Deficiency Rept Re Erosion Under Cable Tunnel Documented in IE Insp Rept 50-425/80-05.Repairs Completed & Backfilling Activities Resumed.Complete Rept Will Be Filed by 800430
ML19305D699
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/10/1980
From: Dutton D
GEORGIA POWER CO.
To:
References
GM-605, NUDOCS 8004150421
Download: ML19305D699 (2)


Text

%

o-Georgia Power Company Post Office Box 4545 b Atlanta, Georgia 3o3o2 Telephone 404 522-606o Vogtle Proj,ect Southern Company Services, Inc.

Post Offce Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 April 10,1980 United States Nuclear Regulatory Commission File: X78G03 -

Office of Inspecticn and Enforcement Log: GM-605 Region II - Suite 3100 101 Marietta Street, NW Atlanta, GA 30303 Attention: Mr. James P. O'Reilly

Reference:

50-425; Erosion Under Unit 2 Cable Tunnel Gentlemen:

On March 10, 1980 it was reported to your office that a potential report-able item under 10CFR50.55e existed at Plant Vogtle concerning erosion

under the Unit 2 cable tunnel.

This item was reviewed with J. J. Lenahan of NRC's Region II office during an inspection at the Vogtle facility as documented in I&E Inspection Report Numbers 50-424/80-05 and 50-425/80-05. In accordance with these reports we advised the NRC (Messrs. Milton Hunt, Jack Rausch and Lenahan) on March 19, 1980 that we had received the engineering evaluation of this item from Bechtel and that we planned to begin removal of the mud slab in the affected area on March 21, 1980. The evaluation was discussed at that time and on March 27, 1980 we advised Milton Hunt that we were commencing with the required testing and repair work.

The repairs to this area are now complete and we have resumed backfilling activities in the area. A complete report will be filed with your office l by April 30, 1980.

l

This response contains no proprietary information and may be placed in the

'

NRC Public Document Rooms upon receipt.

h u

%%

n Project General Manager 66/7 DED:db' xc: AJ.S. Nuclear Regulatory Commission y*

Attn: Victor Stello, Jr., Director Office of Inspection and Enforcement //o Washington, D.C. 20555 M. D. Hunt, NRC Region II 8004150 NM

.. . ..

.. .- - . .....-. - - - ....

... - . .- - .-.

b e

t United States Nuclear Regulatory Commission Attn: Mr. James P. O'Reilly Page 2  :

April 10, 1980 xc: J. H. Miller, Jr.

W. E. Ehrensperger '

F. G. Mitchell, Jr.

R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton J. T. Beckham, Jr. -

R. W. Staffa K. M. Gillespie  ;

L. T. Gucwa t C. R. Miles, Jr.

E. D. Groover i D. L. ftCrary R. A. Thomas i

0. Batum ,

J. A. Bailey M. Z. Jeric -

B. L. Lex

.

!

r I

l f

4 6

_ - - -

  1. -

_ _ , , .