|
---|
Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] Category:Operating Report
MONTHYEARPNP 2022-002, Annual Report of Changes in Emergency Core Cooling System Models2022-03-24024 March 2022 Annual Report of Changes in Emergency Core Cooling System Models PNP 2019-035, Report of Changes, Tests and Experiments and Summary of Commitment Changes2019-10-0909 October 2019 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2012-047, 2011 Radiological Environmental Operating Report, Letter Through Attachment 32012-05-14014 May 2012 2011 Radiological Environmental Operating Report, Letter Through Attachment 3 ML0710902472007-04-11011 April 2007 Generator Tube Integrity Assessment from the 2006 Refueling Outage ML0428804722004-10-0707 October 2004 Core Operating Limits Report- Revision 13 ML0424001062004-08-24024 August 2004 Core Operating Limits Report - Revision 12 ML0411904322004-04-21021 April 2004 2003 Non-Radiological Environmental Operating Report ML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18353B4751975-08-29029 August 1975 Semiannual Report of Operations, Number 9, for Period of January 1 Through June 30, 1975 2022-03-24
[Table view] Category:Monthly
MONTHYEARML18347A7911978-09-0101 September 1978 Monthly Operating Data & Summary of Operating Experience for August 1978 ML18347A7921978-08-0303 August 1978 Monthly Operating Data & Summary of Operating Experience for July 1978 ML18348A9081978-07-11011 July 1978 Transmittal of Monthly Operating Data, and Summary of Operating Experience for the Month of June 1978 ML18347A7951978-06-12012 June 1978 Monthly Operating Data & Summary of Operating Experience for May 1978 ML18347A7961978-05-0303 May 1978 Monthly Operating Data & Summary of Operating Experience for April 1978 ML18347A7971978-04-0707 April 1978 Monthly Operating Data & Summary of Operating Experience for March 1978 ML18347A7981978-03-0606 March 1978 Monthly Operating Data & Summary of Operating Experience for February 1978 ML18347B2111978-02-0202 February 1978 Monthly Operating Data for January 1978 ML18347A8001978-01-0404 January 1978 Monthly Operating Data for December 1977 ML18347B2121977-12-0202 December 1977 Monthly Operating Data for November 1977 ML18347A8021977-11-0101 November 1977 Monthly Report on Operating Data for October 1977 ML18347A8031977-10-0404 October 1977 Monthly Report on Operating Data for September 1977 ML18347A8041977-09-0707 September 1977 Monthly Operating Data for August 1977 ML18347A7931977-08-0909 August 1977 Appendix D of Monthly Operating Report for July 1977, Reflecting Correction in Net Electrical Energy Generated for Month, Year to Date, & Cumulative to Date ML18347A8051977-08-0101 August 1977 Monthly Operating Data for July 1977 ML18347A8061977-07-0101 July 1977 Monthly Operating Data for June 1977 ML18347A8071977-06-0101 June 1977 Monthly Operating Data for May 1977 ML18347A8081977-05-0101 May 1977 Monthly Operating Data for April 1977 ML18347A8011977-04-0101 April 1977 Monthly Report on Operating Data for March 1977 ML18347A8091977-03-0101 March 1977 Monthly Operating Data for February 1977 ML18347A8111977-02-0707 February 1977 Monthly Operating Data for January 1977 ML18347A8121977-01-0303 January 1977 Monthly Operating Data for December 1976 ML18347A8151976-10-0606 October 1976 Monthly Operating Data for September 1976 ML18347A5701976-09-0202 September 1976 Semiannual Radioactive Effluents Report Covering 1/1/1976 - 6/30/1976, with List of Corrected Data for Errors ML18347B2151976-09-0202 September 1976 Monthly Operating Data for August 1976 ML18347A8171976-08-20020 August 