE ll+ IN REPORT PERIOD! 720 8040 148169ih 121 HUNBER OF HOURS REACTOR WAS CRITICAL 8+8 5488ii 93383.7 131 REACTOR RESERVE SHUTDOWN HOURS ewe 8+8 844 '
14+'OURSHOURS GENERATOR ON-LINE e,e 532243 92157+4 151 UNIT RESERVE SHUTDOWN HOURS eie 8 i8 121+8 16+ GROSS THERMAL ENERGY GENERATED (NWH) 0 11389486 191193749 17+ GROSS ELECTR1CAL ENERGY GENERATED (NWH) 0 3664525 61262526 NET ELECTRXCAL EHERGY GENERATED (NWH> -5037 3462926 57941712 18'9+
UNIT. SERVICE FACTOR 8.0 66.2 65o7 28'1 UNIT AVAILABILITYFACTOR eie 66+2 65+8
+ CAF'AC1TY FACTOR (US1NG NDC NET) eie 64+7 63i4
- 22. CAPACITY FACTOR ( USING DER NET ) 0~0 62i2 59+6 23 t UNIT FORCED OUTAGE RATE 188+8 33+8 1211 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
+ C'Jo IF SHUT DOWN AT END OF REPORT PERIOD r ESTIMATED DATE OF STARTUP t 12/ih/88
0 '
UNlT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
~Tk Pi Ui DATE December 15, 1988 COMPLETED BY REPORT MONTH . N TELEPHONE Method of Shutting Ucensee Cause 8 Corrective Duration Down Event Component Action to Date Type (Hours) Reason~ Reactor Reports'ystem Code4 Codes PreventRecurrence 881001 F 720 6ENERA Unit f3 remained shutdown for electrical generator rotor replace=.
ment.
F Forced Reason Method Exhibit G-instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG%161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)
I ld
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Paint Unit f3 DATE December 15 1988 COMPLETED BY D. H. Bonett TELEPHONE {407) 694-4432 REPORT MONTH See the "Unit Shutdowns and Power. Reductions" for Vnit f3.
AVEE. OAILV UNIT PURER LEVEL DOCKET NO. 50-251 UNIT Turkey Point 84 DATE December 15 1 88 CONPLETED D. H. Bonett 694-4432 BY'ELEPHONE 407
- NNTH Nov DAY AVERAGE DAILY'tNER LEVEL (N Me-Net) li/ 1/88 1'1/ 2/88
-1
-1 11/'/88 -1
-1 11/ 4/88 ii/ 5/88 11/ 6/88
-1
-1 11/ 7/88 -1 11/ 8/88 -1 11/ 9/88'1/1'0/88 -1 11/11/88 ii/12'/88 -1 11/13/88 11/14/88 -1 11/15/88 -1 11/16/88 -1 11'/17/88 11/18/88 -1 11/19/88 -1 11/20/88 -1 11/21/88 11/22/88 -1 11/23/88 0 11/24/88 0 11/25/88 0 li/26/88 0
-1 1'1/27/88 11/28/88 . 0
,11/29/88 11/30/88 0
Qt OPERATING DAT* REF'ORT DOCKET NO 50 251 DATE 12/ 8/88 COMPLETED BY Di M+ BONETT TELEF'HONE 407/694/4432 OPERATING STATUS 1+ UNIT NAME t TURKEY POINT UNIT 2 i REPORTING PERIOD t NOVEMBER 1988 3+ LICENSED THERMAL POHER (MHT) i 2200
- 4. NAMEF'LATE RATING (GROSS MME): 760 5+ DESIGN ELECTRIC*L RATING (NET MME) + 693 6i MAXIMUM DEF'ENDABLE CAF'ACITY (GROSS MME) + 699 7i MAXIMUM DEPENDABLE CAF'ACXTY (NET MME) t 666 8+ IF CHANGFS OCCUR XN CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT ~ GIVE REASONS:
