L-88-524, Forwards Monthly Operating Status Repts for Nov 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Unit Shutdown & Power Reductions Rept for Turkey Point Unit 3 for Oct 1988

From kanterella
(Redirected from ML17345A580)
Jump to navigation Jump to search
Forwards Monthly Operating Status Repts for Nov 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Unit Shutdown & Power Reductions Rept for Turkey Point Unit 3 for Oct 1988
ML17345A580
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 12/13/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17345A581 List:
References
L-88-524, NUDOCS 8812200008
Download: ML17345A580 (4)


Text

D1STR "RUT1 ON DEMONSTRUT'>N SYSTEM ACCESSION NBR FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME CONWAY,W.F.

RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

8812200008 DOC. DATE: 88/12/13 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Uni;t 4, Flori'da Power and Light C St. Lucie Plant, Unit 1, Florida Power

& Light Co.

St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTHOR AFFILIATION Florida Power

& Light Co.

RECIPIENT AFFILIATION-Document Control Branch (Document Control Desk)

DOCKET 05000000 05000250 05000251 05000335 05000389 R

SUBJECT:

Forwards monthly operating status repts for Nov 1988 for Turkey Point Units 3

4

& St Lucie Units 1

& 2.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR l ENCL J SIZE:

l+lg TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 Rye%

10 REG 01 EXTERNAL: EG&G SIMPSON, F LPDR NSIC COPIES LTTR ENCL 1

0 1

0 10 10 1'

1 1

1 1

.1 1

1 1

2 2

1 1

RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 5

5 1

0 1

1 2.

2 1

1 1

1 1

1 1

1 1

1 R

I h

NOZZ 'lO ALL "RIDS" RECIPIENIS:

PIZASE HELP US TO REDUCE HASTE.'ONTACT 'IHE DOCUMENI'GNIBDLDESK, ROOM Pl-37 (EXT. 20079)

TO EIIIKKATEYOUR NME FROM DISTRIBUTION LISTS POR DOCK2KNI'S YOU DON'.'NEEDt TOTAL NUMBER OF COPIES REQUIRED:

LTTR 34 ENCL 31

~ 4 1:

1

~X P.O.Box14000,Juno Boach,FL 33408-0420 DEGEMBER 4 8 1988 L-88-524 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

RE:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.

Additionally, a corrected copy of the Unit Shutdown and Power Reductions Report for Turkey Point Unit 3 for the month of October 1988 is attached.

The duration of hours should read 723.6 instead of 722.6, a difference of one hour due to daylight savings time.

Should there be any questions please contact us.

Very truly yours, W. F.

Conway Senior Vice President Nuclear WFC/DMB Attachments cc:

Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident. Inspector, USNRC, St. Lucie Plant SSi'220000S SS12i3 PDR AGOCK 05000250 R

PDC an FPL Group company