1976 Corrected Appendix D for May, June, & July 1976 Reflecting Correct Maximum Dependable Capacity (MWe-NET) & Corrected Unit Capacity Factor ML18347A8181976-08-0303 August 1976 Monthly Operating Data for July 1976 ML18347A8211976-07-22022 July 1976 Revised Appendix D, Dated 7/22/1976 Which Is Monthly Operating Data for May 1976, Reflects Correcting Figures for Hours Critical ML18347A8191976-07-0202 July 1976 Monthly Operating Data for June 1976 ML18347A8221976-06-23023 June 1976 Revised Appendix E for Month of May 1976 ML18347A8231976-06-0707 June 1976 Revised Appendix D of Monthly Operating Data for May 1976 ML18347A8241976-06-0101 June 1976 Monthly Operating Data for May 1976 ML18347A8251976-05-0303 May 1976 Monthly Operating Data for April 1976 ML18347A8261976-04-0202 April 1976 Monthly Operating Data for March 1976 ML18347A8271976-03-0404 March 1976 Monthly Operating Data for February 1976 ML18347A8281976-02-0505 February 1976 Monthly Operating Data for January 1976 ML18347A8291976-01-15015 January 1976 Monthly Effluent Report for October & November 1975 ML18347A8301976-01-0707 January 1976 Monthly Effluent Report for December 1975 ML18347A8311975-12-0303 December 1975 Monthly Operating Data for November 1975 ML18347A8321975-11-0606 November 1975 Monthly Operating Data for October 1975 ML18347A8331975-10-0606 October 1975 Monthly Operating Data for September 1975 ML18347A8341975-09-0808 September 1975 Monthly Operating Data for August 1975 ML18347A8351975-08-0707 August 1975 Monthly Operating Data for July 1975 ML18346A2041975-07-24024 July 1975 April & May 1975 Effluent Reports, Required by Interim Special Tech Spec of Provisional Operating License ML18347A8361975-07-0202 July 1975 Monthly Operating Data for June 1975 ML18347A8371975-06-0303 June 1975 Monthly Operating Data for May 1975 ML18347A8391975-05-0202 May 1975 Monthly Operating Data for April 1975 ML18347A7781975-04-24024 April 1975 Steam Generator Flushing Report No. 4, Covering Period March 6, 1975 Through March 27, 1975 ML18347A8401975-04-0101 April 1975 Monthly Operating Data for March 1975 ML18347A7791975-03-26026 March 1975 Corrected Steam Generator Flushing Report No 3. Typographical Error in Total Pounds of Phosphate for B Sg. It Should Have Been 299 Not 229 1978-09-01
[Table view] |
Text
.. e I '
- consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Cov,ert, Michigan 4904:f', -:_ l ... :J September 1, 1978 U.S. Nuclear Regulatory Commission Mail and Records Section Washington, D.C., 20555 Re: LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO. 50-255 Gentlemen:
Enclosed is a copy of the *Monthly Operating Data, and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of August 1978 * . *WEAdarns, General Engineer cc: JGKeppler, USNRC RBDeWitt DAB ix el GHPetitjean CVWaits DEVanFarowe, Div. of Radiological Health Lansing, Mich. AKozlowski, Mich. Dept. of Labor RCallen, 'Mich. Public Serv. Comm., Lansing, MI. Document Control -(2) -950-22.35.10
!-. -::*:: .. -: 1 *1**1 .. C.J
(_
W1> ,
.... -' AVERA.GE DAILY UNIT POWER LEI MONTH AUGUST 1978 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 3 *4 5 6 17 7 428 8 71 9 544 10 616 l l 603 12 610 13 578 572 14 15 532 16 543 INSTRUCTIONS DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DOCKET NO. UNIT DATE COMPLETED BY TELEPHONE 50-25.5 Palisades 9-1-78 DIBollnow 616-764-8913 AVERAGE DAILY POWER LEVEL (MWe-Net) 552 545 548 631 633 632 608 588 585 579 578 232 On this format, list the average daily unit power level in MWe-Net for each day in the reporting Inlinth. Compute to. the nearest whole megawatt.