POHER LEVEL TQ WHICH RESTRICTED IF ANY (NET MME) 10 RE*SONS FOR RESTRICTIONS'F ANY'ONTHLY
- YTD- CUMULATIVE ii+ HOURS IN REPORT F'ERIODt 720 8040 133901+0 12 o NUMBER OF HOURS REACTOR HAS CRXTICAL 0 i0 505e,l 90236+6 13'EACTOR RESERVE SHUTDOWN HOURS eiO OiO 166+6 14 o HOURS GENER*TOR QN-LINE Oie 4988.0 87194.1 15, UNIT r'ESEr'vE SHUTDowN HQURS 0~0 e,e 32+1 lhi GROSS THFRMAL ENERGY GENERATED (MRH) 0 10626797 184082420 17 GROSS ELFCTRICAL ENEr'GY GENER*TED < MHH) 0 3449038 587488e2 18 NET ELECTRIC*L ENERGY GENERATED < MHH) -1091 3265354 55584136 19 i UNIT SERVXCE FACTOR 0.0 62 e 65+1
- 20. UNIT *VAIL*BILITYFACTOR 0+0 62.0 65+1 21 C*F'ACXTY FACTOR (USING MPC NFT) 0.0 hi+0 63+6 22'AF'ACITY FACTOR (USING DER NET) 0+0 58ih 59i9
- 23. UNIT FORCED OUTAGE RATE e,e 19'
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 'MONTHS 25 XF SHUT DOWN AT END OF REF'ORT PERIODS ESTXMATED DATE OF STARTUP; 3/15/89
Ol UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNlT NAME Turke Point Unit. f4 DATE December 15, 1988 COMPLETED BY D REPORT MONTH .. November 1988 Method of Shutting Ucensee Cause 8 Corrective No. Date Type Duration (Hours) Reason2 Down Reactor" Event Report i'ystem Code4 Component Codes Actionto Prevent Recurrence 13 880920 720 RC FUELXX Unit 84 remained shutdown for refue1ing and schedu1ed maintenance.
F Forced Reason Method Exhibit G-Instructions S Scheduled A - EquipmentFailure(Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram EntryScheetsUcensee C - Refueling 3 - Automatic Scram EventReport(LER)File D - Regulatory Restriction 4 - Continued (NUREG%161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Exphin)
G - Operational Error (Explain) Exhibit 1-.Same Source H - Other(Explain)
0
SUMMARY
OF OPERATING EXPERIENCE
~
DOCKET NO. 50-251 UNIT Turke Point Unit DATE December 15 1988 COMPLETED BY D. N. Bonett TELEPHONE (407 694-4432 REPORT MONTH Novemb Unit f4 remained shutdown for refue1ing and schedu1ed maintenance.
4i All66 DAILY UNIT 'PDMER LEVEL' DOCKET 'NO. 50-335 UNIT St. Lucie P1 DATE December 15 1988 CONPLETED BY, D. N. Bonett TELEPHONE 407 694-4432 NNTH November 1988 DAY (N ~t)
AVERAGE DAILY PMER LEVEL 11/ 1/88 868 11/ 2/88 870 il/
11/
3/88 870, 870 5/88 4/88'1/
869 11/ 6/88 869 11/ 7/88 870 11/ 8/88 86,9 il/
ii/10/88 9/88 868 867 11/11/88 866 11/12/88'i/13/88 865 867 11/14'/88 867 il/15/88 867 11/16/88 867 11/17/88 866 11/18/88 866 11/19/88 864 11/20/88 864 11/21/88 863 11/22/88 863
'1'1/23/88 864 11/24/88 865 11/25/88 865 11/26/88 867 11/27/88 866 11/28/88 865 11/29/88 S64 11/30/88 864
