L-88-524, Forwards Monthly Operating Status Repts for Nov 1988 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Unit Shutdown & Power Reductions Rept for Turkey Point Unit 3 for Oct 1988
| ML17345A580 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point, 05000000 |
| Issue date: | 12/13/1988 |
| From: | Conway W FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML17345A581 | List: |
| References | |
| L-88-524, NUDOCS 8812200008 | |
| Download: ML17345A580 (4) | |
Text
D1STR "RUT1 ON DEMONSTRUT'>N SYSTEM ACCESSION NBR FACIL:50-000 50-250 50-251 50-335 50-389 AUTH.NAME CONWAY,W.F.
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
- 8812200008 DOC. DATE: 88/12/13 NOTARIZED: NO Generic Docket Turkey Point Plant, Unit 3, Florida Power and Light C Turkey Point Plant, Uni;t 4, Flori'da Power and Light C St. Lucie Plant, Unit 1, Florida Power
& Light Co.
St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTHOR AFFILIATION Florida Power
& Light Co.
RECIPIENT AFFILIATION-Document Control Branch (Document Control Desk)
DOCKET 05000000 05000250 05000251 05000335 05000389 R
SUBJECT:
Forwards monthly operating status repts for Nov 1988 for Turkey Point Units 3
4
& St Lucie Units 1
& 2.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR l ENCL J SIZE:
l+lg TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 Rye%
10 REG 01 EXTERNAL: EG&G SIMPSON, F LPDR NSIC COPIES LTTR ENCL 1
0 1
0 10 10 1'
1 1
1 1
.1 1
1 1
2 2
1 1
RECIPIENT ID CODE/NAME PD2-2 PD NORRIS,J AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 5
5 1
0 1
1 2.
2 1
1 1
1 1
1 1
1 1
1 R
I h
NOZZ 'lO ALL "RIDS" RECIPIENIS:
PIZASE HELP US TO REDUCE HASTE.'ONTACT 'IHE DOCUMENI'GNIBDLDESK, ROOM Pl-37 (EXT. 20079)
TO EIIIKKATEYOUR NME FROM DISTRIBUTION LISTS POR DOCK2KNI'S YOU DON'.'NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 34 ENCL 31
~ 4 1:
1
~X P.O.Box14000,Juno Boach,FL 33408-0420 DEGEMBER 4 8 1988 L-88-524 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
RE:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November 1988 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.
Additionally, a corrected copy of the Unit Shutdown and Power Reductions Report for Turkey Point Unit 3 for the month of October 1988 is attached.
The duration of hours should read 723.6 instead of 722.6, a difference of one hour due to daylight savings time.
Should there be any questions please contact us.
Very truly yours, W. F.
Conway Senior Vice President Nuclear WFC/DMB Attachments cc:
Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident. Inspector, USNRC, St. Lucie Plant SSi'220000S SS12i3 PDR AGOCK 05000250 R