(9/77) . I
\.* ' ( .. ;.__.* .,
- OPERATING DATA REPORT OPERATING STATUS I. Unit Name: . 2. Reporting Period: 3. Licensed Thermal Power (MWt): 4. Nameplate Rating (Gross MWe): Palisades 780801 to 780831 2530 811. 7 805
- 635 5. Design Electrical Rating (Net MWe): 6. Maximum Dependable Capacity (Gross MWe): 7. Maximum Dependable Capacity (Net MWe):
- 675 Notes DOCKET NO. DATE COMPLETED BY TELEPHONE . 50-255 9-1-78 DIBollnow 616-764-8913
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Yr.-to-Date
- 11. Hours In Reporting Period 12. Number Of Hours Reactor Was Critical 744. 516.1 5831 2,853.6 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 496.L 2,524.9 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 17. Gross Electrical Generated (MWH) 18. Net Electrical Energy Generated (MWH) 1,049,064-298,650 277,856 5,182,032 1,523,270 1,418,444
- 19. Unit Service Factor 66.7 43.3 20. Unit Availability Factor 66.7 43.3 21. Unit Capacity Factor (Using MDC Net) 58
- 8 38.3 22. Unit Capacity Factor (Using DER Net) 46. 4 23. Unit Forced Outage Rare 18
- 2 30.2 16.6 24. Shutdowns Scheduled Over Next 6 (Type. Date. and Duration of Each): 25. If Shut Down At End Of Report Period, Estimated Date of Startup: 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION . Forecast Cµmulative 58,742 32,253.0 30,357.1 55,203,696*
17,109,880
- 51. 7 51. 7 43.0 33.9 39.0
- Based on Condenser Backpressure Limitations (9/77) _,,,, ... .. .--.,......
.......
Nu:: Date 17 780731 18 *780807 19 780828 19-F: Forced S: Scheduled . \ (9/77) ,. UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH August 1978 "' 0. >, I-.. s F F Reason: 137.6 20.0 90.3 I"! B 3 A 3 B 1 A-Equipment Failure (Explain) 13-Mainten:.ince or Test ('-Refueling D-Rcgulatory Restriction Licensee Event Report it ; N/A N/A N/A E-Operntor Training & License Examination F-Administrative 3 Method: I-Manual 2-Manual Scram. 3-Automatic Scram. 4-0thcr (Explain)
'* . G-Operntional Error (Explain)
II-Other (Explain)
- DOCKET NO. UNIT NAME DATE COMPLETED BY TELEPHONE Cause & Corrective Action to Prevent Recurrence Repairs to CRDM Seals Feedwater Punip Trip Repairs.to CRDM Seals 4* 50-255 Palisades 9-6-78 DIBollnow 616-764-8913 Exhibit G
- Instructions for Preparation of Data Entry Sheets for Licensee 5 Event Report ( LER) Filr (NUREG-0161) Exhibit I_* Same Soun:c -
. . *-' ,
- CONSUMERS POWER COMPANY PALISADES NUCLEAR PLANT DOCKET 50-255
SUMMARY
OF OPERATING EXPERIENCE FOR AUGUST 1978 GENERAL Except for the outages discussed below, the Plant operated in the range of 80% to 90% of full power during the month. At the beginning of the month, the Plant was shutdown in continuation of an outage which had begun on July 31st. As of August 1st, this outage had been in progress for 2.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. SPECIFIC ITEMS OF INTEREST 8-6-78 8-7-78 8-28-78 The Plant was returned to operation, ending a 137.6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> outage. During the outage, repairs were made to six CRDM seals and oil was added to the 'A' Primary Coolant Pump. During this outage, testing and repair of the Containment Building purge valve T-ring air supplies was connnenced.
This testing and maintenance effort on the seven valves (CV-1803, 1805, 1806, 1807, 1808, 1813 and 1814) continued throughout the month. A Plant trip caused by low Steam Generator water level occurred subsequent to the loss of the 'B' Feedwater Pump. The outage lasted for 20.0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />. During this outage, insulation of boric acid piping was completed, and a ruptured disc on the No. 1 low pressure turbine was replaced.
The Plant was shutdown to permit repairs to CRDM seals and to replace the seal on 'B' Primary Coolant Pump. As of the end of the month, this outage had been in progress for 90.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />. -j