Ot I OPERATING DATA REF'ORT DOCKET NO 50 335 DATE 12/ 8/88 COMPI ETED BY Dt Mt BOHETT TELEF'HONE 407/694/4432 OPER*TING ST*TUS 1, UHXT N*ME: ST. LUCIE UNIT 2 t RFPORTING PERIOD t NOVEMBER 1988 3t LICEHSFD THERMAL POWER (MWT) t 2700 4 t HAMEF'LATE RATING (GROSS MWE) t 858
- 5. DESIGN ELECTRICAL RATING (HET MWE): 830 6 t MAXIMUM DEF'ENDABLE CAF'ACITY ( GROSS MWE) t 872 7 MAXIMUM DEPEHDABLE CAPACITY (NET MWE): 839 8 t XF'HANGES OCCUR IN C*F'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SIHCE I AST REPORT v GIVE REASONS t POWER LEVEL TO WHICH RESTRICTED XF *HY (NET MWE) 10 t RE*SONS FOR 'RESTRICTIONS ~ IF ANY
'ONTHLY - YTD- CUMULATIVE l1 t HOURS IH REF'ORT F'ERIOD t 720 8040 184712tO
- 12. NUMBER OF HOURS REACTOR W*S CRITICAL 720t0 6810t3 78354t6 13t RLACTOR RESERVE SHUTDOWN HOURS Ot0 OtO 205t3 14 t HOURS GENERATOR ON-LINE 720t0 6665t5 77635t3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39t3 16t GROSS THERMAL ENERGY GENERATED <MWH) 1944291 17734682 199082352 17t GROSS ELECTRICAL ENERGY GENFRATED (MWH) 656848 5948228 65463805
- 18. HET ELECTRICAL ENERGY GENERATED MWH) < 623858 5628624 61829791 19 t UNIT SERVICE F*CTOR 100t0 82t'9 74t1 20, UHXT A VAILABILI'I'YFACTOR 188,8 82t9 74t2 21t CAF'ACXTY I=ACTOR (USING MDC HFT) 103t3 83t4 7dt5 22t CAPACITY FACTOR (USING DER HET) 104,4 84t3 72 t 3 23t UHIT FORCED OUTAGE RATE 0.0 1t7 3t8 24t SHUTDOWHS SCHEDULED OVER NEXT 6 MONTHS
~5 ~ XF SHUT DOWN AT END OF REF'ORT F'ERIOD ~ ESTIMATED DATE OF STARTUF':
4i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 5-uNITNAME St. Lucie Unit $ 1.
DATE December 15 1988 COMPLETED ey D. M.. Bonett REPORT MONTH November 1988 TELEPHONE Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes Prevent Recurrence Unit f1 operated at essentially full power and had no shutdowns or significant power reductions.
2 F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 -. Manual for Preparation of Data B - Maintenance or Test 2 - Mariual Scram EntryScheetsUcensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4- Continued (NUREG%161)
E - Operator Training & Ucense Examination 5- LoadReduction F - Administrative 9 - Other(Explain)
G - Oper'ational Error (Explain) Exhibit1-Same Source H - Other (Explain)
~ i 0 r
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
UNIT, St. Lucie Unit f1
.DATE December 15. 1988 TELEPHONE'0-335 D. N. Bonett COMPLETED BY (40~) 694-4e3Z
'REPORT MONTH St. L'ucie Unit 81 operated at essentially full'ower and had no shutdowns or significant power reductions.
In accordance with requirements of Technical. Specification 6.9.1.6. there were no challenges to PORV or, safety valves during the report month.
Qt AVEE DAILY UNIT PONER LEYEL DOCKET NQ. 50-389 UNIT St. Lucie II2 DATE December 15 1988 CONPLETED BY D. H. Bonett TELEPHONE - 432 NNTH November 1988 DAY AVERAGE. DAILY PSKR, LfVEL (N Qt-Net) 1 1-/ 1/88 846 11/ 2/88 846 11/ 3/88 846 li/
ll/ 4/88 5/88 846 li/ 6/88 1'1/ 7/88 844 843 ii/ 8/88 11/ 9/88 843 841 844 11/10/88 838 11/11/88 836 11/12/88 837 11/13/88 836 11/14/88 836 il/15/88 836 11/16/88 834 11/17/88 833 ii/18/88 832 11/19/88 827 11/20/88 827 ii/21/88 823 11/22/88 817 il/23/88 824 11'/24/88 814 il/25/88 612 ii/26/88 720 il/27/88 853" 11/28/88 856 11/29/88 '856 11/30/88 856
~ i r OF'ERATING DATA REF'ORT DOCKET NO 50 38'9 DATE 12/ 8/88 COMPLETED BY Do M. BONETT TELEF'HONE 407/694/4432 OPERATING STA'TUS 1 UNIT NAME'T LUCIE UNXT 2
- 2. REPORTING PERIOD: NOUEMBER 1988 3+ LICEHSED THERMAL POWER (MWT) + 2700
- 4. NAMEF'LATE RATING (GROSS MWE):
- 5. DESIGN ELECTRICAL R*TING (HET MWE) +
6, MAXIMUM DEF'ENDABLE C*F'ACITY (GROSS MWE):
7 MAXIMUM DEPENDABLE CAPACITY (HET MWE) '39 850 830 882 8+ IF CHANGES OCCUR XN CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH SIHCE LAST REPORT r GIUE REASONS i 7) 9i POWER LEUEL TO WHICH RESTRICTEDr IF *HY (HET MWE) in'EASOHS FOR RESTRICTXOHSr XF ANY+
MONTHLY - YTD- CUMULATIVE IN REF'ORT PERIOD e 72e 8040 46609.e
,12'3 NUMBER" OF HOURS REACTOR WAS CRXTICAL 728+0 8040iO 40798+0 t REACTOR RESERVE SHUTDOWN HOURS OiO 0 in 0+0 14'5 HOURS GENERATOR ON-LINE 720+0 8040' 4ee77 t UNIT RESERUE SHUTDOWN HOURS Oie OoO OiO l'6 . GROSS THERMAL ENERGY GENER*TED (MWH) 1918259 21477922 104474562 24'OURS 17 4 GROSS ELECTRICAL ENERGY GENERATED (MWH) 628210 7135960 34824620 18 NET ELECTRICAL ENERGY GENERATED (MWH) 595196 6768779 32936567 19+ UNIT SLR VICE FACTOR 108 iO ice,e 86+0
'20+ UNIT AUAILABILITYFACTOR 100' 100+0 86+0 2 1 CAF'ACXTY FACTOR ( USING MDC NET ) 98' 100+3 86o4 22'3 CAPACITY FACTOR (USING DER NET) 99+6 101.4 86i2 t UNIT FORCFD OUTAGE RATE e.e OiO 5i9 SHUTDOWNS SCHEDULED OUER NEXT 6 MOHTHS REFUELXNG 2/4/89 SCHEDULED FOR,83 DAYS
,25. XF SHUT DOWN AT END OF REF'ORT F'ERIOD r ESTIMATED DATE OF STARTUF':
I r
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50" 389 UNlTNAME St. Lucie Unit $ 2, DATE COMPLETED BY REPORT MONTH November 1988 Method of No. Date Type Duration (Hours) Reasons Shutting Down Reactor Licensee Event Reports'ystem Code4 Code'ause Component
& Corrective Action to Prevent Recurrence 04 881124 0.0 HF HTEXCH Unit f2 reduced power for waterbox cl eaning. Following waterbox cleaning, unit returned to power.
2 F Forced Reason Method Exhibit G- instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsUcensee C - Refueling 3 - Automatic Scram Event Report (LER) Re D - Regulatory Restriction 4 - Continued (NUREG4161)
E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)
G - Operational Error(Explain) Exhibit1-Same Source H - Other (Explain)
i 0
SUMMARY
OF OPERATING EXPERIENC DOCKET NO. 50-389 UNIT ,St. Lucie Unit g2 DATE December 15. 1988 COMPLETED BY '. R..Bonett TELEPHONE (407) 694-4432 REPORT MONTH November. 1988 See the "Unit .Shutdowns and Power Reductions" sheet for Unit f2.
In accordance with requirements of Technical Specification 6.9.1.6. there were no challenges to PORV or safety valves during the report month.
1 1 V
(
0